ID |
Date |
Author |
Type |
Category |
Subject |
5497
|
Wed Sep 21 11:35:07 2011 |
steve | Update | VAC | RGA scan |
RGA scan with maglev pumping speed at day 14 of the pump down.
The larger inserted box contains the tuning parameters of the SRS 200 amu RGA |
5529
|
Fri Sep 23 16:25:01 2011 |
steve | Update | VAC | vac rack UPS battery replaced |
APC Smart -UPS 2200 model: SUA2200RM2U batteries were replaced by compatible RBC43, 8x 12V5A |
5542
|
Mon Sep 26 11:35:44 2011 |
steve | Update | Cameras | arms cameras upgraded |
The arm's CCD cameras were reset as picture shows last week.
The height adjustment only works at ITMX. Short post holders are ordered to make this feature available on the rest.
The 75 ohms video and power supply cables are stress relieved. Solid cover can be attached now without miss aligning cameras. |
5562
|
Wed Sep 28 07:36:41 2011 |
steve | Update | SUS | ITMY damping restored |
ITMY suspention damping restored |
5563
|
Wed Sep 28 07:46:42 2011 |
steve | Update | SUS | Dsub connections at the back of 1X5 are fixed |
I'm turning the sus damping off for Dsub connection fix at the back of 1X5 rack
The plan is to install 4-40 jack screws to lock connector positions.
All dewittening(or called coil driver) and wittening D sub connectors are locked with two 4-40 socket head screws |
5587
|
Fri Sep 30 17:01:29 2011 |
steve | Update | SUS | ETMX oplev intensity effect on noise |
Kiwamu and Steve,
This is one of the better oplev set up we have. Single bounce from TM, no mirror on stack. One lens and one mirror on ISCT. Old Uniphase 1103P laser on heafty 3" od mounts.
Somewhat big ~5-6 mm spot on qpd in 1,300 counts.
The intensity noise effect can be seen at 1 Hz and 3-20 Hz
Oplev servo was OFF |
5599
|
Mon Oct 3 08:38:21 2011 |
steve | Summary | VAC | Recovery from the power shutdown is completed |
I failed to start Rana's favorit anciant desktop computer at the vac rack. He has to baby this old beast just a little bit more.
Vacuum status: Vac Normal was reached through Farfalla: Rga was switched back to IFO and and Annuloses are beeing pumped now.
V1 was closed for about a day and the pressure reached ~2.8 mTorr in the IFO. This leakrate plus outgassing is normal
The ref cavity 5000V was turned on.
The only thing that has to be done is to restart the RGA. I forgat to turn it off on Friday.
|
5610
|
Tue Oct 4 07:51:36 2011 |
steve | Update | CDS | c1lsc and c1sus are still down |
c1lsc and c1sus are still down. Only ETMX and ETMY are damped |
5620
|
Wed Oct 5 11:33:25 2011 |
steve | Update | SUS | PRM and BS oplev laser replaced |
JDSU 1103P died after 4 years of service. It was replaced with new identical head of 2.9 mW output. The power supply was also changed.
The return spots of 0.04 mW 2.5 mm diameter on qpds are BS 3,700 counts and PRM 4,250 counts.
|
5622
|
Wed Oct 5 17:08:49 2011 |
steve | Update | SUS | BS oplev spectra |
Kiwamu and Steve,
The He/Ne oplev shows no coherece so relative intensity noise is not limiting factor for the oplev servo |
5630
|
Fri Oct 7 14:04:48 2011 |
steve | Update | SUS | He/Ne intensity noise effect on oplevs |
The SRM bounce peak 18.33 Hz. Suresh helped me to retune filter through Foton, but we failed to remove it.
ITMX_OPLEV_PERROR shows high coherence with oplev laser. This is our lousiest set up. I will work on it next week.
Generally speaking we can say that JDSU-Uniphase 1103P and 1125P laser intensity noise do not limit oplev servo performance.
However, the overall well being of filters, gain settings, beam sizes on qpds are poor.
|
5645
|
Mon Oct 10 16:32:18 2011 |
steve | Update | SUS | UL sensor of ETMY is recovered |
I lost UL osem voltage this morning when I was checking the actual connection at rack ETMY
This after noon I disconnected the 64 pins IDE connector from satelite amp at the rack, and the two 25 pins Dsubs at this juction board.
UL OSEM recovered after reconnecting these three connectors.
Atm3, bad connection.........noisy UL
|
5655
|
Wed Oct 12 08:43:30 2011 |
steve | Update | SUS | ITMX oplev improved a bit |
Atm2 is before optical path adjustment. The idea was to remove possible clipping in vacuum.
Coherense significantly reduced below 4 Hz
Today I will replace the He/Ne laser 1125P with 1103P
|
5660
|
Thu Oct 13 14:23:09 2011 |
steve | Update | SUS | ITMX oplev with 3 mm beam on qpd |
I replaced the JDSU-Uniphase 1125P by 1103P He/Ne laser. This new laser had 2.8 mW output yesterday. It degraded to 0.5 mW by this morning.
The beam size on the QPD is ~3 mm This should give us better sensitivity. These are not the perfect lenses at all, but we have them here.
On the other hand, there are still some coherence below 1 Hz, so the laser intensity noise or clipping dominating this part of the spectrum.
|
5675
|
Mon Oct 17 07:57:24 2011 |
steve | Update | SUS | ETMX sus damping restored |
|
5680
|
Mon Oct 17 17:07:30 2011 |
steve | Update | SUS | ETMX oplev returning beam od 3 mm |
ETMX oplev had 6 mm diameter beam on the qpd. I relayed the beam path with 2 lenses to get back 3 mm beam on the qpd
BRC 037 -100 Bi _concave lens and PCX 25 200 VIS do the job. Unfortunately the concave lens has the AR 1064.
|
5692
|
Wed Oct 19 08:34:16 2011 |
steve | Update | SUS | SRM sus damping restored |
Sorry Kiwamu, I realized too late that you were freeswigging. Hopefully 4 hrs was enough. |
5693
|
Wed Oct 19 09:44:10 2011 |
steve | Update | SUS | ETMX oplev power spectrum |
Quote: |
ETMX oplev had 6 mm diameter beam on the qpd. I relayed the beam path with 2 lenses to get back 3 mm beam on the qpd
BRC 037 -100 Bi _concave lens and PCX 25 200 VIS do the job. Unfortunately the concave lens has the AR 1064.
|
Coherence at 1 and 2-3 Hz only. He/Ne laser intensity noise is not an issue. |
5701
|
Wed Oct 19 16:28:35 2011 |
steve | Update | Green Locking | ETMY mechanical shutter is working |
Quote: |
Uniblitz mechanical shutter installed in the green beam path at ETMY-ISCT The remote control cable has not been connected.
|
The ETMY shutter can be remotely switched from medm screen POY of mechanical shutters.
The new cable from ETMY controller goes to east vertex EV-ISCT where it is connected to POY shutter hook up BNC cable. |
5712
|
Thu Oct 20 12:43:19 2011 |
steve | Update | SAFETY | refilled first aid kits & their locations |
First aid kits are located close vicinity of entry doors and under circuit breaker panels.
|
5719
|
Fri Oct 21 09:08:33 2011 |
steve | Update | SUS | MC2 Misalignment |
Thinks to do before the NEXT realignment:
B, tie 4 ancher bolts on table legs to the floor
C, tie 4 dog clamps between table and chamber
D, check the locked position of the 4 x 4 positioning screws
E, check bellow protecting 4 tubes are not shorting
A, here is the concrete slab cut
It reminds me to check the IFO vacuum envelope dog clamps on the chambers to floor with torque wrench.
|
5720
|
Fri Oct 21 10:32:14 2011 |
steve | Update | PSL | PSL laser turned off |
In order to move the emergency shut off switch in room 103 I had to turn off the 2 W Innolight laser. This job will take an hour.
|
5721
|
Fri Oct 21 11:02:47 2011 |
steve | Update | PSL | PSL laser turned ON |
Quote: |
In order to move the emergency shut off switch in room 103 I had to turn off the 2 W Innolight laser. This job will take an hour.
|
It is back on. |
5728
|
Mon Oct 24 14:26:01 2011 |
steve | Update | General | no electricity on Nov. 19 |
Subject: Electricity Interruption- 11/19/11
From: "PP Service Center" <PPService@caltech.edu>
To: "DeLaRosa, Dario" <Dario.DeLaRosa@caltech.edu>,
...snip... "Sullivan, Joan O." <sully@caltech.edu> |
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: Central Engineering Services (C.E.S.)
LIGO Gravitational Physics building adjacent to C.E.S.
Safety Storage adjacent to CES
Steele House
Keck Lab
Date: November 19, 2011
Time: 8:00 a.m. To 9:00 a.m.
Interruption: Electricity
Contact: Mike Anchondo ext. 4999 Tom Brennan 4984
*This interruption is required for maintenance of high voltage switchgear in Campus Sub Station.
|
5741
|
Wed Oct 26 10:07:16 2011 |
steve | Update | General | no electricity ....... will be recheduled |
Quote: |
Subject: Electricity Interruption- 11/19/11
From: "PP Service Center" <PPService@caltech.edu>
To: "DeLaRosa, Dario" <Dario.DeLaRosa@caltech.edu>,
...snip... "Sullivan, Joan O." <sully@caltech.edu> |
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: Central Engineering Services (C.E.S.)
LIGO Gravitational Physics building adjacent to C.E.S.
Safety Storage adjacent to CES
Steele House
Keck Lab
Date: November 19, 2011
Time: 8:00 a.m. To 9:00 a.m.
Interruption: Electricity
Contact: Mike Anchondo ext. 4999 Tom Brennan 4984
*This interruption is required for maintenance of high voltage switchgear in Campus Sub Station.
|
CANCELLED, WILL BE RESCHEDULED* |
5759
|
Fri Oct 28 18:33:59 2011 |
steve | Update | VAC | leaking nitrogen line fixed |
I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply line to atm. Fixed leak.
This was done fast so the pumps did not have to be shut down. Pressurized supply line and open valves to
"Vac Normal" condition in the right sequence. |
5767
|
Mon Oct 31 08:55:19 2011 |
steve | Update | VAC | pressure plot at day 53 |
Quote: |
I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply line to atm. Fixed leak.
This was done fast so the pumps did not have to be shut down. Pressurized supply line and open valves to
"Vac Normal" condition in the right sequence.
|
|
5768
|
Mon Oct 31 09:42:12 2011 |
steve | Update | IOO | PMC locked |
The PMC HV drops off more offen lately. |
5771
|
Mon Oct 31 15:58:25 2011 |
steve | Update | SUS | thinking of black glass baffles for 40m |
Shade 12 black glass-green lines: 1/8" thick, 6" wide x 7 " high mounted on angle bracket below. Aperture 1" diameter. Let me know what do you think.
|
5782
|
Wed Nov 2 10:04:05 2011 |
steve | Update | SUS | MC2 chamber anchoring tightened |
Quote: |
Thinks to do before the NEXT realignment:
B, tie 4 ancher bolts on table legs to the floor
C, tie 4 dog clamps between table and chamber
D, check the locked position of the 4 x 4 positioning screws
E, check bellow protecting 4 tubes are not shorting
A, here is the concrete slab cut
It reminds me to check the IFO vacuum envelope dog clamps on the chambers to floor with torque wrench.
|
I locked the PMC and MC resonated in TM00 right on. Than I started checking anchoring screws with the torque wrench.
B, 3/8 foor bolts were tight, They were set to 50 ft/lbs
C, dog clamp bolts were tight at 80 ft/lbs
D, horizontal position locks were lose. They were locked by finger.
E, below covers were reset not to short
The MC is locking in TM01 mode now |
5783
|
Wed Nov 2 10:41:47 2011 |
steve | Update | General | 2 spare heliax at the LSC rack |
They were traced and labeled. One goes to 1X2 and the other to AS-ISCT. They are Andrew Heliax 1/4" od. made by CommScone, model number FSJ1-50A |
5826
|
Mon Nov 7 08:08:24 2011 |
steve | Update | IOO | PMC locked |
The PMC acted like it was sleeping. The HV slider was dead. The MC locked instantly as the PMC had transmission. |
5827
|
Mon Nov 7 08:25:15 2011 |
steve | Update | General | no electricity on Nov. 20 |
The Nov.19 interruption was rescheduled to be on Nov.20,2011
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: CENTRAL ENGINEERING SERVICES, STEELE HOUSE, KECK LAB,
LIGO GRAVITATION PHYSICS BLDG, SAFETY STORAGE (BY CES)
Date: Sunday, Nov. 20,2011
Time: 10:00 AM TO 11:00 AM
Interruption: ELECTRICITY
Contact: MIKE ANCHONDO X-4999 OR TOM BRENNAN X-4984
*THIS INTERRUPTION IS REQUIRED FOR MAINTENANCE OF HIGH VOLTAGE SWITCHGEAR
IN CAMPUS SUB-STATION. |
5831
|
Mon Nov 7 14:58:17 2011 |
steve | Update | General | Chamber illuminator remote switches installed |
nullQuote: |
I'm looking for an ether net based power switch for turning lights on and off for the vacuum system from MEDM screen. This is what I found
Jamie please take a look at it.
|
I installed 4 remote AC power on/off strip at
1Y1 for the Vertex area 4 chamber illuminating lights ( CIL )
1Y3 for HV ps for PZT steering mirrors that should be interlocked with P1 pressure gauge. Power off above 3 mTorr
1Y4 for ETMY CILs,
1X9 for ETMX CILs
I need one volunteer to help me to make MEDM screen and connect the network to the switches. |
5844
|
Wed Nov 9 07:57:39 2011 |
steve | Update | SUS | ETMX oplev is down and sus damping restored |
The ETMX oplev returning beam is well centered on the qpd. We lost this signal 2 days ago. I will check on the qpd.
ETMX sus damping restored. c1iscex computer is down |
5887
|
Mon Nov 14 15:46:14 2011 |
steve | Update | VAC | TP2's forepump changed |
The foreline pressure of TP2 was 1.4 Torr this morning. This drypump worked well for ten months.
Recently rebuilt drypump with new seal was swapped in.
This is how you do it: close V1, V4 and turn off TP2. Replace drypump and start up TP2
Set pump speed to 50 K rpm and open V4 to TP1 Note that the Maglev was not turned off because V4 was closed off only 5-10 minutes.
Open V1 the status is Vac Normal.
TP2 is rotating at 50K rpm, current pick up 0.2A, the temp is 26C and its foreline pressure 33 mTorr |
5897
|
Tue Nov 15 16:16:34 2011 |
steve | Update | PSL | enclosure interlocks are working on all sliding doors |
Ben and Sam came over to fix one of the east side sliding door sensor that had to be moved from the inside to outside on the enclosure.
We turned off the 2w Innolight for 20minutes. The power is back on, the PMC and MC locked itself immediately. |
5898
|
Tue Nov 15 16:25:38 2011 |
steve | Update | PSL | IOO angle qpd centered |
This moring I centered the IOO Angle QPD. The IOO Pos QPD was not centered. The existing layout does not allow the beam centering of the Pos qpd without misaligning the MC
input. We have to add an aditional steering mirror. I will do that tomorrow morning. |
5907
|
Wed Nov 16 10:11:20 2011 |
steve | Update | PSL | IOO angle & pos qpd centered |
Quote: |
This moring I centered the IOO Angle QPD. The IOO Pos QPD was not centered. The existing layout does not allow the beam centering of the Pos qpd without misaligning the MC
input. We have to add an aditional steering mirror. I will do that tomorrow morning.
|
I added the steering mirror for Pos and centered both qpds |
5909
|
Wed Nov 16 10:25:57 2011 |
steve | Update | SUS | PRM damping restored |
The PRM lost damping about a day ago. It was restored. |
5912
|
Wed Nov 16 14:34:18 2011 |
steve | Update | PSL | IOO beam moves in pitch |
C1:IOO-QPD_ANG_VERT beam movement in 1 degree C temp change in 3 hrs
|
5927
|
Thu Nov 17 15:19:06 2011 |
steve | Update | SUS | Ti spring plunger to hold OSEM is not affortable |
Our existing 300 series SS plungers from McMastercar #8476A43 are silver plated as Atm2 shows.
Problems: 1, they become magnetized after years being close to the magnets
2, they oxidize by time so it is hard to turn them
I looked around to replace them.
Titanium body, nose and beryllium copper spring. None magnetic for UHV enviorment.
Can be made in 7 weeks at an UNREASONABLE $169.00 ea at quantity of 50 |
5950
|
Fri Nov 18 16:37:14 2011 |
steve | Update | VAC | preparing for ac power interruption |
The vacuum is ready for no AC power for 1 hr on Sunday morning at 10am
I did the follwing:
Closed V1, stopped the rotation of TP-1 maglev, waited till it reached 0 Hz_ rpm and turned it's controller off.
Closed V4 and stopped TP-2 rotating
Closed all annuloses and VA6
Closed VM1 and opened VM3 This means the RGA is being pumped by TP3. RGA is running in background mode. V5 will close instantly as the AC will be turned off.
VAC STATUS: IFO envelope and annulosses are not pumped. P1 pressure will reach 5-6 mTorr by Sunday morning.
The PSL output shutter will be closed by the interlock at 3 mTorr
Kiwamu will turn off Piezo Jena PZT power supplies and computers Saturday.
I will be here around 1pm Sunday to star pumping. I will need EPICs MEDM running by than. |
5962
|
Sun Nov 20 13:51:54 2011 |
steve | Update | VAC | vacuum is back up after ac interruption |
State condition: Vac Normal, CC1 ~8e-6 Torr
The IFO pressure peaked at 8.3 mTorr after 2days of not pumping. |
6025
|
Mon Nov 28 15:43:36 2011 |
steve | Update | RF System | EOM temp zoomed |
Quote: |
Quote: |
Here is 5 days of trend of the EOM temp sensor and the heater driver monitor. Unfortunately, it looks like we're regularly railing the heater. Not so awesome.
|
Can you zoom the temp mon? (V= -0.1 ~ +0.1)
The crystal was too cold and I tried to heat the PSL table by the lighting. But it seemed in vain.
|
It is not working |
6036
|
Tue Nov 29 15:25:29 2011 |
steve | Update | RF System | EOM temp stabilization performance |
It is not obvious what is working.
|
6058
|
Thu Dec 1 11:25:10 2011 |
steve | Update | PEM | 40m infrastructure holds up well in strong wind condition |
Santa Anna wind speed was locked around 60 kmph last night on campus. The strongest in 30 years. The lab hold up well. We did not lose AC power either.
Threes and windows were blown out and over on campus.
We have 4 sliding glass windows without "heavy-laser proved" inside protection.
We should plan to upgrade ALL sliding glass windows with metal protection from the inside.The strongest in 30 years. |
6120
|
Wed Dec 14 14:40:53 2011 |
steve | Update | Green Locking | delay line bnc cable specs |
The existingly used used Pasternack Enterprices RG58 C/U cable lenght ~ 140 ft and the specs are here at Atm1
Atm2 The performance grade RG58-P coaxial cable specs. |
6139
|
Tue Dec 20 15:49:21 2011 |
steve | Update | PEM | optical table top |
3/4 " thick colored acrylic material will be used in this air tight design. Surgical tubing for o-ring. We may have to put an o-ring into the bottom to have it really air tight.
Feedtrouhs: www.roxtec.com
The top drawing is not ready. It will have handle and industrial grade L-handle lock pin to hold cover down. There will be 2 one inch od post in the midle of the table to hold the cover and lock the ball pin.
I'm waiting for your inputs, so I can send this preliminary design out for quote.
|
6168
|
Wed Jan 4 09:06:50 2012 |
steve | Update | Computers | possible front-end timing issue |
Quote: |
Quote: |
Is there a reason the framebuilder status light is red for all the front ends?
Also, I reenabled PRM watchdog.
|
Apparently there is a bug in the timing cards having to do with the new year roll-over that is causing front-end problems. From Rolf:
For systems using the Spectracom IRIG-B cards for timing information, the code did not properly roll over the time for
2012 (still thinks it is 2011 and get reports from DAQ of timing errors (0x4000)). I have made a temporary fix for this
in the controller.c code in branch-2.3, branch-2.4 and release 2.3.1.
I was going to check to see if the 40m is suffering from this. I'll be over to see if that's the problem.
|
The problem is the same as yesterday. |