    Reply  Mon Dec 20 14:10:56 2021, Anchal, Update, BHD, All coil drivers ready to be used, modified and tested 
    Reply  Mon Dec 20 17:26:13 2021, Yehonathan, Update, BHD, SOS assembly 7x
Entry  Tue Dec 21 16:35:39 2021, Koji, Update, VAC, ITMX NW feedthru (LO1-1) connector pin bent PXL_20211222_002019620.jpgPXL_20211222_003014068.jpg
    Reply  Tue Dec 21 18:04:46 2021, Yehonathan, Update, BHD, SOS assembly 
Entry  Wed Dec 22 14:57:05 2021, Koji, Update, General, chiara local backup 
    Reply  Wed Dec 22 18:16:23 2021, Koji, Update, SUS, Remaining task for 2021 ITMX_2016_07_21.jpgScreen_Shot_2021-12-22_at_18.03.42.png
    Reply  Thu Dec 23 16:38:21 2021, Koji, Update, General, Is megatron down? (Re: chiara local backup) 
    Reply  Fri Dec 24 16:49:41 2021, Koji, Update, General, Is megatron down? (Re: chiara local backup) PXL_20211224_235652821.jpg
Entry  Sun Jan 2 20:46:46 2022, Koji, Update, SUS, End SUS Electronics building PXL_20220103_081133119.jpg
    Reply  Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4 
    Reply  Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3 
Entry  Tue Jan 4 18:26:59 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
    Reply  Tue Jan 4 18:27:23 2022, Paco, Update, BHD, SOS assembly -- PR3 PR3_roll_balance.pngPR3_magnet_height.pngFreeSwingingSpectra.pdfPXL_20220104_231742123.jpgPXL_20220104_232809203.jpg
    Reply  Wed Jan 5 17:46:04 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
    Reply  Wed Jan 5 19:18:06 2022, Yehonathan, Update, BHD, SOS assembly -- AS4 AS4_roll_balance.pngAS_4_magnet_height.pngFreeSwingingSpectra.pdf
    Reply  Thu Jan 6 12:52:49 2022, Anchal, Update, CDS, Yearly DAQD fix 2022! 
    Reply  Thu Jan 6 13:54:28 2022, Koji, Update, CDS, Yearly DAQD fix 2022! Screenshot_2022-01-06_13-57-40.png
Entry  Thu Jan 6 14:08:14 2022, Koji, Update, CDS, More BHD SUS screens added to sitemap Screenshot_2022-01-06_14-06-15.png
Entry  Thu Jan 6 15:10:38 2022, Koji, Update, SUS, ITMX Chamber work PXL_20220107_044739280.MP.jpgPXL_20220107_044958224.jpgPXL_20220107_044805503.NIGHT.jpgScreen_Shot_2022-01-06_at_20.54.04.png
    Reply  Thu Jan 6 17:00:20 2022, Yehonathan, Update, BHD, SOS assembly -- LO2 LO2_roll_balance.pngLO2_magnet_height.pngFreeSwingingSpectra.pdf
    Reply  Thu Jan 6 17:16:51 2022, Yehonathan, Update, BHD, Using Peek screws/nuts 
Entry  Thu Jan 6 22:18:47 2022, Koji, Update, CDS, SUS screen debugging Screen_Shot_2022-01-06_at_18.03.24.png
    Reply  Fri Jan 7 17:54:13 2022, Anchal, Update, BHD, PR2 Sat Amp has a bad channel Screen_Shot_2022-01-07_at_6.05.39_PM.png
    Reply  Fri Jan 7 17:59:45 2022, Yehonathan, Update, BHD, SOS assembly -- SR2 SR2_roll_balance.pngSR2_magnet_height.pngFreeSwingingSpectra.pdf
    Reply  Fri Jan 7 18:24:25 2022, Koji, Update, BHD, SOS assembly -- SR2 
    Reply  Fri Jan 7 18:28:13 2022, Koji, Update, BHD, PR2 Sat Amp has a bad channel 
    Reply  Mon Jan 10 13:35:52 2022, Anchal, Update, BHD, PR2 Sat Amp has a bad channel 
    Reply  Mon Jan 10 14:00:44 2022, not Koji, Update, BHD, SOS assembly -- SR2 
    Reply  Mon Jan 10 15:45:55 2022, Paco, Update, Electronics, ITMY feedthroughs and in-vac cables installed - part I 
    Reply  Mon Jan 10 15:59:46 2022, Koji, Update, BHD, PR2 Sat Amp has a bad channel 6x
    Reply  Mon Jan 10 17:04:47 2022, Anchal, Update, BHD, AS1 Sat Amp CH2 had offset 
    Reply  Mon Jan 10 18:20:45 2022, Anchal, Update, BHD, Tested 2" PR2 candidates transmission 
    Reply  Tue Jan 11 09:53:14 2022, not Koji, Update, BHD, SOS assembly -- Peek screws and nuts 
    Reply  Tue Jan 11 10:23:18 2022, Paco, Update, Electronics, ITMY feedthroughs and in-vac cables installed - part II 
    Reply  Tue Jan 11 10:46:07 2022, Tega, Update, CDS, SUS screen debugging 
Entry  Tue Jan 11 10:58:58 2022, Tega, Update, SUS, Temporary watchdog 
    Reply  Tue Jan 11 13:43:14 2022, Koji, Update, SUS, Temporary watchdog 
    Reply  Tue Jan 11 14:21:53 2022, Paco, Update, Electronics, BS feedthroughs and in-vac cables installed 
    Reply  Tue Jan 11 15:21:16 2022, Anchal, Update, BHD, PR2 transmission calculation LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPRS_Trans_Calc.ipynb.zip
    Reply  Thu Jan 13 16:08:00 2022, Yehonathan, Update, BHD, gluing magnets after AS1/4 misfortune 
    Reply  Thu Jan 13 17:10:55 2022, Anchal, Update, BHD, PR2 transmission calculation LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPR2_Trans_Calc.ipynb.zip
    Reply  Fri Jan 14 03:07:04 2022, Koji, Update, BHD, PR2 transmission calculation 
    Reply  Fri Jan 14 11:00:29 2022, Anchal, Update, BHD, PR2 transmission calculation 
    Reply  Fri Jan 14 12:01:21 2022, Anchal, Update, Electronics, BS & ITMY feedthroughs labeled and connected to Sat Amps 
    Reply  Fri Jan 14 13:46:25 2022, Anchal, Update, BHD, PR2 transmission calculation updated LO_power_vs_PR2_transmission.pdfPRC_Gain_vs_PR2_transmission.pdfPR2_Trans_Calc.ipynb.zip
Entry  Fri Jan 14 14:04:51 2022, Paco, Update, Electronics, RFSoC 2x2 board arrived PXL_20220114_211249499.jpg
    Reply  Fri Jan 14 17:33:10 2022, Yehonathan, Update, BHD, AS4 resurrection AS4_roll_balance2.pngAS4_magnet_height2.pngFreeSwingingSpectra.pdf
Entry  Wed Jan 19 14:41:23 2022, Koji, Update, BHD, Suspension Status 
    Reply  Wed Jan 19 16:22:48 2022, Anchal, Update, BHD, PR2 transmission calculation updated PR2transmissionSelectionAnalysis.pdfPR2_Trans_Calc.ipynb.zip
    Reply  Wed Jan 19 18:15:34 2022, Yehonathan, Update, BHD, AS1 resurrection AS1_roll_balance2.pngAS1_magnet_heigh2.pngFreeSwingingSpectra.pdfIMG_6324.JPG