  15532   Mon Aug 17 23:41:50 2020 gautamUpdateBHDWhitening and air BHD dark noiseSummary:

With the chosen transimpedance
of 300 ohms, in order to be able to see the
 BHD_whitening.pdf 
  15531   Mon Aug 17 23:36:10 2020 gautamUpdateALSWhitening and ALS noiseI finally managed to
install a differential-receiving whitening
board in 1Y2 - 4 channels are available at
 ALSimprovement.pdf 
  15530   Mon Aug 17 21:24:43 2020 gautamUpdateGeneralFire extinguisher inspectionA technician came to the lab today at ~4pm.
He entered the VEA (with booties and googles),
and also the clean and bake lab. The whole
  
  15529   Mon Aug 17 15:18:26 2020 gautamUpdateEquipment loanBeam Profiler + peripherals --> 40mGabriele left the DataRay beam profiler
+ peripherals (see Attachment
 IMG_8719.JPG 
  15528   Sat Aug 15 15:12:22 2020 JonConfigurationVACOverhaul of small turbo pump interlocksSummary

Yesterday I completed
the switchover of small turbo pump interlocks
as proposed in ELOG
 small_tp_signal_routing.pngsmall_tp_interlock_signal.pngsmall_tp_signal_routing.pngmedm_screen.png 
  15527   Sat Aug 15 02:02:13 2020 JonConfigurationVACVacuum repairs todayVacuum work is completed. The TP2 and TP3
interlocks have been overhauled as proposed
in ELOG
  
  15526   Fri Aug 14 10:10:56 2020 JonConfigurationVACVacuum repairs todayThe vac system is going down now for planned
repairs [ELOG
15499]. It will likely take most
  
  15525   Fri Aug 14 10:03:37 2020 JonUpdateCDSTiming distribution slot availabilityThat's great news we
won't have to worry about a new timing
fanout for the two new machines, c1bhd and
  
  15524   Fri Aug 14 00:01:55 2020 gautamUpdateCDSBHD / OMC model channels now added to autoburtI added the EPCIS channels for the c1omc
model (gains, matrix elements etc) to the
autoburt such that we have a record of these,
  
  15523   Thu Aug 13 18:10:22 2020 gautamUpdateGeneralPower outageThere was a power outage ~30 mins ago that
knocked out CDS, PSL etc. The lights in the
office area also flickered briefly. Working
  
  15522   Thu Aug 13 13:35:13 2020 KojiUpdateCDSTiming distribution slot availabilityThe new dolphin eventually helps us. But
the installation is an invasive change to
the existing system and should be done at
  
  15521   Thu Aug 13 11:30:19 2020 gautamUpdateCDSTiming distribution slot availabilityThat's great. I wonder if we can also
get away with not adding new Dolphin infrastructure.
I'd really like to avoid changing any
  
  15520   Wed Aug 12 20:16:52 2020 KojiUpdateElectronicsPhotodiode inventoryWhen I tested Q3000 for aLIGO, the failure
rate was pretty high. Let's get 10pcs.
  
  15519   Wed Aug 12 20:15:42 2020 KojiUpdateElectronicsNumber of the beastGrrr. Let's repair the unit. Let's
get a help from Chub & Jordan.

Do you have a second unit in the
  
  15518   Wed Aug 12 20:14:06 2020 KojiUpdateCDSTiming distribution slot availabilityI believe we will use two new chassis at
most. We'll replace c1ioo from Sun to
Supermicro, but we recycle the existing timing
  
  15517   Wed Aug 12 18:08:54 2020 gautamUpdateElectronicsNumber of the beastThe "source"
output of the SR785 has a DC offset of -6.66
 IMG_8710.JPG 
  15516   Wed Aug 12 17:42:58 2020 gautamUpdateElectronicsPhotodiode inventorySee Attachments
#1 and #2.
 IMG_8709.JPGIMG_8708.JPG 
  15515   Wed Aug 12 17:36:42 2020 gautamUpdateCDSTiming distribution slot availabilitySee Attachment
#1. J8 was connected
 IMG_8706.JPG 
  15514   Tue Aug 11 23:20:29 2020 gautamUpdateBHDSome first tests with air BHD setupSome tests done today:

All of these tests were done with
the PRMI locked with carrier resonant in
 PRMI_RFlock.pdfPRMI_RFlock_fullscale.pdf 
  15513   Mon Aug 10 16:52:04 2020 gautamUpdateBHDWorkable setup preparedAll the details are in E2000436,
and documents linked from there, I think
an elog would be much too verbose. In summary,
  
  15512   Mon Aug 10 07:13:00 2020 YehonathanUpdateBHDMonte Carlo SimulationsI fixed some stuff in the MCMC simulation:

1. Results are now plotted as shades
from minimum to maximum. I tried making the
 8x 
  15510   Sat Aug 8 07:36:52 2020 Sanika KhadkikarConfigurationCalibration-RepairBS Seismometer - Multi-channel calibrationSummary : 

I have been working on analyzing
 BS_X-EY_X.pngBS_Y-EY_Y.pngBS_Z-EY_Z.pngtimeseries.png 
  15509   Fri Aug 7 11:23:47 2020 ranaUpdateBHDMonte Carlo Simulationsthat's great. I think we would like
to figure out how to present this so that
its clear what the distribution of TFs is.
  
  15508   Thu Aug 6 22:57:20 2020 gautamUpdatesafetyNew live HV SuppliesBe aware that there is now a KEPCO HV supply
that is energized, sitting on the floor immediately
adjacent to the OMC rack, east of the AP
  
  15507   Thu Aug 6 00:34:38 2020 YehonathanUpdateBHDMonte Carlo SimulationsI've pushed an MCMC simulation to the
A+ BHD repo (filename MCMC_TFs.ipynb). The
idea is to show how random offsets around
 8x 
  15506   Thu Jul 30 16:16:43 2020 gautamUpdateSUSSuspension recoveryThis
earthquake and friends had tripped all
watchdogs. I used the scripted watchdog re-enabler,
  
  15505   Wed Jul 29 11:57:59 2020 ranaUpdateBHDIn-air BHD - CDS and wiring summary3. I agree - this whitening will be handy
to have for diagnostics.

4. I think in principle, we can
  
  15504   Tue Jul 28 14:11:14 2020 JonUpdateVACVac interlock test today 1:30 pmThis test has been completed. The IFO configuration
has been reverted to nominal.

For future reference: yes,
  
  15503   Tue Jul 28 13:55:11 2020 HangUpdateBHDExploring bilinear SRCL->DARM couplingWe explore bilinear SRCL to DARM noise
coupling mechanisms, and show two cases that
by doing BHD readout the noise performance
 SRCL_bilin_DHARD.pdfARM_RIN.pdfSRCL_bilin_SRCL.pdf 
  15502   Tue Jul 28 12:22:40 2020 JonUpdateVACVac interlock test today 1:30 pmThis afternoon Jordan is going to carry
out a test of the V4 and V5 hardware
interlocks. To inform the interlock improvement
  
  15501   Mon Jul 27 15:48:36 2020 JonSummaryVACVacuum parts orderedTo carry out the next steps of the vac
refurbishment plan [ELOG
15499], I've ordered parts necessary
  
  15500   Fri Jul 24 15:40:59 2020 JordanUpdateVACInstallation of two new UPS unitsI installed the Tripp
Lite SMX1000RT2U and Tripp
Lite Smart1000LCD at the
 UPS.jpg 
  15499   Thu Jul 23 15:58:24 2020 JonSummaryVACVacuum controls refurbishment planThis year we've struggled with vacuum
controls unreliability (e.g., spurious interlock
triggers) caused by decaying hardware. Here
  
  15498   Tue Jul 21 16:41:46 2020 gautamUpdateBHDPMC assembly space I decided to use the old EY auxiliary optics
table, which is now stored along the east
arm about 10 m from the end, as a workspace
 IMG_8635.JPG 
  15497   Tue Jul 21 00:30:24 2020 gautamUpdateBHDIn-air BHD - LO RINAttachment
#1 shows the RIN of
 LO_RIN.pdf 
  15496   Mon Jul 20 19:21:16 2020 anchalSummaryALSFew proposals for Voyager ALSI've added 4
proposed schemes for implementing ALS
in voyager. Major thing to figure out is
 VoyagerALSSchemes.pdf 
  15495   Mon Jul 20 17:55:15 2020 gautamUpdateBHDIn-air BHD - preparing the LO pathThe LO pickoff has been coupled into a
fiber with ~90% MM (8 mW / 9 mW input). While
I wait for the DCPD electronics to be found
  
  15494   Mon Jul 20 17:23:46 2020 gautamUpdateElectronicsCoil drivers for the test massesSummary:

Looking at the signals to the test
mass coils, it seems borderline
 ALSlock_timeDomain.pdfALSlock.pdfRFlock.pdf 
  15493   Sun Jul 19 15:40:15 2020 gautamUpdateBHDIn-air BHD - CDS and wiring summaryAttachment
#1 shows the proposed
 wiringDiagram.pdf 
  15492   Fri Jul 17 09:03:58 2020 JordanUpdateGeneralPresence at 40mI will be in the Clean and Bake lab today
from 9am to 4pm.
  
  15491   Fri Jul 17 00:18:13 2020 gautamUpdateGeneralLocking updat
I found that an EPICS channel wasn't
reset to the correct value by burtrestore
after the FE bootfest yesterday.

This
  
  15490   Thu Jul 16 14:41:22 2020 gautamUpdateGeneralFire extinguisher inspectionThe (masked) tech accessed all areas in
the lab (office area, control room, VEA)
between ~230pm-3pm. The laser safety goggles
  
  15489   Thu Jul 16 01:12:22 2020 gautamUpdateBHDIn-air BHD - preparing the LO pathAttachment
#1 - The 80mW pickoff
 IMG_8626.JPGIMG_8627.JPGIMG_8628.JPGIMG_8629.JPG 
  15488   Wed Jul 15 21:08:43 2020 gautamUpdateElectronicsETM coil outputs DQedTo facilitate this investigation, I've
DQed the 4 face coil outputs for the two
ETMs. EX is currently running with 5 times
 CDS.pngcoilOutDQed.png 
  15487   Wed Jul 15 20:58:40 2020 gautamUpdateGeneralEmergency light on in control roomTrue - it is now not on anymore.




  
  15486   Wed Jul 15 19:51:51 2020 KojiUpdateGeneralEmergency light on in control roomIt happened before too. Doesn't it
say it has occasional self-testing or something?
  
  15485   Wed Jul 15 19:23:44 2020 gautamUpdateGeneralEmergency light on in control roomThe emergency lamps above the exit sign
on the NW entrance to the control room are
on. I tried opening and closing the door,
  
  Draft   Wed Jul 15 19:17:09 2020 gautamUpdateBHDIn-air BHD - alignment into OMCYou can activate all 3axis

 
  
  15483   Wed Jul 15 19:11:40 2020 gautamUpdateBHDIn-air BHD - alignment into OMCI forgot about the pointing - probably
we will need another actuator to control
the pointing of the AS beam onto the DCPDs.
  
  15482   Wed Jul 15 17:46:05 2020 anchalSummaryALSNoise budget for ALS I started my attempt on noise budgeting
of ALS by going back to how Kiwamu did it
and adding as many sources as I could find
 ALS_nb.pdf 