  16709   Mon Mar 7 16:44:15 2022 Ian MacMillanUpdateSUSETMY SUS Electronics Replacement

Now that the ETMSUS is back up and running I reran my measurements from the beginning of the process. The results below show a change in gain between the before and after measurements. I have given values of the low-frequency section below.

Average Gain difference from the TFs: 18.867  (excluding thee side change)

  Before After Gain difference
UL -31 dB -5 dB 19.952
UR -36 dB -10 dB 19.952
LR -27 dB -2 dB 17.782
LL -37 dB -12 dB 17.782
SIDE -48 dB -45 dB 1.412

I also am noting the new values for the OSEM DC output: average gain increase: 9.004

OSEM DC OFFSET Before DC OFFSET After Gain increase
UL 557 5120 9.19
UR 568 5111 8.99
LR 780 7041 9.02
LL 385 3430 8.91
SD 328 2922 8.91

In addition, the oplev position was:

  Before After
 OPLEV_PERROR -16.055 -16.715
 OPLEV_YERROR -6.667 -16.597

All data and settings have been included in the zip file

From the average gain increase of the TFs which indicates the increase of the whole system and the increase in gain from the OSEM we can calculate the gain from the actuators.

18.867/9.004 = 2.09

thus the increase in gain on the actuator is about 2.09

EDIT: I updated the side TF with one with better SNR. I increased the excitation amplitude.

Attachment 1: UR_TF_Graph.pdf
UR_TF_Graph.pdf
Attachment 2: UL_TF_Graph.pdf
UL_TF_Graph.pdf
Attachment 3: LR_TF_Graph.pdf
LR_TF_Graph.pdf
Attachment 4: LL_TF_Graph.pdf
LL_TF_Graph.pdf
Attachment 5: SD_TF_Graph.pdf
SD_TF_Graph.pdf
Attachment 6: 20220307_SUSElectronicsAfterTests.zip
  16710   Mon Mar 7 16:56:08 2022 YehonathanUpdateBHDRe-susspension of AS1

{Paco, Yehonathan}

We tried to roughly balance the adapter with two counterweights at the front, like with the other thin optics using an iris. As before, we couldn't get the beam above the iris hole no matter how much we inserted the counterweights into the adapter. We noticed that one of the side blocks is actually the one where the clearance for the wire was made on the wrong side. So there was clearance on both the up and bottom sides of the side block (see attachment 1).

Could this be the cause of the balancing issue? Running out of ideas on how to fix it we gave it a try and replaced it with a spare side block. We also found that the wire on the other side block was kinked so we replaced the wire on this one as well.

After inserting new wires into the side blocks, we hung the adapter on the winches and the beam was above the iris aperture! How could this tiny amount of missing mass make this much difference?

We were able to roughly balance the adapter.

We then tried to balance the roll of the adapter but accidentally knocked off the side magnet 😫.

We usually glue several side magnets together and they all together support the metallic plate on which the magnets are magnetically attached to. This time we had only one side magnet to glue so instead of trying to glue the magnet vertically we are trying to glue it horizontally using a flat surface and a stage to clamp it (attachments 2,3).

BTW, the HeNe was not working when we came into the cleanroom. We realized it was the old HeNe that we already determined to be broken but there was no sign on it. I attached a "BAD" sign on it and replaced it with the new HeNe. The OpLeve beam was realigned. All of this happened before all the things described above

Attachment 1: signal-2022-03-07-171520_001.png
signal-2022-03-07-171520_001.png
Attachment 2: signal-2022-03-07-172659_001.jpeg
signal-2022-03-07-172659_001.jpeg
Attachment 3: signal-2022-03-07-172659_003.jpeg
signal-2022-03-07-172659_003.jpeg
  16711   Mon Mar 7 18:53:16 2022 KojiUpdateBHDRe-susspension of AS1

Not sure if that small difference can cause the alignment inability. Particularly, the removed metal was just below the wire. This means that there is no misalignment effect at the first order.

Here is my idea:
You may be able to assist the alignment by adding washers on one side of the four holes to this "H" shaped parts. The holes are away from the center line, adding some weight definitely do some misalignment.

 

  16713   Tue Mar 8 12:08:47 2022 TegaUpdateVACOngoing work to get the FRG gauges readouts to EPICs channels

OMG, it worked! It was indeed a calibration issue and all I had to do was press the "OK" button after selecting the "CAL" tab beside the pressure reading. Wow.

Quote:

Great trouble shoot!

> I guess, the only remaining issue now is the incorrect atmospheric pressure reading of 1000 Torrs. 

This is just a calibration issue. The controller should have the calibration function.
(The other Pirani showing 850Torr was also a calibration issue although I didn't bother to correct it. I think the pirani's typically has large distribution of the calibration values and requires individual calibration)

 

Attachment 1: XGS600_calibration.pdf
XGS600_calibration.pdf
  16714   Tue Mar 8 12:24:13 2022 YehonathanUpdateBHDRe-susspension of AS1

The gluing seemed to be successful. I assembled the side block with the magnet on the adapter. Paco helped me hang the adapter on the SOS tower.

The height and roll of the adapters were balanced (attachment 1,2).

The QPD was placed at the beam reflection. The beam was centered horizontally on the QPD and then measured vertically. The pitch DOF was balanced using the counterweights. The counterweight was locked. Balance was retained.

I tried to assemble the upper mirror clamp on the tower but for some reason, one of its tap holes was not able to accept screws. I gave it to Jordan for retapping. I measured the motion spectrum using the QPD connected to a scope (attachment 3).

Major peaks are at 668mHz, 942mHz, and 1029mHz.

 

Attachment 1: AS1_Roll_Balance.png
AS1_Roll_Balance.png
Attachment 2: AS1_Height_Balance.png
AS1_Height_Balance.png
Attachment 3: FreeSwingingSpectra_new.pdf
FreeSwingingSpectra_new.pdf
  16715   Tue Mar 8 19:29:36 2022 PacoUpdateBHDRe-balance of AS1

[Paco]

Installed AS1 in vacuum, near the center of the table, and installed the OSEMs. All OSEMS are "balanced" nominally, i.e. their shadow is at the halfway point optimum, but fine tuning is required, which I will attempt tomorrow after restoring the AS1 suspension screen settings. Today, I tried damping the SIDE DOF, but didn't succeed, although there was definitely some oscillating behaviour with high (> 5) gains on the damping, so I believe this is a matter of patience. For now, all OSEMs are looking ok, the SOS is in place, and hopefully it will soon be damped. 

  16716   Wed Mar 9 09:35:26 2022 PacoUpdateBHDRe-balance of AS1

[Paco]

AS1 is installed, OSEMs balanced, and the optic damped successfully. We should run the free swinging test overnight to validate this re-installation.

  16717   Wed Mar 9 10:23:28 2022 JordanUpdateVACLeak Testing of New Manual Gate Valve - Attempt #1

Jordan, Chub, Paco

Chub and I went into the lab this morning to leak check the new gate valve after pumping over the weekend. This would be done through the RGA and spraying helium around the newly installed flanges. The RGA is set to monitor the partial pressure of helium versus time and we visually watch for any spikes in pressure to indicate an air leak.

So, I mistakenly thought the gate valve was opened and both sides were being pumped on, this was not the case. The vavle was closed so there was a pressure differential whenI turned the handle it tripped the interlocks and closed V4. I closed VM3 to the RGA volume to prevent the filament from being damaged.

Then the medm screen for the vac controls started flashing rapidly, I closed the window and reopened the controls to find all the panels were white, but we could still see the read only vac screen. So Paco restarted c1vac and the controls were restored. V7 closed, but was then reopened.

We now need to restart pumping with the odd pressure differentials between V4 and VM3.

Plan

- TP2 turned off along with the AUX pump

- VM3 opened to vent RGA volume (RGA turned off, filament cooled)

- Open the manual vent screw on TP1 to bring the RGA+TP1 volume back to atmosphere, now no pressure diff. on V4

- Open V4, restart AUX pump to rough out the volume

- Connect RP1/3 line to the pump scroll, turn on RP1/3 RGA+TP1 volume went to mtorr

- Slowly open the manual gate valve

- Connect AUX pump to TP2 and rough out

- Restart TP2, once at speed open V4, close V6 and turn off RP1/3

Now we are pumping on the RGA/TP1 volume with TP2, leak check attempt #2 will happen tomorrow morning

  16718   Wed Mar 9 11:52:18 2022 YehonathanUpdateBHDSimplified BHD readout sketch on ITMY table

I have made an editable draw.io diagram of the planned simplified BHD setup on the ITMY table (see attached).  10 pts = 1 inch.

This is very sketchy but easily adjustable since we are removing everything but the ITMY Oplev from that table.

Attachment 1: ITMY_Table_Sketch.drawio.pdf
ITMY_Table_Sketch.drawio.pdf
  16719   Wed Mar 9 12:57:52 2022 KojiUpdateBHDSimplified BHD readout sketch on ITMY table

- BHD beams were already mixed in the chamber. So we don't need a BS on the table. (Probably there is no BS already)

- We don't need to split each BHD beam. One PD per BHD beam is OK for now.

- Check if the BHD paths have reasonable angles from the windows so that the beams do not hit the chamber wall.

- We need the POY path. POY indeed goes to the BS table

  16721   Thu Mar 10 09:39:59 2022 JordanUpdateVACLeak Testing of New Manual Gate Valve - Attempt #2

This morning Chub and I leak checked the manual gate valve with the RGA and helium. There was no change in the helium partial pressure while spraying helium around the flanges, all looks good.

 

I also took a 100 AMU analog scan, after the filament had warmed up overnight and the plot was quite noisy even with the lowest scan speed. I recommend this unit go back to SRS for a filament replacement/recalibration. I am worried yesterday's "vent" of the RGA volume may have burned the filament. See the comparison of yesterday's analog scan to today's below.

Attachment 1: 3-09-2022.PNG
3-09-2022.PNG
Attachment 2: 3-10-2022.PNG
3-10-2022.PNG
  16722   Thu Mar 10 10:05:49 2022 PacoUpdateSUSAS1 free swing test

[Paco, Ian]

  • Begin free swinging test for AS1 at 10:05 AM, set for ~ 2.04 hours.
    • Test failed because damping failed to disable.
  • Restart free swinging test for AS1 at 15:06, set for 2.04 hours.
    • Success (Attachment #1 shows the DOF input matrix diagonalization effect)

Of slight concern is the side to other degrees of freedom coupling, but this is definitely an improvement from last time.

Attachment 1: SUS_Input_Matrix_Diagonalization.pdf
SUS_Input_Matrix_Diagonalization.pdf
  16723   Fri Mar 11 16:43:03 2022 Ian MacMillanUpdateSUSETMY SUS Electronics Replacement

I updated the gain of the ct2um filter on the OSEMS for ETMY and decreased their gain by a factor of 9 from 0.36 to 0.04.

I added a filter called "gain_offset" to all the coils except for side and added a gain of 0.48.

together these should negate the added gain from the electronics replacement of the ETMY

  16725   Tue Mar 15 10:45:31 2022 PacoUpdateGeneralAssembled small in-vac optics

[Paco]

This morning I assembled LO3, LO4 and AS3 (all mirrors) onto polaris K1 mounts. The mounts stand as per this elog, on 4.5" posts with 0.5" Al spacers to match the beam heigth of 5.5". I also assembled ASL by adding a 0.14" Al spacer, and finally, recycled two DLC mounts (from the XEND flowbench) and posts to mount the 2 inch diameter beamsplitters BHDBS and AS2 (T=10%). I stored the previous 2" optics in the CVI and lambda optic cases and labeled appropriately.

  16731   Thu Mar 17 11:40:41 2022 PacoUpdateSUSETMY green PZT HV supply

[Anchal, Paco]

We installed a HV kepco power supply for the green PZT steering the YAUX beam. We did this in anticipation of the YARM alignment to take place this afternoon. We borrowed an unused DC power supply labeled "OMC Power spply" and made an appropriate SMA connection (Attachment #1), Then we set the Vset to 100.0 Volts and the current limit to 10 mA. Once we enabled the output we saw the 5.6 mA of current drawn by the eurocard in accordance with the wiki log (Attachment #2). 

It may not be possible to use the PZT as per this so this work may not have a direct impact on our upcoming alignment task.


We probably bumped the ethernet cable (martian network) on c1iscey, so the FE models stopped showing up on the medm screens. When we connected it back, it seemed like the FE kept running the model and only IPC showed error. We restarted the rtcds models on c1iscey and burtrestored to today morning 5:19 am.

burtwb -f /cvs/cds/rtcds/caltech/c1/burt/autoburt/today/05:19/c1scyepics.snap -l /tmp/controls_1220317_115006_0.write.log -o /tmp/controls_1220317_115006_0.nowrite.snap -v

ETMY is properly damping now and the oplev is roughly centered as well but the OPLEV Servos are off. We did not turn them on.
We should be able to carry out our cavity arm alignment today afternoon on both arms now.

  16732   Thu Mar 17 16:50:53 2022 PacoUpdateBHDXARM AUX alignment

[Ian, Paco]

We opened the ITMX chamber and

  • Inspected PR2 and LO1 and didn't see anything suspicious.
  • Took the EQ stops off ITMX in preparation for alignment

Alignment:

  • Ian started at the ETMX station, slightly tweaking the M1 M2 XAUX mirrors by hand and Paco on the ITMX chamber looking at the beam. The beam was visibly making it to the ITMX optic and reflecting back though at a negative pitch angle. No small motion on the M1-M2 knobs caused visible correction on this.
  • We decided to try adding an alignment offset to ITMX, and quickly saturated to 25000 (on the SUS screen) but fell short of fully correcting this PIT offset.
  • We scanned further the M1 M2 input alignment, and briefly lost the first reflection.
    • We recovered the first reflection, but the beam spot is now incident near the LL OSEM position.
  • We kept scanning M1 - M2 with Ian on the ITMX chamber this time, providing feedback through facetime.
  • Leaning on the ITMX chamber table, we noticed the magnitude of PIT correction left to be done and verified that M1-M2 two axis alignment + ITMX offsets should be enough for it.

We stopped our effort here, the XAUX beam spot is near the lower half of the ITMX face. Tomorrow, we will resume, but we will use airpods and a clean go-pro for real-time audiovisual feedback. Furthermore, ITMX OSEMs should be rebalanced as they haven't been touched after the table was balanced for PR2 and LO1.

  16735   Fri Mar 18 17:15:19 2022 PacoUpdateBHDXARM AUX alignment cont.

[Paco, Ian]

First, we re-balanced the ITMX OSEMs so that they would damp at around half-a-shadow.


Then, we set up a clean camera inside ITMX chamber looking at the ITMX optic. Then, using the live feed we aligned the AUX beam from the ETMX station using M1 and M2. The camera was great to help us align the beam properly close to the ITMX center. It wasn't very long until we could see a green beam on the IR card, but we didn't really see any flashing, so this may just be the bare transmission away from XARM resonance (Attachment #1).

Ian checked the reflection from ITMX using the IR card with holes, and he pretty much only saw one beam spot, so we turned to look for a beam scattering on the vacuum tube but didn't really see anything. This could mean that we were hitting the ETMX again, or missing slightly, or missing completely. We tried scanning the ITMX pitch and yaw using the bias (alignment) sliders, and with the illuminators off, try seeing some scattered green beam on the ETMX. We can't really see anything yet, but we will keep trying. If there are any tips on our method, it would be great to know them.

Attachment 1: Screen_Shot_2022-03-18_at_4.09.38_PM.png
Screen_Shot_2022-03-18_at_4.09.38_PM.png
  16738   Mon Mar 21 14:22:52 2022 AnchalUpdateSUSETMY Alignmnet offsets needed to be changed

I'm not sure why but the PIT and YAW offset values of +2725 and -2341 were not sufficient for the reflected OPLEV beam to reach the OPLEV QPD. I had to change the C1:SUS-ETMY_PIT_OFFSET to 5641 and C1:SUS-ETMY_YAW_OFFSET to -4820 to come back to center of the OPLEV QPD. We aligned the Oplevs to center before venting, so hopefully this is our desired ETMY position.

On another note, the issue of ETMY unable to damp was simple. The alignment offsets were on to begin with with values above 1000. This meant that whenever we enabled coil output, ETMY would necessarily get a kick. All I had to do was keep alignment offsets off before starting the damping and slowly increase the alignment offsets to desired position.

Quote:
 

- This modification allowed me to align the oplev spot to the center of the QPD. C1:SUS-ETMY_PIT_OFFSET and C1:SUS-ETMY_YAW_OFFSE are +2725 (8%FS) and -2341 (7%FS), respectively.

  16739   Mon Mar 21 18:00:05 2022 Ian MacMillanUpdateBHDXARM AUX alignment cont.

[Ian, Paco]

Continuing with the previous alignment that we stoped on friday, we re set up my heavily cleaned iPhone on FaceTime. The Phone alowed us to see the laser on the ITMX and center it on that optic.

  • We increased the trigger level for the watchdog on the optics.
  • Green beam was centered on th ITMX.
  • aligned the green laser: prompt reflection off of the ETMX to maximize the signal on the reflection PD
  • Went back to ITMX chamber, looked for the beam in the tube to see if the laser was hitting the beam tube off of the ITMX. From there we comunicated how to adjust the beam to move the beam towards the ETMX.
  • On the ETMX the reflection PD signal was measured and the ITMX was adjusted using CDS until ripples/"flashes" were seen in the reflection PD channel (C1:ALS-X_REFL_DC_OUT_DQ).
  • Once we saw flashing we tried to minimize the reflection pd signal using only ITMX alignment slider so that all the light was being held in the cavity.
  • Once we had this going the PDH lock engaged the higher order mode that we were seeing.
  • We removed the phone setup and closed up the ITMX chamber.
  • From here we moved to the control room and continude to adjust the ITMX and ETMX to see if we could lock to a lower order mode.
    • This proved unsuccessful so we will resume by trying to replicate the ASS action manually (with M1 - M2 PZT sliders and the REFL PD)
Attachment 1: PXL_20220322_015247138.jpg
PXL_20220322_015247138.jpg
  16743   Fri Mar 25 11:39:14 2022 AnchalUpdateSUSETMY SUS Electronics Replacement - Questions

After Ian updated the cts2um filters for OSEM, shouldn't the damping gains be increased back by factor of 10 to previos values? Was the damping gain for SIDE ever changed? we found it at 250.

Can you explain why gain_offset filter was required and why this wasn't done for the side coil?

Quote:

I updated the gain of the ct2um filter on the OSEMS for ETMY and decreased their gain by a factor of 9 from 0.36 to 0.04.

I added a filter called "gain_offset" to all the coils except for side and added a gain of 0.48.

together these should negate the added gain from the electronics replacement of the ETMY

 

  16746   Mon Mar 28 16:25:34 2022 Ian MacMillanUpdateSUSETMY SUS Electronics Replacement - Questions

The point of changing the gains was to return the system to its origional state. ie I wanted the over all gain of the physical components to be the same as when we started. From the CDS side of things nothing else should be changed. The damping filters should remain at their origional values. The cts2um filter was changed to counteract a change in the electronics (replacing them). These changes should cancel eachother out. As for the side control, on 3/4/22 koji reduced the output resistors for the 4 face OSEMs but did not change the the SD one. there fore the SD did not need the same adjustment as the others.

Quote:

After Ian updated the cts2um filters for OSEM, shouldn't the damping gains be increased back by factor of 10 to previos values? Was the damping gain for SIDE ever changed? we found it at 250.

Can you explain why gain_offset filter was required and why this wasn't done for the side coil?

Quote:

I updated the gain of the ct2um filter on the OSEMS for ETMY and decreased their gain by a factor of 9 from 0.36 to 0.04.

I added a filter called "gain_offset" to all the coils except for side and added a gain of 0.48.

together these should negate the added gain from the electronics replacement of the ETMY

 

 

  16748   Tue Mar 29 17:35:54 2022 PacoUpdateSUSDamping fix on BS, AS4, PR2, and PR3

[Ian, Paco]

  • We removed the "cheby" filters from AS4, PR2 and PR3 which had been misplaced after copying from the old SUS models. After removing them, the new SOS damped fine. Note that because of the Input matrices, the filters have to be enabled all at once for the MIMO loop to make sense.
  • We also disabled the "Cheby" filter on BS and saw it damp better. We don't understand this yet, but perhaps it's just a consequence of the many changes in the BSC that have rendered this filter obsolete.
  • we also reduced the damping gains on PR2, PR3 and AS4 to prevent overflow values. After the adjustments the optics were damping fine.
  16751   Fri Apr 1 14:26:50 2022 TegaUpdateOptical LeversSimplified sketch on MC table

Here is an early sketch of the MC table. 

 

Quote:

I have made an editable draw.io diagram of the planned simplified BHD setup on the ITMY table (see attached).  10 pts = 1 inch.

This is very sketchy but easily adjustable since we are removing everything but the ITMY Oplev from that table.

 

Attachment 1: MC_Table.drawio.pdf
MC_Table.drawio.pdf
  16752   Fri Apr 1 17:02:02 2022 KojiUpdateOptical LeversSimplified sketch on MC table

We are supposed to have BS Oplev Beams. We don't like the shallow angle reflections (i.e. AOI>45deg).

The laser is too big but I suspect the other components are too small. So it'd be check the actual size of the components including the optical mounts that are missing on the figure so far.

  16753   Fri Apr 1 22:22:29 2022 KojiUpdateOptical LeversSimplified sketch on MC table

Possibility to swap BS and ITMX tables:
BS table, which Tega said MC table, is 2ft x 4ft. The ITMX table is 3ft x 5ft and only the central 2ft x 4ft area is used. The area around the BS table is the narrowest for the east arm. We need at least (2+delta) ft of the hallway width so that we can move the instrument. I'm not yet sure if the ITMX table can be placed there without precise investigation.
 

  16755   Mon Apr 4 15:49:06 2022 TegaUpdateOptical LeversSimplified sketch on BS table

I have updated the BS table using feedback from Koji and Paco and the attached pdf document is the latest iteration.

Attachment 1: BS_Table.drawio.pdf
BS_Table.drawio.pdf
  16761   Thu Apr 7 11:47:22 2022 YehonathanUpdateBHDInitial BHD modeling: AS - LO mode matching

I begin modeling the initial BHD setup using Finesse. I started with copying C1_w_BHD.kat from the 40m/bhd repo and making changes to reflect the current BHD setup:

1. OMCs were removed.

2. Only 1 PD per BHD port was left.

3. Transmission of PR2 was changed to 2.2%. The PRG was calculated to be ~15.5.

4. Actual RoCs of new optics were dialed in (Yesterday me and Paco went into the cleanroom to measure the RoCs and they seem to match the datasheets).

Here's a table comparing the old (design?) RoCs with the new RoCs:

  New RoC Old RoC
LO1 5m 6m
LO2 inf inf
LO3 500mm 750mm
LO4 150mm -450mm
AS1 2m 2.8m
AS2 inf inf
AS3 200mm -2m
AS4 750mm 600mm
PR2 2000m -700m
PR3 1000m 1000m
SR3 1000m -700m

 

The changes looked quite alarming, especially for LO4 and AS3, so I wrote a script to calculate the mode matching between the LO and AS beams called AS_LO_ModeMatching.ipynb and pushed it into the repo. In the notebook a bright AS beam is created by creating a small asymmetry between the arms of ~ 0.003 degrees (~10pm). Amplitude detectors were put at the input ports of the BHD BS to calculate the fields in the AS and LO beams. In particular TEM00, TEM02 and TEM20 were measured for each beam.

The calculation shows that with the old RoCs the mode matching between the LO and AS beams is 99% while for the new RoCs it is ~ 50%.

  16763   Thu Apr 7 20:33:42 2022 TommyUpdateElectronicsRFSoC 2x2 board -- setup for remote work

To access the board remotely through the 40m lab ethernet port, use

ssh -N -L localhost:1137:localhost:9090 xilinx@<ip_address>

Then in the browser go to

localhost:1137/lab

Other SSH commands using different ports or without the -N -L seemed to fail to open Jupyter. This way has been successful thereafter.

Quote:

[Tommy, Paco]

Since last week I've worked with tommy on getting the RFSoC 2x2 board to get some TFs from simple minicircuits type filters. The first thing I did was set up the board (which is in the office area) for remote access. I hooked up the TCP/IP port to a wall ethernet socket (LIGO-04) and the caltech network assiggned some IP address to our box. I guess eventually we can put this behind the lab network for internal use only.

After fiddling around with the tone-generators and spectrum analyzer tools in loopback configuration (DAC --> ADC direct connection), we noticed that lower frequency (~ 1 MHz) signals were hardly making it out/back into the board... so we looked at some of the schematics found here and saw that both RF data converters (ADC & DAC) interfaces are AC coupled through a BALUN network in the 10 - 8000 MHz band (see Attachment #1). This is in principle not great news if we want to get this board ready for audio-band DSP.

We decided that while Tommy works on measuring TFs for SHP-200 all the way up to ~ 2 GHz (which is possible with the board as is) I will design and put together an analog modulation/demodulation frontend so we can upconvert all our "slow" signals < 1MHz for fast, wideband DSP. and demodulate them back into the audio band. The BALUN network is pictured in Attachment #2 on the board, I'm afraid it's not very simple to bypass without damaging the PCB or causing some other unwanted effect on the high-speed DSP.

 

  16764   Thu Apr 7 20:37:06 2022 TommyUpdateElectronicsRFSoC 2x2 Board -- Simple Tone Generator

In the "Tommy" sub folder, I created a new notebook called "SimpleToneGenerator". This tunes the DAC and ADC mixers to a single frequency and reads off the Time Series and Fourier components. We can alos easily check the demodulation scheme and implement butterworth filters to check their function.

  16765   Thu Apr 7 20:41:15 2022 TommyUpdateElectronicsRFSoC 2x2 Board -- Gain Plotter

In this file (under Tommy), we have a notebook which runs through a spectrum of frequencies and determines the gain response of the attached filter. Below we have the output of a high pass filter. We use IQ demodulation to change IQ componets to DC. Then using a butterworth filter, we read out the DC components and determine the gain's magnitude and phase. However, the phase seems very noisy. This is because the oscillators in the different tiles are independent and a random phase is introduced by changing the mixer frequency in individual tiles. To resolve this we need Multi Tile Synchronization or "MTS". 

Original Pynq Support Forum Query: https://discuss.pynq.io/t/rfsoc-2x2-phase-measurement/3892

We also have the code to fit a resposne function using IIRregular, but this is not as useful without proper phase data.

Attachment 1: Screen_Shot_2022-04-07_at_8.40.23_PM.png
Screen_Shot_2022-04-07_at_8.40.23_PM.png
Attachment 2: Unknown-3.png
Unknown-3.png
Attachment 3: Unknown-4.png
Unknown-4.png
  16766   Thu Apr 7 21:15:04 2022 YehonathanUpdateBHDInitial BHD modeling: AS - LO mode matching

Ok, it turns out these optics were purchased on purpose, as this elog shows. Jon considered building a mode-matching telescope with stock optics as an initial step before purchasing the custom optics (referred to as "design" optics in my elog).

I dialed in the new distances between the optics into the .kat file as described in this elog and pushed the changes to the repo. With the new distances, I got mode-matching of 87% for the full IFO and 89% for FPMI so there's probably no need to worry as the mode-matching with these optics was already designed.

Quote:

I begin modeling the initial BHD setup using Finesse. I started with copying C1_w_BHD.kat from the 40m/bhd repo and making changes to reflect the current BHD setup:

1. OMCs were removed.

2. Only 1 PD per BHD port was left.

3. Transmission of PR2 was changed to 2.2%. The PRG was calculated to be ~15.5.

4. Actual RoCs of new optics were dialed in (Yesterday me and Paco went into the cleanroom to measure the RoCs and they seem to match the datasheets).

Here's a table comparing the old (design?) RoCs with the new RoCs:

  New RoC Old RoC
LO1 5m 6m
LO2 inf inf
LO3 500mm 750mm
LO4 150mm -450mm
AS1 2m 2.8m
AS2 inf inf
AS3 200mm -2m
AS4 750mm 600mm
PR2 2000m -700m
PR3 1000m 1000m
SR3 1000m -700m

 

The changes looked quite alarming, especially for LO4 and AS3, so I wrote a script to calculate the mode matching between the LO and AS beams called AS_LO_ModeMatching.ipynb and pushed it into the repo. In the notebook a bright AS beam is created by creating a small asymmetry between the arms of ~ 0.003 degrees (~10pm). Amplitude detectors were put at the input ports of the BHD BS to calculate the fields in the AS and LO beams. In particular TEM00, TEM02 and TEM20 were measured for each beam.

The calculation shows that with the old RoCs the mode matching between the LO and AS beams is 99% while for the new RoCs it is ~ 50%.

 

  16767   Fri Apr 8 16:03:58 2022 ranaUpdateElectronicsRFSoC 2x2 board -- setup for remote work & BALUN saga

Seems like it should be possible to just remove the transformer (aka as a BALUN ... BALanced, UNbalanced), or replace it with a lower frequency part. Its just a usual mini-circuits part. Maybe you can ask Chris Stoughton about this and ask Tommy to checkout some of the RFSoC user forums for how to go to DC.

Quote:
 

After fiddling around with the tone-generators and spectrum analyzer tools in loopback configuration (DAC --> ADC direct connection), we noticed that lower frequency (~ 1 MHz) signals were hardly making it out/back into the board... so we looked at some of the schematics found here and saw that both RF data converters (ADC & DAC) interfaces are AC coupled through a BALUN network in the 10 - 8000 MHz band (see Attachment #1). This is in principle not great news if we want to get this board ready for audio-band DSP.

We decided that while Tommy works on measuring TFs for SHP-200 all the way up to ~ 2 GHz (which is possible with the board as is) I will design and put together an analog modulation/demodulation frontend so we can upconvert all our "slow" signals < 1MHz for fast, wideband DSP. and demodulate them back into the audio band. The BALUN network is pictured in Attachment #2 on the board, I'm afraid it's not very simple to bypass without damaging the PCB or causing some other unwanted effect on the high-speed DSP.

 

  16769   Mon Apr 11 11:00:30 2022 JancarloUpdateVACC1VAC Reboot and Nitrogen tanks

[Paco, JC, Ian, Jordan, Chub]

Checking in the morning, I walked over to the Nitrogen tanks to check the levels. Noticed one tank was empty, so I swapped it out. Chub came over to check the levels and to take note of how many tanks were left available for usage (None). Chub continued to put in a work order for a set of full Nitrogen tanks. We should be set on Nitrogen until Thursday this week (4/14/22).

As for C1VAC, this morning, Paco and I attempted to open the PSL shutter, but the interlock system was tripped so we didn't get any light into the IFO. We traced the issue down to C1VAC being unresponsive. We discussed this may have interlocked as a result of the Nitrogen tanks running out, but we do not believe this was the issue since we would have recieved an email. We tried troubleshooting as much as possible avoiding a reboot, but were unable to solve the issue. In response, we ran the idea of a reboot across Jordan and Ian, where everyone was in agreement, and fixed the system. Restarting c1vac seems to have closed V4, but this didn't cause any issues with the current state of the vacuum system.

After opening the PSL shutter again, we see the laser down the IFO, so we resume alignment work

  16772   Tue Apr 12 09:05:21 2022 JordanUpdateVACNew Pressure Gauge Install/Pump Spool Vent

Today, Tega and I would like to vent the pump spool an dinstall the new FRG-400 Agilent Pressure Gauges (per elog 15703). The attached picture shows the volume needed to be vented highlighted in red, and the gauges that need to be replaced/removed (purple dot next to the name).

The vent plan is as follows:

Open RV2

Open VM3

Open V7

Open V4

Shut down TP2

Install new gauges

Will add to post with updates post vent.

Attachment 1: Screenshot_2022-04-12_08-42-33.png
Screenshot_2022-04-12_08-42-33.png
Attachment 2: 81CB0936-1B19-4722-8A32-C3DC1D1FBC21.heic
Attachment 3: 2262ECEF-6200-4E95-8E32-C83CB9EB4F17.heic
Attachment 4: B5712B34-ECF6-43BE-BCB2-38CD775CF653.heic
Attachment 5: BEE14A07-976A-45C2-82A0-1774D377941E.heic
Attachment 6: 84557D6E-6AAE-47CF-A3AD-1DF329FEB550.heic
  16773   Wed Apr 13 12:50:07 2022 TegaUpdateVACNew Pressure Gauge Install/Pump Spool Vent

[Jordan, JC, Tega]

We have installed all the FRGs and updated the VAC medm screens to display their sensor readings. The replacement map is CC# -> FRG#, where # in [1..4] and PRP1 -> FRG5. We now need to clean up the C1VAC python code so that it is not overloaded with non-function gauges (CC1,CC2,CC3,CC4,PRP1). Also, need to remove the connection cables for the old replaced gauges.

Attachment 1: VAC_FRG_UPGRADE.png
VAC_FRG_UPGRADE.png
  16774   Wed Apr 13 15:57:25 2022 Ian MacMillanUpdateCamerasCamera Battery Test

Tested the Nikon batteries for the camera. they are supposed to be 7V batteries but they don't hold a charge. I confirmed this with multi-meter after charging for days. Ordered new ones Nikon EN-EL9

  16775   Wed Apr 13 16:23:54 2022 Ian MacMillanUpdateGeneralSmell in 40m

[Ian, Paco, JC]

There is a strange smell in the 40m. It smells like a chemically burning smell maybe like a shorted component. I went around with the IR camera to see if anything was unusually hot but I didn't see anything. The smell seems to be concentrated at the vertex and down the y-arm

  16776   Wed Apr 13 18:55:54 2022 KojiUpdateCamerasCamera Battery Test

I believe that the Nikon has an exposure problem and that's why we bought the Canon.

 

  16777   Thu Apr 14 09:04:30 2022 JordanUpdateVACRGA Volume RGA Scans

Prior to venting the RGA volume on Tuesday (4/12/2022) I took an RGA scan of the volume to be vented (RGA+TP1 volume+Manual Gate Valve) to see if there was a difference after replacing the manual gate valve. Attached is the plot from 4/12/22, and an overlay plot to complare 4/12/22 to 12/10/2021, when the same volume was scanned with the old (defective) manual gate valve.

There is a significant drop in the ratio O2 compared the the nitrogen peak and reduced Argon (AMU 40) which indicates there is no longer a large air leak.

12/10/21 N2/O2 ratio ~ 4 (Air 78%N2 / 21%O2)

4/12/22 N2/O2 ratio ~ 10      

There is one significant (above noise level) peak above AMU 46, which is at AMU 58. This could possibly be acetone (AMU 43 and 58) but overall the new RGA Volume scans look significantly better after the manual gate valve replacement. Well done!

Attachment 1: 40mRGA_Overlay.pdf
40mRGA_Overlay.pdf
Attachment 2: RGAVolume_4_12_22.PNG
RGAVolume_4_12_22.PNG
  16782   Fri Apr 15 11:59:16 2022 YehonathanUpdateIOOIMC completely misaligned

Came this morning, opened the PSL and there was not even a beam on the MC REFL.

Looking at the big monitor it seems like the WFS signals went through the roof during the "auto-alignment" night session.

I restored the MC alignment from before the misalignment happen and wait for the SUS to damp. Once the RMS values went below 200 I enabled the watchdog and the coil outputs.

I opened the PSL shutter and the IMC locked immediately. I turned on the WFS servo and the MC REFL DC went down to 0.3. I run the WFS relief script.

  16784   Mon Apr 18 15:17:31 2022 JancarloUpdateGeneralTool box and Work Station Organization

I cleaned up around the 40 m lab. All the Laser Safety Glasses have been picked up and placed on the rack at the entrance.

Some miscellaneous BNC Connector cables have been arranged and organized along the wall parallel to the Y-Tunnel.

Nitrogen tanks have been swapped out. Current tank is at 1200 psi and the other is at 1850 psi.

The tool box has been organized with each tool in its specified area.

  16785   Mon Apr 18 16:09:07 2022 YehonathanUpdateBHDBHD Readout simulation

I'm planning on simulating the BHD readout noise in a manner very similar to the ALS noise model using Simulink. I've made a sketch of the model for the longitudinal DOFs (attached). A model for ASC will be similar but with more measurement devices (OpLevs, QPDs, WFSs).

I'm not pretending to simulate everything in this diagram on the first go, it is just a sketch of the big picture.

Attachment 1: BHD_Simulink_Sketch.drawio.pdf
BHD_Simulink_Sketch.drawio.pdf
  16787   Mon Apr 18 23:22:39 2022 KojiUpdateGeneralTool box and Work Station Organization

Whoa! Thanks!

Attachment 1: PXL_20220419_062101907.jpg
PXL_20220419_062101907.jpg
  16788   Tue Apr 19 18:10:10 2022 PacoUpdateBHDPart V of BHR upgrade - POX11 path, LO path, and ITMX Oplev

[Yuta, Paco]

We set up POX11 beam path from ITMX chamber to the ITMX in-air table. To do this, we first identified the POX reflection on the ITMX chamber, and then steered the POXM1 (in the BSC) by hand until we cleared the viewport. We also checked that the POX beam is centered on POXM1.

We then decided to slide the LO1 YAW to clear the LO beam path, which was otherwise clipping on the PR2 SOS. The slider (DAC limited) range of -25000 counts was barely enough to clear the SOS comfortably and avoid hitting the POXM1. The LO beam is now hitting LO2 mirror, so LO alignment can proceed from BSC and ITMY chamber.

Finally, we aligned the input ITMX Oplev beam to ITMXOL2, then ITMX, then to ITMXOL2, and finally into the ITMX in-air optical table. We took some photos of the Oplev beam (see Attachments) to note their position.

By the end of in-vacuum work there was still some flashing in the arm cavities, but fine alignment is required.


After closing the ITMX Chamber, and BSC, we moved on to center the ITMXOL beam. We accomplished this by using two mirrors instead of one as was previously the case. This relaxed the angle of incidence a little, but we had to change the path and the position of the QPD. The QPD sum reads ~ 6600 counts versus the ~ >8000 counts it read right before the vent. One attempt at closing the OL loop, and the ITMX starting oscillating in YAW (PIT was ok), so we realized that maybe we flipped the order in which the OL1 / OL2 mirror were arranged and so the YAW loop needed to flip its sign. Indeed after changing the C1:SUS-ITMX_OL_YAW_GAIN from -6.0 to 6.0 the OL_YAW loop is stable.

Attachment 1: DJI_0167.JPG
DJI_0167.JPG
Attachment 2: DJI_0169.JPG
DJI_0169.JPG
Attachment 3: DJI_0168.JPG
DJI_0168.JPG
  16789   Wed Apr 20 08:20:22 2022 PacoUpdateBHDPart V of BHR upgrade - PR2 weirdness

Yesterday, I tried tuning the PR2 damping gains by increasing the gain until the damping gave the ~5 oscillations (by watching the damped motion using StripTool, and keeping an eye on the PD var). I noticed that often when I changed the gain, some OSEM sensors shifted (gained an offset!!) and the PD var values changed, typically increasing at higher damping gains. I reverted the changes until the PD var looked "normal" again (~ 2 mV) but it is hard to imagine that the damping filters can have such a "DC" effect, given the shape comprises single zero at 0 Hz (and pole at 30 Hz).

  16790   Wed Apr 20 14:56:06 2022 TommyUpdateElectronicsRFSoC 2x2 board -- setup for remote work & BALUN saga

Here are a few options for replacement BALUNs from Mini Circuits and specs:

Current. TCM1-83X+, 10-8000 MHz, 50 Ohms, Impedance Ratio 1, Configuration K

1. Z7550-..., DC-2500 MHz (some DC-2300), 50/75 Ohms, Impedance Ratio 1.5, Configuration Q. There are various types of the Z7550 which have different connectors (SMA and BNCs). These have much larger dimensions than the TCM1-83X. Can handle up to 5A DC current with matching loss 0.6 dB.

2. SFMP-5075+, DC-2500 MHz, 50/75 Ohms, Impedance Ratio 1.5, Configuration D. This is an SMA connected BALUN. It can handle 350mA, has a matching loss 0.4 dB, and has 1W power handling.

Quote:

Seems like it should be possible to just remove the transformer (aka as a BALUN ... BALanced, UNbalanced), or replace it with a lower frequency part. Its just a usual mini-circuits part. Maybe you can ask Chris Stoughton about this and ask Tommy to checkout some of the RFSoC user forums for how to go to DC.

Quote:
 

After fiddling around with the tone-generators and spectrum analyzer tools in loopback configuration (DAC --> ADC direct connection), we noticed that lower frequency (~ 1 MHz) signals were hardly making it out/back into the board... so we looked at some of the schematics found here and saw that both RF data converters (ADC & DAC) interfaces are AC coupled through a BALUN network in the 10 - 8000 MHz band (see Attachment #1). This is in principle not great news if we want to get this board ready for audio-band DSP.

We decided that while Tommy works on measuring TFs for SHP-200 all the way up to ~ 2 GHz (which is possible with the board as is) I will design and put together an analog modulation/demodulation frontend so we can upconvert all our "slow" signals < 1MHz for fast, wideband DSP. and demodulate them back into the audio band. The BALUN network is pictured in Attachment #2 on the board, I'm afraid it's not very simple to bypass without damaging the PCB or causing some other unwanted effect on the high-speed DSP.

 

model_no case_style single2single single2bal bal2bal center_tap dc_iso freq_low freq_high impedance imped_ratio interface tech config
SFMP-5075+ FF1891 Y N N N N DC 2500 50/75 1.5 CON CORE & WIRE D
TCM1-83X+ DB1627 N Y Y N N 10 8000 50 1 SMT CORE & WIRE K
Z7550-BFNF+ H795-14 Y N N N N DC 2500 50/75 1.5 CON CORE & WIRE Q
Z7550-BMBF+ QP1876-1 Y N N N N DC 2300 50/75 1.5 CON CORE & WIRE D1
Z7550-BMNF+ QP1876 Y N N N N DC 2500 50/75 1.5 CON CORE & WIRE Q
Z7550-FFNM+ H795-1 Y N N N N DC 2300 50/75 1.5 CON CORE & WIRE Q
Z7550-FFSF+ H557-1 Y N N N N DC 2500 50/75 1.5 CON CORE & WIRE Q
Z7550-FMSF+ H795-3 Y N N N N DC 2300 50/75 1.5 CON CORE & WIRE Q
Z7550-FMSFDC+ H795-3 Y N N N Y 1 2500 50/75 1.5 CON CORE & WIRE Q
Z7550-NFNF+ H795-10 Y N N N N DC 2500 50/75 1.5 CON CORE & WIRE D1
Z7550-NMNF+ H795-4 Y N N N N DC 2300 50/75 1.5 CON CORE & WIRE Q
  16791   Wed Apr 20 16:11:08 2022 KojiUpdateSUSOutpur resistors updated for LO1 coil drivers / for SR2, LO2, AS1, and AS4 in progress

[JC Koji]

To give more alignment ranges for the SUS alignment, we started updating the output resistors of the BHD SUS coil drivers.
As Paco has already started working on LO1 alignment, we urgently updated the output Rs for LO1 coil drivers.
LO1 Coil Driver 1 now has R=100 // 1.2k ~ 92Ohm for CH1/2/3, and LO1 Coil Driver 2 has the same mod only for CH3. JC has taken the photos and will upload/update an elog/DCC.

We are still working on the update for the SR2, LO2, AS1, and AS4 coil drivers. They are spread over the workbench right now. Please leave them as they're for a while.
JC is going to continue to work on them tomorrow, and then we'll bring them back to the rack.

Attachment 1: IMG_0527.jpeg
IMG_0527.jpeg
Attachment 2: IMG_0528.jpeg
IMG_0528.jpeg
Attachment 3: IMG_0529.jpeg
IMG_0529.jpeg
Attachment 4: IMG_0530.jpeg
IMG_0530.jpeg
Attachment 5: IMG_0531.jpeg
IMG_0531.jpeg
Attachment 6: IMG_0532.jpeg
IMG_0532.jpeg
  16792   Wed Apr 20 18:50:03 2022 KojiUpdateBHDPart V of BHR upgrade - PR2 weirdness

It seemed that it comes from the servo oscillation. This does not happen when the output limitters were set to be 100-ish. But even so the gains looked quite low.

I turned on the Cheby rool-offs for all the DOFs, and this allowed me to increase the damping gain A LOT.
The gains were 2~5 but now they are now 20-25 for the face OSEMs and 150 for SD.

The attached is the example of the damping when all the damping loops are on.

I think we need to tune the servo loops carefully for all the SUSs by actually looking at the openloop transfer functions rather than a personal feeling. => To Do

Attachment 1: Screenshot_2022-04-20_18-46-11.png
Screenshot_2022-04-20_18-46-11.png
  16793   Thu Apr 21 10:35:23 2022 KojiUpdateCDSDAQ seemed down

Yesterday, when I worked on the damping servo, I found that any of the daqvtools (ndscope, dtt, dataviewer,...) is not available.  We may need to restart the fb and rt machines.

  16794   Thu Apr 21 11:31:35 2022 JCUpdateVACGauges P3/P4

[Jordan, JC]

It was brought to attention during yesterday's meeting that the pressures in the vacuum system were not equivalent althought the valve were open. So this morning, Jordan and I reviewed the pressure gauges P3 and P4. We attempted to recalibrate, but the gauges were unresponsive. Following this, we proceeded to connect new gauges on the outside to test for a calibration. The two gauges successfully calibrated at atmosperic pressure. We then proceeded to remove the old gauges and install the new ones. 