40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 337 of 341  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Mon Jun 11 22:05:03 2018, Koji, Update, elog, Comparison of the analytical and finesse values of TMS and FSR. 
    Reply  Mon Jun 11 22:18:18 2018, keerthana, Update, elog, Comparison of the analytical and finesse values of TMS and FSR. 
Entry  Wed Jun 13 11:59:03 2018, keerthana, Update, elog, command line enabled code for frequency scanning 
Entry  Thu Jun 21 13:24:00 2018, keerthana, Update, elog, The cavity scan data of June 20 AS110_Beat.pdfYEND_Beat.pdf
Entry  Thu Jul 5 17:33:36 2018, keerthana, sandrine, Update, elog, Lights not working 
Entry  Thu Jul 5 17:58:04 2018, keerthana, sandrine, Update, elog,  setup1.jpgsetup2.jpg
Entry  Thu Jul 12 14:06:39 2018, keerthana, Update, elog, Finesse and Analytical solution - Comparison finesse_cavity.pngAnalytical1.pdfFinesse_Analytical.pdfDifference.pdf
Entry  Fri Dec 7 19:42:47 2018, rana, Frogs, elog, can't upgrade DokuWiki because of PHP / SL7 
Entry  Fri Mar 13 12:48:47 2020, Larry Wallace, Update, elog, Cert Renewal 
Entry  Fri Apr 16 11:31:00 2021, rana, Update, elog, elog stuck ~10 AM today 
    Reply  Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed  ETMYoptable.jpgsurgtubclamps.jpgquickrelease.jpgreinforcbridge.jpg
    Reply  Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYopl.jpg
    Reply  Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev ETMYoplev.jpg
    Reply  Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev 
    Reply  Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation 
Entry  Tue Jun 4 10:44:13 2013, Steve, Update, endtable upgrade, PI pzt holders are ready PIpztholders.jpg
    Reply  Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection thinwallconnector.jpg06061301.PDF
Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
    Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
    Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
Entry  Thu Jul 11 09:15:10 2013, Steve, Update, endtable upgrade, ETMY optable grounded 
    Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
    Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
    Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
    Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
    Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
    Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
    Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
    Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
    Reply  Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified AI_Board_Output.jpg
    Reply  Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount PZT_out_waveform.jpg
    Reply  Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  Piezo-mirror_2.JPG
    Reply  Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT QPD-XCalib.pdfQPD-YCalib.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Pitch_tilt.pdfPiezo_Yaw_Calib-in_QPD_linear_range-Yaw_tilt.pdf
Entry  Mon Jul 22 17:17:30 2013, annalisa, Update, endtable upgrade, End table picture YendTable.jpg
    Reply  Tue Jul 23 00:51:46 2013, Koji, Update, endtable upgrade, End table picture P7224222.JPGP7224223.JPGP7224224.JPGP7224238.JPG
    Reply  Tue Jul 23 19:37:08 2013, Annalisa, Update, endtable upgrade, End table picture IMG950073.jpgIMG950072.jpg
    Reply  Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf
Entry  Sun Jul 28 19:39:04 2013, Annalisa, Update, endtable upgrade, Picture 
    Reply  Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes D980323-C-modified.pdfD980323-C-modified-pg2.pdf
    Reply  Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9 
    Reply  Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested 
    Reply  Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted  
    Reply  Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable 2-inch-CVI-Yawcalib.pdf2-inch-CVI-Pitchcalib.pdf1-inch-Laseroptik-Yawcalib.pdf1-inch-Laseroptik-Pitchcalib.pdf
Entry  Mon Dec 9 11:44:08 2013, Steve, Update, endtable upgrade, ETMY optable got new beam dump ETMYoptBefore.jpgETMYoptAfter.jpg
    Reply  Mon May 12 14:42:25 2014, steve, Update, endtable upgrade, optical table enclosure wall proposal and table at ETMY Hilite70.jpgETMY-ISCT.jpgRoscoThermashield.pdf
    Reply  Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMY-Nfeedt.jpg
    Reply  Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough ETMYsFeedt.jpg
    Reply  Thu Sep 17 02:22:53 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough 
    Reply  Tue Dec 22 16:39:42 2015, Steve, Update, endtable upgrade, ETMY optical table enclosure IMG_0028.JPGIMG_0027.JPGETMY-ISCT_EISOL.jpg
ELOG V3.1.3-