40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 338 of 350  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subjectdown Text Attachments
  5065   Sat Jul 30 02:47:43 2011 ranaUpdatePSLABSL Laser crystal temp left largely excited & left unattended for more than 3hours Hmm. Should have only been +/- 1
GHz. Some setting got changed apparently...
This is a part of the RefCav temperature
  
  4996   Wed Jul 20 06:52:01 2011 SureshUpdateLSCABSL - PSL beat lockThe ABSL locking setup to the PSL is down. 
According
the plan, I started to use the IR beam dumped
after the doubling crystal for the IR beat
  
  8581   Wed May 15 17:38:49 2013 JamieSummaryCDSAA/AI requirements

    

       
            
  
  15709   Fri Dec 4 19:23:40 2020 KojiUpdateElectronicsAA/AI board testing ongoingI have the setup built for the AA/AI board
testing around the PD testing area. Please
let me leave it like that for a week or so.
  
  422   Wed Apr 16 21:11:12 2008 ranaSummaryDAQAA/AI Filters for the DAQ & FE systemsI used Foton to make up some new filters which
will be used all over the project in order
to downsample/upsample.
 DAQ_filters_080416.pdf 
  3911   Fri Nov 12 20:40:51 2010 josephb, yuta, valeraConfigurationElectronicsAA voltage rangeWe changed the range of the two SUS AA
boards in the corner from +/-2 V to +/-10
V by changing the supply voltage from +/-5
  
  5022   Sun Jul 24 20:36:03 2011 haixingSummaryElectronicsAA filter tolerance analysisKoji and Haixing,
We did a tolerance analysis to specify
the conner frequency for passive low-pass
 6x 
  5023   Sun Jul 24 20:47:21 2011 ranaSummaryElectronicsAA filter tolerance analysisThis is sort of OK, except the capacitor
connects across the (+) terminals of the
two input opamps, and does not connect to
  
  5024   Sun Jul 24 22:19:19 2011 haixingSummaryElectronicsAA filter tolerance analysis 
>> This sort of OK, except
the capacitor connects across the (+) terminals
 low_pass_new.png 
  5038   Tue Jul 26 21:11:40 2011 haixingSummaryElectronicsAA filter tolerance analysis    
  4748   Thu May 19 12:09:41 2011 josephbUpdateCDSAA filter box pulled from 1X5, optic suspensions currently off[Steve, Joe]
Steve pulled the top AA filter box
from 1X5 which handled some of the suspensions
  
  4750   Thu May 19 17:53:03 2011 steveUpdateCDSAA filter box modified at 1X5

    

       
            
 P1070727.JPG 
  15744   Tue Dec 22 22:11:37 2020 gautamUpdateCDSAA filt repaired and reinstalledKoji fixed the problematic channel - the
issue was a bad solder joint on the input
resistors to the THS4131. The board was re-installed.
  
  5168   Wed Aug 10 12:28:22 2011 Ishwita , ManuelUpdatePEMAA board gainWe used a function generator, an oscilloscope
and the Data Viewer to check the gain of
the new AA board (used for the seismometers).
 pw_gur1_sts1_aug10.png 
  4959   Mon Jul 11 10:10:31 2011 IshwitaConfiguration AA board The AA board shown in attachment 1 will
be used in the seismometer hardware setup.
A cartoon of this setup is shown in attachment
 P7080305.JPGseismometers.png 
  4979   Sat Jul 16 18:54:05 2011 Ishwita, ManuelConfigurationElectronicsAA boardWe fixed the anti-aliasing board in its
aluminum black box,  the box couldn't
be covered entirely because of the outgoing
 DSC_3236.JPGpic1.pngDSC_3237.JPG 
  7543   Sun Oct 14 20:51:20 2012 DenUpdatePEMAA board

    

       
            
 acc.pngDSC_4747.JPG 
  7546   Mon Oct 15 10:14:22 2012 DenUpdatePEMAA board

    

       
            
  
  8555   Thu May 9 00:05:12 2013 rana, Koji, JenneSummaryLSCAA and AI changeWe would
like to increase the UGF of the PRC loop
 AAAI.pdf 
  3806   Thu Oct 28 04:23:38 2010 ranaUpdateIOOA2L prepTo get the angle to length signal before
the c1ioo processor gets going, we need a
length signal. We can use either the error
  
  13996   Thu Jun 21 14:23:22 2018 Udit KhandelwalSummaryGeneralA summary of the Tip-TIlt Mirror Holder design changesHere’s a quick summary of the Tip-Tilt
Design updates (all files are in the dropbox
in [TipTiltSus>TT_New]) that I have been
 1.png2.png3-1.png3-2.png3-3.png 
  13997   Thu Jun 21 14:57:59 2018 KojiSummaryGeneralA summary of the Tip-TIlt Mirror Holder design changes> 2. Weighted screw rod at the
bottom for tilting the mirror-holder:

Too long. The design of the holder
  
  1409   Thu Mar 19 02:45:36 2009 YoichiConfigurationIOOA loose wire found for MC1 I found a loose connection of a wire in the
cross-connect between an ADC and the MC1
coil driver's UL bias input.
  
  1410   Thu Mar 19 10:45:43 2009 YoichiConfigurationIOOA loose wire found for MC1 I attached a 6-hour trend of the MC mirror
OSEM signals with the MC unlocked.
The drift of the MC1 is within 20 counts
 AfterWireFix-1.pdf 
  15073   Wed Dec 4 19:54:27 2019 gautamUpdateLSCA look to the pastTrawling
through some past elogs, I saw that the ALS
noise increase as a function of CARM offset
 DRFPMI_2016March.pdf 
  59   Sat Nov 3 16:20:43 2007 waldmanSummaryOMCA good day's work
I followed up yesterday's test of the PZT
with a whole mess of characterizations of
 6x 
  4376   Fri Mar 4 03:31:35 2011 kiwamuUpdateGreen LockingA first noise budgetI made a noise budget for the ALS noise
measurement that I did a week ago (see
#4352).
 noise_budget.png 
  15562   Mon Sep 7 23:49:14 2020 gautamUpdateBHDA first look at RF44 schemeSummary:

Over the last couple of days, I've
been working towards getting the infrastructure
  
  15563   Tue Sep 8 01:31:43 2020 KojiUpdateBHDA first look at RF44 scheme- Loose fiber coupler: Sorry about that.
I could not detect something was loose there,
although some of the locks were not tightened.
  
  6414   Wed Mar 14 13:16:50 2012 kiwamuUpdateLSCA correction on Noise estimatino in the REFL33QA
correction on the previous elog about the
REFL33Q noise:
  
  1286   Mon Feb 9 17:09:51 2009 YoichiUpdateComputersA bunch of updates for the network GPIB stuff.During the work on ISS, we noticed that netgpibdata.py
is very unreliable for SR785.
The problem was caused by flakiness of the
  
  15820   Thu Feb 18 20:24:48 2021 KojiSummaryElectronicsA bunch of electronics receivedTodd provided us a bunch of electronics.
I went to Downs to pick them up this afternoon
and checked the contents in the box. Basically,
 IMG_0416.jpeg 
  15828   Sat Feb 20 10:01:48 2021 gautamSummaryElectronicsA bunch of electronics receivedWill we also be receiving the additional
34 Satellite Amplifier PCBs?
  
  15830   Sat Feb 20 16:46:17 2021 KojiSummaryElectronicsA bunch of electronics receivedWe received currently available sets. We
are supposed to receive more coil drivers
and sat amps, etc. But they are not ready
  
  15866   Fri Mar 5 00:53:09 2021 KojiSummaryElectronicsA bunch of electronics receivedReceived additional front/rear panels.
Updated the original entry and Wiki [Link]

 
  
  15868   Fri Mar 5 15:03:28 2021 gautamSummaryElectronicsA bunch of electronics receivedThe PCBs for the D1002593
BIO I/F (5pcs ea of D1001050
and D1001266)
  
  15870   Fri Mar 5 15:32:53 2021 KojiSummaryElectronicsA bunch of electronics receivedThe parts will be ordered by Koji
The components for the additional BIO I/F
have been ordered.
  
  15981   Wed Mar 31 03:56:37 2021 KojiSummaryElectronicsA bunch of electronics receivedWe have received 9x 18bit DAC adapter boards
(D1000654)
 P_20210331_013257.jpgP_20210331_014020.jpg 
  10038   Fri Jun 13 19:09:44 2014 KojiUpdateIOOA blown fuse found on the euro card crate at 1X2 (IOO) rack.[Rana Zach Koji]
We tracked down the MC locking issue
to be associated with the power supply problem.
  
  4486   Mon Apr 4 18:58:44 2011 BryanConfigurationGreen LockingA beam of purest greenWe now have green light at the Y end. 
The set-up (with careful instructions
 P4040042.JPG 
  3942   Wed Nov 17 23:45:20 2010 JenneUpdateSUSA bad day for suspensions[Jenne, Suresh]
Today has been a downright miserable
day in the world of suspension work. Thumbs
 StatusTable.png 
  2364   Tue Dec 8 09:18:07 2009 JenneUpdateComputersA *great* way to start the day....Opening of ETMY has been put on hold to
deal with the computer situation.  Currently
all front end computers are down.  The
  
  7587   Mon Oct 22 09:10:07 2012 SteveUpdateVAC@750Torr

    

       
            
 ventOct222012.png 
  1659   Sat Jun 6 01:44:53 2009 rob UpdateLocking?Lock acquisition is proceeding smoothly
for the most part, but there is a very consistent
failure point near the end of the cm_step
  
  1660   Sun Jun 7 04:57:39 2009 YoichiUpdateLocking?


   
        
            
  
  1663   Tue Jun 9 23:25:24 2009 robUpdateLocking?


   
        
            
  
  11685   Tue Oct 13 05:48:39 2015 ericqUpdateLSC:/[ericq, Gautam]

Despite our best efforts, the grappa
remains out of reach: the DRFPMI was not
  
  4237   Wed Feb 2 03:27:20 2011 KojiSummaryGreen Locking85MHz Freq dividerThe freq divider was built and installed
in the beat detection path.
Attachment 1: Circuit diagram
 freq_divider.pdfIMG_3816.JPGIMG_3818.JPG 
  3803   Thu Oct 28 03:07:53 2010 kiwamuUpdateGreen Locking80MHz VCO for green PLL : a health check I
did a health check for a 80MHz VCO box. 
 VCO_LPF_fit.png 
  3820   Fri Oct 29 06:20:20 2010 kiwamuUpdateGreen Locking80MHz VCO for green PLL : VCO calibration I calibrated the VCO frequency
as a function of the applied input voltage.
 calibration.png 
ELOG V3.1.3-