  5784   Wed Nov 2 11:29:04 2011 not ZachUpdateSUS"Dr. SUS" progress

Quote:

Now that NDS2 is working, I was able to run all parts of diagAllSUS (except for the matrix writing) without errors. Barring issues with standard commands (freeswing, turnOnWatchDogs.csh, caput, etc.), Dr. SUS should be ready to go.

As requested, I have suppressed the generation of an elog post containing the results of the diagonalization.

Dr. SUS will run on allegra as a cron job at 8:00am on Sundays:

allegra:peakFit>crontab -l

PATH=/bin/:/usr/bin/:/cvs/cds/caltech/apps/linux64/matlab/bin/:/cvs/cds/caltech/apps/linux/gds/bin/:/cvs/cds/caltech/apps/linux/tds/bin/

PWD=/cvs/cds/caltech/apps/linux/gds/lib/

LD_LIBRARY_PATH=/cvs/cds/caltech/apps/linux/gds/lib

01 05 * * 0 cat /cvs/cds/caltech/users/kiwamu/work/20091026_OMC-LSC-diag/src/OMC_LSC_timing.m | matlab -nosplash -nodesktop > /dev/null

 

0 8 * * 0 /cvs/cds/rtcds/caltech/c1/scripts/SUS/peakFit/runDrSUS

Also: should these variable definitions really be here? 

Cron starts with only a very minimal PATH.  However, this shouldn't be an issue if you specify the full path to the commands.

The rest of the env vars should probably not be there.

Also, Zach:  using /cvs/cds is now forbidden.  We need to put this script in the right place.

  8370   Thu Mar 28 23:06:48 2013 AnnalisaUpdateAuxiliary locking"Alberto" NPRO laser again on PSL table

 "Alberto"NPRO laser has been moved again on PSL table in order to make a measurement of the beat note varying also the PSL temperature.

It is useful because if the PSL temperature would drift  we have to know which is the NPRO temperature that returns the beat.

I'm going to measure it tomorrow.

 

 

  4765   Wed May 25 19:19:11 2011 JamieConfigurationCDS!!!CHECK IN YOUR MODELS!!!

!!!CHECK IN MODEL CHANGES!!!

Today I found three models that were modified, but not checked in to the SVN repository:

M       sus/c1/models/lib/sus_single.mdl
M       isc/c1/models/c1lsc.mdl
M       isc/c1/models/c1mcp.mdl

I checked in the c1lsc model, since I think it was just the change that Kiwamu made in http://nodus.ligo.caltech.edu:8080/40m/4749.  I left the others, since I have no idea what they are or who made them.

Please please please remember to commit your model changes to the SVN after you're done.  This is particularly important for important models, such as c1lsc.  If you don't check in your changes I can pretty much guarantee that at some point you will loose them.

 

  4668   Mon May 9 16:58:23 2011 JamieBureaucracyCDS!!!!REMEMBER TO COMMIT YOUR MODIFICATIONS!!!!

Whenever you modify any of the front-end code in /opt/rtds/caltech/c1/userapps, such as models, scripts or medm screens, REMEMBER TO COMMIT YOUR CHANGES, WITH A LOG MESSAGE!!!

cd /opt/rtcds/caltech/c1/userapps/trunk
svn commit path/to/modified/file

If you forget to commit things, they may be purged and you will loose your work.  ALWAYS COMMIT!

Things to note and watch out for:

  • When you commit, make sure you specify explicitly the path to the file that you are committing.  This repository is shared by all LIGO sites, including the sites (LHO and LLO) so you really want to make sure you're not committing anything that affects anything other than "c1" (ie. the 40m)
  • Only commit one file at a time, unless the changes to multiple files are tightly coupled.
  • Never commit without specifying the path to the file that you are committing.  Other people may be working on other files in the repository, and you don't want to commit their work with yours.
  • YOU MUST LEAVE A LOG MESSAGE.  Your log message should be specific to the file you have modified, and should be clear and verbose to explain exactly what you have done.
  • Use the "svn status" command to give you an overview of what is going on in the working directory.  This will tell you which files have been modified.  See "svn help status" for more information.

If you have questions ASK.  Don't force things.

  4669   Mon May 9 17:21:13 2011 JamieBureaucracyCDS!!!!REMEMBER TO COMMIT YOUR MODIFICATIONS!!!!

Also, remember to update the svn working copy before you begin doing any work, to make sure you're working on the most recent version:

cd /opt/rtcds/caltech/c1/userapps/trunk
svn update
  1363   Fri Mar 6 01:04:49 2009 Kiwamu IZUMIConfigurationIOO!! lock-in amp disconnected !!

The power supply of a lock-in amp, which is on the Y-arm side of PSL clean room, was pulled out by my mistake.

Then I reconnected it, but I don't know whether it is re-adjusted properly.

I'm sorry about this. If you are using that amp, it should be checked.

  12144   Wed Jun 1 15:01:56 2016 SteveUpdateSUS wire standoffs update

There are some issues with 5 mm sapphire prism Atm5. It will cause  interference between one of the prisms and the Side OSEM.

Here are some drawings to see the issues with larger wire standoff.

The 2 mm prism will work.with a 1 mm longer dumbell.

Quotes requested from http://photomachining.com/laser-micromachining-photomachining-contact.html and http://www.optocity.com/ 

 

 

  12146   Thu Jun 2 16:35:44 2016 KojiUpdateSUS wire standoffs update

Gap of the prism from the mirror

Sag: s = R(1-Cos[ArcSin[d/2/R]])

- Mirror curvature sag for 2mm prism (R=37.75mm): s=13um

- Minimum gap: 20um => s=33um => R=15mm

- Nominal gap: 35um => s=48um => R=10mm

- Maximum gap: 50um => s=63um => R=8mm


The second figure shows somewhat realistic arrangement of the pieces

  12454   Tue Aug 30 15:44:28 2016 SteveUpdateSUS wire standoffs update

100 Sapphire prisms ordered. Delivery date 9-30-2016

~60 deg. prisms,

Size A=B=C=2 mm, length 5 mm

Material: sapphire

Surface quality: 5 micron RMS

Tolerances: +- 0.1 mm

This prism will be used as a mechanical component

No crystal orientation required

 

Quote:

There are some issues with 5 mm sapphire prism Atm5. It will cause  interference between one of the prisms and the Side OSEM.

Here are some drawings to see the issues with larger wire standoff.

The 2 mm prism will work.with a 1 mm longer dumbell.

Quotes requested from http://photomachining.com/laser-micromachining-photomachining-contact.html and http://www.optocity.com/ 

 

 

 

  12550   Tue Oct 11 10:38:51 2016 SteveUpdateSUS wire standoffs update

100 Sapphire prizms arrived.

 

  12760   Fri Jan 27 14:50:04 2017 SteveUpdateSUS wire standoffs update

The 3 pieces of Sapphire v-groove test cuts are back. They look good. The suspension wire 0.0017" ( 43 micron ) is show on some of the pictures.

  12761   Fri Jan 27 15:36:17 2017 KojiUpdateSUS wire standoffs update

Very nice! I got excited.

  • Don't you ask Calum and co to check the groove size with their microscopes? Just give the samples and the wire.
  • Do we want to make a simple "guitar" setup to measure the vibration Qs with Al piece, glass prism, ungrooved Sapphire, this grooved sapphire, grooved ruby, etc?
  12846   Thu Feb 23 09:32:20 2017 KojiUpdateSUS wire standoffs update

Kyle took high quality images of  the three sapphire prisms using the microscope @Downs. He analyzed the images to see the radius of the groove.

They all look sufficiently sharp for a 46um steel wire. Thumbs up.
I am curious to see how the wire Q is with grooved sapphires, ungrooved sapphires, grooved ruby, grooved aluminum stand off, and so on.

  13030   Thu Jun 1 16:21:55 2017 SteveUpdateSUS wire standoffs update

Ruby wire standoff received from China. I looked one of them with our small USB camera.  They did a good job. The  long edges of the prism are chipped.

The v-groove cutter must avoid them. Pictures will follow.

 

  12346   Thu Jul 28 08:42:36 2016 SteveUpdateSUS wire clamp

The clamp is in the machine for milling off the grooves. It's condition is normal. The edges needs some 800 sand paper so it is not sharp anywhere.

How did those nicks get on the edge? Fortunatelly they did not aligned with the wire.

 

  10076   Thu Jun 19 17:28:19 2014 SteveUpdatePSL window device is ready for test

The window is at the north west corner of the  PSL enclosure.

The 1 mm thick BK7 window is AR coated both side R <0.08%,  W2-PW1-1004-1064-0

The PZT stack is 0.75" OD, 0.25" thick with  ~ 6 mm ID,  motion range 2.5 micron at 200V

Soft silicon rubber isolation.

 

RXA: This is the opto-mechanical phase shifter that Steve has built for diagnosing scattered light problems. We put it into the reflected light path of any of the cavities and see if it can move the scattering noise from DC up to a higher frequency. e.g.:

The paper on this from GEO

  9443   Thu Dec 5 11:06:43 2013 SteveUpdateCameras viewport video ccd cameras are all covered

Quote:

Quote:

Can't we somehow hook up this camera to the MUX with the movie mode?
I think both the MUX and the sensoray are compatible with the color video signal.
Only the old CRT is B/W.

 Watek 902H ccd with Tamron M118FM50 lens is hooked up to MUX  Please be careful! In this set up the lens is close to the view port glass window! 

 PRM-BS & Faraday video ccd  cameras  covered as shown. These thin wall metalized ducts are perfect for blocking light in both direction.

They are very light and give you easy access to adjustment.

  1459   Wed Apr 8 09:36:20 2009 steveConfigurationVAC valve condition changed to BG to calibrate the RGA

Vacuum normal valve condition was changed to accommodate SRS-RGA calibration.

 

The annulus valves were closed to free TP3 to pump on the RGA
VM1 was closed to isolate the RGA from the IFO.
 
 
VM3 opened to TP3.
 
This condition is called back ground (BG) mode. It is where we can calibrate and see the RGA background without the IFO.
  14028   Thu Jun 28 08:09:51 2018 SteveUpdateCDS vacuum pneumatic N2 pressure

The fardest I can go back on channel C1: Vac_N2pres is  320 days

C1:Vac-CC1_Hornet Presuure gauge started logging Feb. 23, 2018

Did you update the " low N2 message"  email addresses?

 

Quote:

I moved the N2 check script and the disk usage checking script from the (sudo) crontab of nodus no to the controls user crontab on megatron yes.

 

  14029   Thu Jun 28 10:28:27 2018 ranaUpdateCDS vacuum pneumatic N2 pressure

we disabled logging the N2 Pressure to a text file, since it was filling up disk space. Now it just sends an email to our 40m mailing list, so we'll all get a warning.

The crontab uses the 'bash' version of output redirection '2>&1', which redirects stdout and stderr, but probably we just want stderr, since stdout contains messages without issues and will just fill up again.

  11695   Fri Oct 16 18:27:52 2015 SteveUpdateVAC vacuum normal condition

Vacuum normal configuration with VM1-closed, VM2-open valve positions. Power load normal 24V 0.2A

Maglev rotation 560 Hz at room temp body temp.

"NO COMM" error message on medm screen. Gauge controller pressures are read able.

All vac comp LEDs are green. We have to reboot on Monday to enable communication.

 

  9514   Thu Jan 2 10:50:24 2014 SteveUpdateVAC vacuum monitor is still blank

 The date is correct on this monitor.

Last stored RGA scan data Dec 20, 2013

IFO pressure at CC1 5.8e-6 Torr

Valve configuration: Vacuum Normal, confirmable only by manual checking of position indicators and pressure gauge controllers  readouts

 

  9515   Thu Jan 2 13:35:06 2014 KojiUpdateVAC vacuum monitor is still blank

We probably need to restart the machine, but I didn't want to touch c1vac1 and c1vac2. 

  9581   Tue Jan 28 11:13:50 2014 KojiUpdateVAC vacuum monitor is still blank

[Steve Koji]

We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.

First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back.

  12209   Tue Jun 21 14:12:10 2016 SteveUpdatePEM vacuum envelope wiped

I wiped down the cranes with wet towel and Mario our janitor did the chamber tops with the tubes.

The optical tabels were not touched.

The outside temp peaked at 44 C yesterday

 

  9582   Tue Jan 28 16:26:40 2014 SteveUpdateVAC vacuum computers are back without safety

Quote:

[Steve Koji]

We pushed the reset button of c1vac1 and c1vac2 and the vacuum screen is back.

First, we pushed the reset button of c1vac1 and pushed the one on c1vac2.
This did not bring c1vac2 up. We pushed the reset of c1vac2 again and now everything of the vacuum screen is back.

 1, Reset works

 2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!

      It's may be the time to go back to an isolated, vacuum controller only computer.

 

The present valve configuration at Atm1

a, all annuloses are vented

b, valve cables disconnected at: VC1 and 4 IP gate valves

c, the RGA is off and it is pumped by the Maglev through VM2

d, cryo pump is being roughed with TP3  It's outgassing rate was 25 mTorr / min

e, Roughing hose is disconnected

  9599   Wed Feb 5 08:14:59 2014 SteveUpdateVAC vacuum computers are back without safety

Quote:

 

 1, Reset works

 2, Default values are lost. They actually reversed into open and turn on everything when power recycle c1vac1, c1vac2 or 24V dc power supply. This can vent the IFO in an event of power failure!

      It's may be the time to go back to an isolated, vacuum controller only computer.

 

The present valve configuration at Atm1

a, all annuloses are vented

b, valve cables disconnected at: VC1 and 4 IP gate valves

c, the RGA is off and it is pumped by the Maglev through VM2

d, cryo pump is being roughed with TP3  It's outgassing rate was 25 mTorr / min

e, Roughing hose is disconnected

 Vacuum checks before pump down:

1, check intermittent contact issue in black relay box

2, reconnect cable to ion pumps and vent them to atm before pump down

3, repeat power shutdown-reboot at atmosphere

  8356   Tue Mar 26 16:36:24 2013 SteveUpdate40m Upgrading table leveling mounts go here

Quote:

Steve's suggestion for how to level the end table using "swivel leveling mounts":

end-tabel-leveling.png

 

1, level table with 4 swivels, lock nuts  3/16 -vertical alignment    2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction

   Adjustable mount is here to compensate for bad tilting  floor <http://www.mcmaster.com/#6111K52>  

      See grouting plans of the past   http://nodus.ligo.caltech.edu:8080/40m/7248

  8372   Fri Mar 29 16:30:27 2013 SteveUpdate40m Upgrading table leveling mounts go here

Quote:

Quote:

Steve's suggestion for how to level the end table using "swivel leveling mounts":

end-tabel-leveling.png

 

1, level table with 4 swivels, lock nuts  3/16 -vertical alignment    2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction

   Adjustable mount is here to compensate for bad tilting  floor <http://www.mcmaster.com/#6111K52>  

      See grouting plans of the past   http://nodus.ligo.caltech.edu:8080/40m/7248

 

  9257   Tue Oct 22 10:12:33 2013 SteveUpdatePEM south arm AC intake duct checked

  The 4th week of no wet mopping of the floor  and no wet wiping  the vacuum envelope.

 

We cleaned the intakes of the south arm IFO air condition. The bottom duct have quite a bit accumulation Atm1

See wet wiped contrast on Atm2

We found 3 holes around pipes ( coming from CES ) on the east wall that has to be sealed.

After closer examination of these holes, they are sealed off well.

  2701   Tue Mar 23 10:11:13 2010 steveUpdatePEM small air cond unit failed yesterday

Old control room air condition failed yesterday around noon. It was blowing 80-85F hot air for about 2-3 hours at racks 1Y4-7 and the entry room 103

  14299   Fri Nov 16 10:26:12 2018 SteveUpdateVAC single viton O-rings

The 40m vacuum envelope has one large single O-ring on the OOC west side. All other doors have double O-ring with annuloses.

There are 3  spacers to protect o-ring. They should not be removed!

 

The Cryo-pump static seal to VC1 also viton. All gate valves and right angle valve plates have single viton o-ring seal.

Small single viton o-rings on all optical quality viewports.

Helium will permiate through these fast. Leak checking time is limited to 5-10 minutes.

All other seals are copper gaskits. We have 2 manual right angle with METAL-dynamic seal [ VATRING ] as  VV1 & RV1

 

  4350   Thu Feb 24 16:47:26 2011 steveConfigurationPSL shutter is back on the PSL output

Uniblitz mechanical shutter was placed into the beam path of the PSL output with razor beam trap. The output power was 1.39W at 2.08A

It is working from the MEDM screen "old map" C1IOO_Mech_Shutter.adl

  14199   Tue Sep 18 14:02:37 2018 SteveUpdatesafety safety training

Yuki Miyazaki received 40m specific basic safety training.

 

  7434   Mon Sep 24 17:47:05 2012 SteveUpdateVAC ready to pump

  The IFO will be at atmosphere  overnight. The annuloses are pumped down. The access connector jam nuts are tightened to 45 ft/lbs

Actual pumpdown will start tomorrow morning.

  9980   Wed May 21 09:35:33 2014 SteveUpdateSUS razor beam dumps ETMX_ISCT

Quote:

Anodized aluminum dumps replaced by 6 razor beam dumps.

Two more razor beam dumps added this afternoon.   The picture will updated tomorrow.

 There are 9 razor beam dumps at ETMY-ISCT

  12626   Fri Nov 18 15:10:06 2016 SteveUpdateGeneral projector shipped out for repair

Vivitek D952HD sn2160130 was send out for warranty repair. It's hard to believe that it has a 5 year warranty...... RMA - WR16004483.....expected to be back by Friday, Dec 2

Quote:

The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this is usual. I have left the power cable unplugged for now...

Replacement is ordered Nov 4

 

  11915   Wed Jan 6 10:58:03 2016 SteveUpdateGeneral projector light bulb is out

Projector light bulb ordered

Quote:

 

[ Manasa, Ericq and Steve ]

 Vivitek D952HD with 186 hours installed.

 

  12596   Thu Nov 3 12:40:10 2016 gautamUpdateGeneral projector light bulb is out

The projector failed just now with a pretty loud 'pop' sound - I've never been present when the lamp goes out, so I don't know if this is usual. I have left the power cable unplugged for now...

Replacement is ordered Nov 4

  7595   Tue Oct 23 09:37:33 2012 SteveUpdateSUS passive TT adjustment correction

Quote:

Tip Tilt pitch adjustment on existing-in vacuum suspension. This can be added by a simple installation of a 1.25" long 2-56 threaded rod with nuts.

 We should check that  their sus wire diameter are 0.0017"  All 2-56 hardware are in and  Bob is cleaning them.

  9374   Wed Nov 13 11:30:07 2013 SteveUpdatePEM particle counter MOVED
Particle counter moved from the top of IOOC to the east wall
  9254   Fri Oct 18 15:18:49 2013 SteveUpdatePEM particle count peak or ...

Sunday evening fireworks. Manasa heard it.

  9952   Wed May 14 10:04:06 2014 SteveSummarySUS oplev laser and temperature

 ETMX oplev qpd gain has to be increased.

 

  6323   Mon Feb 27 14:35:22 2012 steveUpdateSUS oplev YAW transfer functions

 The BS and the PRM have 3.3 Hz resonant gain filters that kill the phase margins.

 

  6309   Thu Feb 23 10:53:54 2012 steveUpdateSUS oplev PIT transfer functions

 Oplev transfer functions PIT UGF were optimized to be at 2-3 Hz with 60 degree minimum phase margin by adjuting oplev gains.

Additional Notes by KI:

  • The PRM oplev has a tailored 3.3 Hz resonant gain in order to calm down a wobble during the lock acquisitions.
  • Also in the PRM oplev a 35 Hz elliptic cut-off filter wasn't  activated at the time when Steve measured it.
  • In both ITMs, elliptic cut-off filters seem to have higher corner frequencies compered with the others.
    • I guess these settings are from the old days.
  • ETMs and ITMs have whitening filters while the rest of the suspensions don't.
    • Without the whitening filters, normally the signals above 30 Hz are covered by some electrical noises or perhaps He-Ne laser intensity noise (#5630).
      • This is why we usually use the 35 Hz elliptic filters to roll off the control noises.
    • Since the ETMs and ITMs have whitening filters they potentially can have slightly higher corner frequencies in the elliptic filters.
      • Of course the corner frequencies need to be re-designed in terms of the amount of noise injection to the longitudinal motion.

 

  974   Fri Sep 19 11:48:14 2008 steveUpdateComputers old hubs can make one happy
Joseph finds a XIX century bottle neck hub: CentreCOM 3624TR 10Base-T
and happily replaces it with Netgear GS724T 1000Base-T
  3422   Fri Aug 13 18:32:48 2010 steveUpdatePEM new legs attached to optical table

Koji, Rana and Steve

 

The floor preparation continued today. The really messy part of drilling and jack-hammering the concrete were done in controlled manner.

Particle counts peaked at 106K of 0.3 micron and 13 K of 1.0 micron particles/ cfmin at the top of SP table.

Legs were installed with the help of Koji and strongman Rana. Professor Rana was very useful lifting the 85 lbs legs. 

 

Atm1, Drilling holes for ribbed bar reinforcement of concrete

Atm2, Koji and Rana are playing hide and seek while installing legs

Atm3-4, 6 Rigid tripod legs attached by 6x3 of 1/4-20x 7/8 screws. The top plates of the legs were torqued to 108 ft/lbs by Rana

  8822   Wed Jul 10 14:49:00 2013 SteveUpdateGreen Locking more fiber protective tubing layed

Quote:

Craig, Gautam and Steve,

Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.

It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- nylon slit corrugated loom tubing " 1.5" ID

The fiber is not protected between 1Y1 and 1Y4

 Installed 0.5" ID 10 ft long protective tubing at the PSL end of the  ETMY fiber this morning. Here I had to cable tie a bunch of cables at the east side of the PSL enclosure.

They were hanging off the table blocking space were the sliding doors move.

 At the ETMX end of the X-arm fiber received the same protective tubing.

  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing

Crane balancing at the south end is continuing today.

  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

Quote:

The control room temp is warmer than usual. The heat exchanger Office Pro 18 set point was lowered from 70 to 68F yesterday.

The MOPA headtemp is higher also. The Neslab chiller bath temp peaks around 21.6 C daily. This should be rock solid 20.00 C

It did not have any effect.

Now, I have just lowered the thermostat setting of room 101 from 73 to71F  I  hope Koji can take this.

 Little change in the AC set temp can make wonders. Neslab chiller bath temp 19.99C is back to normal and daily variation of PSL are much better.