  5139   Mon Aug 8 13:24:00 2011 steveMetaphysicsTreasure Monday morning

Quote:

Just a reminder that a film crew will be here Monday morning, filming Christian Ott for some Discovery channel show.

They are slated to be here from 8am to 12:30pm or so.  They will take a couple of shots inside the lab, and the rest of the filming should be of Christian in the control room (which they will "clean up" and fit with "sexy lighting").  I will try to be here the whole time to oversee everything.

Konecrane Fred was early this morning. He diagnosed the ETMY crane horizontal drive gear box dead and left just before the film crew showed up.

New gear box should be here by the end of this week for installation.

The lab air quality is high ~20,000 counts of particles of 0.5 micron.  Keep an eye on this before you open the chamber.

  5140   Mon Aug 8 14:21:03 2011 steveUpdatePEMParticle counts controlled

Quote:

[Jenne, Kiwamu]

While Kiwamu was finalizing the X green alignment, I started to prepare to remove the ETMY door, and begin checking out its OSEMs, etc, so we could start moving it to it's new place, and figure out why it's been wonky for a while.  I ran the particle counter, and we have a factor of ~5 more particles than normal.  Kiwamu and I agreed not to open ETMY.  Since we had briefly opened the IOO and Output Optics chambers to check the X green's position on the PSL table, we immediately shut those doors.  They were probably open for ~15 minutes or so.  (Yes Steve, we should have checked before opening any doors, but at least we remembered to check at all, and the doors were only open for a few minutes rather than for a few hours.)

I attach a 24hrs trend of the particle counts, for reference.  It looks like it's been a little high for a while, but today it's really dirty in the air.

 The east end particle count is 155K for 0.3 micron and 15K for 0.5 micron  counts/cf min.  In order to minimize diffusion of dirt into the IFO we set up the mobile HEPA with CP Stat 100 tent.

This set up gives us practically ZERO inside the tent

  5142   Mon Aug 8 15:52:39 2011 steveUpdateVACback ground rga scan

The RGA region is beeing monitored during the vent. This will tell us how clean the RGA itself is.

 

  5158   Tue Aug 9 16:40:12 2011 steveUpdateGeneralclean room coat counts

I measured the particles coming off of new- unused clean room coat. Tyvek, Convertors, Allegiance #9393 measured  10 counts of 0.3 micron at 1 minute and 0 count at 7 minute.

The 0.5 micron size  measured 0 at both times. Jenne's used coat measured 20 counts of 0.3 micron  and 0 counts for 0.5 micron at 1 minute. ( counts / cf- min)

The HEPA tent background is consistently 0 when it's CP STAT 100 curtains are closed.

  5159   Tue Aug 9 16:54:47 2011 steveUpdateVACscratch on vac door

Jenne found a big scratch on the north vac door of ITMY. Fortunately it does not reach the inner annulos 0 -ring seal.

This is precisely what we have to avoid to preserve our vacuum system!

 

  5166   Wed Aug 10 07:59:33 2011 steveUpdateSUSthis is too dam nice

Quote:

Suresh and I tweaked the OSEM angles in ETMX yesterday.  Last night the ETMs were left free swinging, and today I ran Rana's peakFit scripts on ETMX to check the input diagnolization:

ETMX.png

It's well inverted, but the matrix elements are not great:

       pit       yaw       pos       side      butt
UL    0.3466    0.4685    1.6092    0.3107    1.0428
UR    0.2630   -1.5315    1.7894   -0.0706   -1.1859
LR   -1.7370   -1.5681    0.3908   -0.0964    0.9392
LL   -1.6534    0.4319    0.2106    0.2849   -0.8320
SD    1.0834   -2.6676   -0.9920    1.0000   -0.1101

The magnets are all pretty well centered in the OSEMS, and we worked at rotating the OSEMS such that the bounce mode was minimized.

Rana and Koji are working on ETMY now.  Maybe they'll come up with a better procedure.

 

  5184   Thu Aug 11 08:29:28 2011 steveUpdateComputersdataviewer at Rosalba

I'm having this problem with DTV every morning at Rosalba only. It wants to start with a negative GPS time and it can not connect to the frame builder.

Normally after a few time of starting it, it will work.

  5193   Thu Aug 11 15:31:43 2011 steveUpdateGeneralmalfunctioning crane at ETMY

Quote:

The horizontal trolley drive stopped working  at the east end this morning. It is working intermittently. In the worst case we can take the door off with the manual -Genie- lift.

I'm working with Konecrane to solve  the wormgear drive problem.

 Gear box found, it's  lead time one week at $825    The crane may be functional round August 25

  5194   Thu Aug 11 16:07:37 2011 steveUpdateSUSETMY rack cables strain releived
  5212   Fri Aug 12 16:52:49 2011 steveUpdateGeneralChamber illuminator switch

I'm looking for an ether net based  power switch for turning lights on and off for the vacuum system from MEDM screen.  This is what I found

Jamie please take a look at it.

 

 

  5262   Thu Aug 18 10:59:04 2011 steveUpdateTreasurePrepared for drag wiping

Quote:

While waiting for the IFO team to align things (there were already ~5 people working on a ~1 person job...), I got all of our supplies prepped for drag wiping in the morning. 

The syringes are still on the flow bench down the Xarm.  I put fresh alcohol from unopened spectrometer-grade bottles into our alcohol drag wiping bottles.

The ITMs already had rails for marking their position in place from the last time we drag wiped.  I placed marker-rails for both ETMs.

 We should use the deionizer before drag wiping with isopropanol.

  5264   Thu Aug 18 15:54:35 2011 steveUpdateSUSdamped and undamped OSEMs

damped sus at atm1 and freeswingging sus at atm2

 

  5268   Fri Aug 19 09:14:56 2011 steveUpdateIOOdegrading laser power at atm

Light into the MC is 20 mW at atm, MC_Transmitted ~10 MW = 400 count

The PMC_T is OK but something else is drifting.

  5269   Fri Aug 19 10:26:53 2011 steveUpdateSUSOSEM sensor spectra

Free swingging OSEM sensors LL at atm

  5270   Fri Aug 19 15:31:53 2011 steveUpdateGeneralpower interruption rescheduled to 10-1-2011

                UTILITY & SERVICE INTERRUPTION

**PLEASE POST**

 

Building:               Central Engineering Services (C.E.S.)

          LIGO Gravitational Physics building adjacent to C.E.S. 40M- Lab

          Safety Storage adjacent to CES

          Steele House 

          Keck Lab

 

Date:                   Saturday, October 1, 2011

Time:                   8:00 a.m. To 9:00 a.m.            

Interruption:   Electricity

Contact:                Mike Anchondo ext. 4999  Tom Brennan 4984

*This interruption is required for maintenance of high voltage switchgear in Campus Sub Station.

(If there is a problem with this Interruption, please notify

 the Service Center X-4717 or the above Contact as soon as possible.

 If no response is received we will proceed with the interruption.)

         

                                Reza Ohadi,

                                Director, Campus Operations & Maintenance

  5276   Mon Aug 22 11:40:08 2011 steveUpdateVACcranes checked

Cranes are  checked and they are ready for lifting. At the east end will use the manual Genei-lift to put door on.

  5300   Thu Aug 25 08:12:09 2011 steveUpdateSUSETMY & ITMY wiped, replaced, vac door on

Quote:

We've closed up ETMX:

  • the optic was drag wiped
  • the suspension tower was put back in place
  • earthquake stops were backed off the appropriate number of turns, and de-ionized
  • chamber door was put on

 jamie, jenne, kiwamu, suresh, steve

 

ETMY and ITMY were treated the same way as ETMX. The BS chamber was closed with heavy vac door yesterday also. The IOO access connector's inner jamnuts are torqued to 45 ft/lbs as all vac door bolts.

The vac envelope is ready for pumpdown condition, except ITMX chamber with light atm door cover.

Jenne will summeries the condition of dust on the  TMs before and after the drag wipes.

  5303   Thu Aug 25 17:14:49 2011 steveUpdateVACclean room fashion changes

Jamie is modeling our next generation  in-vac & clean room bonny suit that Jenne and myself already tested.

It is quite bearable with our traditional cleanroom beret-bouffant cap. Please use these in the future.

This will help to avoid the farther degradation of somewhat dusty 40m vac envelope.

It is the required dress code to enter the clean assembly room in the 40m.

 We have small, med, large and x-large in stock. I'm getting larger sizes.

It will not allow certain people to climb inside the vacuum chamber in dirty pants.

  5306   Fri Aug 26 07:53:59 2011 steveUpdateSUSBroken UL magnet on ITMX

Quote:

Dmass just reminded me that the usual procedure is to bake the optics after the last gluing, before putting them into the chambers.  Does anyone have opinions on this? 

On the one hand, it's probably safer to do a vacuum bake, just to be sure.  On the other hand, even if we could use one of the ovens immediately, it's a 48 hour bake, plus cool down time.  But they're working on aLIGO cables, and might not have an oven for us for a while.  Thoughts?

 Follow full procedure for full strength, minimum risk

  5307   Fri Aug 26 10:45:17 2011 steveUpdateGeneral crane at ETMY is fixed

Quote:

The horizontal trolley drive stopped working  at the east end this morning. It is working intermittently. In the worst case we can take the door off with the manual -Genie- lift.

I'm working with Konecrane to solve  the wormgear drive problem.

 New gear box installed and tested by Fred KoneCranes.

  5309   Fri Aug 26 15:59:33 2011 steveUpdateGeneraldrawer cabinet moves in

manufacturer info

Jamie and Shuresh moved in Jenne's 11 drawers cabinet and relocated old note book boxes on the inside of the vac tube.

  5322   Tue Aug 30 10:49:29 2011 steveUpdateSUSBS & PRM damping restored

I have restored the damping of BS and PRM. Today is janitor day. He is shaking things around the lab.

  5328   Wed Aug 31 11:37:56 2011 steveUpdateGreen Lockingshutter in place at east end

Uniblitz mechanical shutter installed in the green beam path at ETMY-ISCT  The remote control cable has not been connected.

  5331   Thu Sep 1 11:03:22 2011 steveUpdateVACback ground rga scan

The RGA back ground at day 29 of this vent.

  5332   Thu Sep 1 15:07:45 2011 steveUpdateSUSwhy ITMY is moving more ?

Atm1, ITMY and the SRM are on the same isolation stack.  So why does  the SRM move twice as much?

Atm2, We should check the ITMY  SIDE_OSEM before pump down. Anatomically correct, beautiful picture taken by Kiwamu on August 22

  5333   Thu Sep 1 15:59:46 2011 steveUpdateSUSlight doors on at the ITMs

Suresh, Kiwamu and Steve

Heavy chamber doors replaced by light ones at  ITMX-west and ITMY-north locations.

  5341   Tue Sep 6 08:05:53 2011 steveUpdateSUSITMX must be touching

Quote:

The new ITMX was aligned by changing the DC biases.

The resultant DC biases are reasonably small.

C1:SUS-ITMX_PIT_COMM = -0.2909

C1:SUS-ITMX_YAW_COMM = -0.0617

 

The alignment was done by trying to resonate the green light in the X arm cavity.

The spot position of the green light on the ITMX mirror looked good. This was confirmed by inserting a sensor card.

I did the OSEM mid-range adjustment and the rotation adjustment but at the end the OSEM DC voltage has changed due to the DC bias operation.

The OSEM rotation was approximately optimized so that all the face shadow sensors are sensitive to the POS motion but the SIDE shadow sensor is insensitive to the POS motion.

It needs a free swinging diagnosis.

 ITMX OSEMs   UL 1.8V,   UR 1.7V,   LR 0V,   LL 0V,   SD 1.3V  at the same bias setting shown above. May be a lose earth quake tip?or magnet is touching?

  5355   Wed Sep 7 08:14:01 2011 steveUpdateSUSfinal OSEM check

All fine, except ITMX_sensor_UL's  60  counts deep hoop for an hour.

  5357   Wed Sep 7 12:03:49 2011 steveUpdateVACPump down has started

Jamie and Steve

We closed ITMX and ITMY chambers and started pumping around 11am

What we did before:

1, turned off AC power  to PZT Jena HV ps

2, checked jam nut positions

3, cheched  single o-ring shims

4, closed psl out shutter

  5358   Wed Sep 7 13:28:25 2011 steveSummaryCamerasAll Camera setups a need upgrading

Quote:

I just tried to adjust the ETMY camera and its not very user friendly = NEEDS FIXING.

* Camera view is upside down.

* Camera lens is contacting the lexan viewport cover; this means the focus cannot be adjusted without misaligning the camera.

* There's no strain relief of the camera cables at the can. Needs a rubber cable grommet too.

* There's a BNC "T" in the cable line.

Probably similar issues with some of the other setups; they've had aluminum foil covers for too long. We'll have a camera committee meeting tomorrow to see how to proceed.

 ITMY has been upgraded  here I have the new lenses on hand to do the others when it fit into the schedule.

  5361   Wed Sep 7 18:19:37 2011 steveHowToVACstop pump down for overnight

Quote:

Jamie and Steve

We closed ITMX and ITMY chambers and started pumping around 11am

What we did before:

1, turned off AC power  to PZT Jena HV ps

2, checked jam nut positions

3, cheched  single o-ring shims

4, closed psl out shutter

 We are at 30 Torr of 7 hours of pumping with 2 roughing pumps.

Kiwamu will take over the rest of the roughing today. He will keep an eye on  the pumping speed to be  ~1-2 Torr/min  and open up the manual RV1 valve if needed.

The present status is #3023 of  "chamber open to vacuum open" mode and waiting the P1 pressure to drop to 500 mTorr

He will do the following to stop pumping at P1 = 500 mTorr

1, close V3

2, close RV1 with torque wheel

3, turn off PR1 & 3

4, disconnect metal hose between RV1 and PR3

 I will start the Maglev tomorrow morning.

  5365   Thu Sep 8 10:50:44 2011 steveUpdateVACpumpdown #71 comleted

Vacuum status:  " vacuum normal"   CC1 pressure 5e-5 Torr

Slow roughing through butterfly valve took 11 hours at 1-2 Torr/min speed.  We had a leak at the metal hose connecting o-ring  that became visible  at 200 Torr.

The vacuum envelope pressure rose to 500 mTorr from 450 mTorr  This is 50 mTorr leak plus outgassing over 11 hrs  over night stop =  5  mTorr /  hr

Atm2, Maglev pumpdown details. P2 and P3  are in the foreline of the Maglev. The pressure peaks at 4 Torr beacause the 3 drypumps have  little pumpimg speed at this range.

            External fan is turned on during this one hour period to prevent  Maglev turbo from overheating.

            Same things are  happenning with the two small TP2 and TP3 pumps under load. Their foreline pressure peak at 1 Torr.  They slow down to 45 K RPM from 50K RPM  and warm up to 36-39 C

Precondition: 36 days at atm

  5366   Thu Sep 8 13:20:07 2011 steveUpdatePEMvac envelope at atm for 36 days

We tried not to open chambers above 10,000 particles of 0.5 micron cf/min

New items going in:                       2 rasor beam traps, 5 badly oxidized old silver plated  setscrew with spring loaded tips......to be replaced in the future, viton tips for eq screws....some are lose, gold plated allen wrench installed at ITMX bottom, reglued magnet on ITMX

Bad hardware things found:          nylon ball "locking elements" on OSEM locking set screws with screwdriver  slot, lose  1064 nm filter on OSEM pd

  5395   Tue Sep 13 16:57:44 2011 steveUpdateLSCITMX oplev **

Quote:

I lined up the Y Arm for locking and then centered the oplevs for ETMY and ITMY.

* The ITMY OL has still got the old style laser. Steve, pleaes swap this one for a HeNe. Also the optical layout seems strange: there are two copies of the laser beam going into the chamber (??). Also, the QPD transimpedance needs to be increase by a factor of ~10. We're only getting ~500 counts per quadrant. Its worth it for someone to re-examine the whole ITMY OL beam layout.

* The ETMY OL beam was coming out but clipping on the mount for the ETMY OL HeNe. This indicates a failure on our part to do the ETMY closeout alignment properly. In fact, I get the feeling from looking around that we overlooked aligning the OL and IPPOS/ANG beams this time. If we're unlucky this could cause us to vent again. I undid part of the laser mount and changed the height on the receiving mirror to get the beam back onto the QPD.

I noticed that there is significant green light now getting into some of the IR PDs; beacuse of this there are weird offsets in the TRY QPD and perhaps elsewhere. We had better purchase some filters to tape over the front of the sensitive IR sensors to prevent the couplling from the green laser.

* There is a beam on IPPOS, but its too big for the detector (this has always been the case). We need to put a 2" lens with a weak focusing power on this path so as to halve the beam size on the detector. Right now its clipping and misleading. There is also a 0.9V offset on the SUM signal. I'm not sure if this readout is working at all.

* I couldn't find any beam on IPANG at all. Not sure what's changed since Kiwamu saw it.

 Old Coherent diode laser was replaced by Uniphase HE/NE 1125P at ITMX.

Newport 10B20NC.1 broadband beam sampler set up as beamspitter to dump 90% of the light into beam trap. Beam in to test mass  0.7 mW ,  returning to qpd 0.07 mW  = ~ 3,700 counts

f 1.5 m lens placed into ingoing beam path to reduce the spot size on the qpd.         ITMY oplev will be done in this manner tomorrow.

 

* IP-ANG is lost with the Piezo Jena PS

* IP-POS cable have to be found at the LSC rack

 

  5403   Wed Sep 14 07:51:20 2011 steveUpdateSUSPRM damping restored

The PRM damping was restored at side sensor var 1050

  5407   Wed Sep 14 15:05:52 2011 steveUpdatePEMair cond maintenance

Jeff has changed our AC filters inside the lab this morning. Now he is checking on the main filters at CES.  He will finish the roof units tomorrow.

Met One #1 counter is on the top of IOO chamber.  It is measuring 1 and 0.5 micron size particles.  One year of lab condition plot below.

 

  5415   Thu Sep 15 07:28:08 2011 steveUpdateSUSPRM damping restored

Quote:

The PRM damping was restored at side sensor var 1050

 The PRM sus damping restored.

  5434   Fri Sep 16 16:07:28 2011 steveUpdateSAFETYvisitors safety training

Paul, Mirko and Katrin visiting grad students received the 40m basic safety training.

  5497   Wed Sep 21 11:35:07 2011 steveUpdateVACRGA scan

RGA scan with maglev pumping speed at day 14 of the pump down.

The larger inserted box contains the tuning parameters of the SRS  200 amu RGA

  5529   Fri Sep 23 16:25:01 2011 steveUpdateVACvac rack UPS battery replaced

APC Smart -UPS 2200   model: SUA2200RM2U   batteries were replaced by compatible RBC43, 8x  12V5A

  5542   Mon Sep 26 11:35:44 2011 steveUpdateCamerasarms cameras upgraded

The arm's CCD cameras were reset as picture shows last week.

The height adjustment only works at ITMX. Short post holders are ordered to make this feature  available on the rest.

The 75 ohms video and power supply cables are stress relieved. Solid cover can be attached now without  miss aligning cameras.

  5562   Wed Sep 28 07:36:41 2011 steveUpdateSUSITMY damping restored

ITMY suspention damping restored

  5563   Wed Sep 28 07:46:42 2011 steveUpdateSUSDsub connections at the back of 1X5 are fixed

 

 I'm turning  the sus damping  off for Dsub connection fix at  the back of 1X5 rack

The plan is to install 4-40 jack screws to lock connector positions.

All dewittening(or called coil driver) and wittening D sub connectors are locked with two 4-40 socket head screws

  5587   Fri Sep 30 17:01:29 2011 steveUpdateSUSETMX oplev intensity effect on noise

Kiwamu and Steve,

This is one of the better oplev set up we have. Single bounce from TM, no mirror on stack. One lens and one  mirror on ISCT. Old Uniphase 1103P laser on heafty 3" od mounts.

Somewhat  big ~5-6 mm spot on qpd in  1,300 counts.

The intensity noise effect can be seen at 1 Hz and 3-20 Hz

Oplev servo was OFF

  5599   Mon Oct 3 08:38:21 2011 steveSummaryVACRecovery from the power shutdown is completed

 

I failed to start Rana's favorit anciant desktop computer at the vac rack. He has to baby this old beast just a little bit more.

Vacuum status: Vac Normal was reached through Farfalla: Rga was switched back to IFO and and Annuloses are beeing pumped now.

V1 was closed for about a day and the pressure reached  ~2.8 mTorr in the IFO.  This leakrate plus outgassing is normal

The ref cavity 5000V was turned on.

The only thing that has to be done is to restart the RGA. I forgat to turn it off on Friday.

 

  5610   Tue Oct 4 07:51:36 2011 steveUpdateCDSc1lsc and c1sus are still down

 

 c1lsc and c1sus are still down. Only ETMX and ETMY are damped

  5620   Wed Oct 5 11:33:25 2011 steveUpdateSUSPRM and BS oplev laser replaced

 

JDSU 1103P died after 4 years of service. It was replaced with new identical head of 2.9 mW output. The power supply was also changed.

The return spots of 0.04 mW  2.5 mm diameter on qpds are BS  3,700 counts and PRM 4,250 counts.

 

  5622   Wed Oct 5 17:08:49 2011 steveUpdateSUSBS oplev spectra

Kiwamu and Steve,

The He/Ne oplev shows no coherece so relative intensity noise is not limiting factor for the oplev servo

  5630   Fri Oct 7 14:04:48 2011 steveUpdateSUSHe/Ne intensity noise effect on oplevs

The SRM bounce peak 18.33 Hz. Suresh helped me to retune filter through Foton, but we failed to remove it.

ITMX_OPLEV_PERROR shows high coherence with oplev laser. This is our lousiest set up. I will work on it next week.

Generally speaking we can say that JDSU-Uniphase 1103P and 1125P laser intensity noise do not limit oplev servo performance.

However, the overall well being of filters, gain settings, beam sizes on qpds are poor.

 

  5645   Mon Oct 10 16:32:18 2011 steveUpdateSUSUL sensor of ETMY is recovered

 I lost UL osem voltage this morning when I was checking the actual connection at rack ETMY

This after noon I disconnected  the 64 pins IDE connector from satelite amp at the rack, and the two 25 pins Dsubs at this juction board.

UL OSEM recovered after reconnecting these three connectors.

Atm3, bad connection.........noisy UL

 