40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 337 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categoryup Subject Text Attachments
  3141   Wed Jun 30 00:45:26 2010 ranaUpdateVACslow pumpdown stopped for the nightAs per Steve's instructions, at 12:43 AM,
I used the following steps to stop the pumpdown
until the morning:
  
  3148   Wed Jun 30 15:24:04 2010 steve,kiwamuUpdateVACslow pumpdown copmlete


   
        
            
 slowpd.jpgbutterfly.JPG 
  3152   Thu Jul 1 10:26:34 2010 steveConfigurationVACpd68 at vacuum normal stateSlow pump down _pd68 has reached the vacuum
normal state.  CC4_Rga region is pumped
now. The RGA is still off.
 pd68slow2d.jpgpem134d.jpg 
  3248   Tue Jul 20 08:04:31 2010 steveConfigurationVACslow vent has startedThe PSL shutter was closed. The beam path 
blocked two places. High voltage power supplies
to IOO and OMC PZT were checked to be off.
  
  3254   Tue Jul 20 23:52:36 2010 kiwamuUpdateVACupdate: slow vent has startedThe
vent is still going on. At this moment the
pressure inside of the chambers is about
 untitled.png 
  3259   Wed Jul 21 12:41:31 2010 kiwamuUpdateVACvent finishedThe vent
has been finished successfully in this morning.
  
  3266   Thu Jul 22 08:07:27 2010 steveUpdateVACvent finished

    
        
 30hvent.jpg 
  3331   Fri Jul 30 09:55:34 2010 steveConfigurationVACslow pumpdown has startedBob and Steve closed BS chamber with the
help of the manual Genie lift and the pump
down started. The PSL shutter was closed
 slowpd5hr.jpg 
  3336   Fri Jul 30 17:54:55 2010 steveHowToVACHow to stop and start slow pumpdown


   
        
            
  
  3338   Fri Jul 30 22:07:42 2010 KojiHowToVACHow to stop and start slow pumpdownKiwamu and Koji
The rough pumping was stopped at
230mmTorr. We are going to resume the pumping
  
  3340   Sat Jul 31 10:12:05 2010 kiwamuUpdateVACRe: How to stop and start slow pumpdownI resumed the pumping down. It started
from 9:55 am.
  
  3341   Sat Jul 31 14:59:33 2010 kiwamuUpdateVACRe: How to stop and start slow pumpdownI stopped the pumping at 14:50 pm
because I was going back home. I did the
  
  3343   Sat Jul 31 22:35:01 2010 KojiUpdateVACVac-P1 still 1.2mtorrI resumed the pumping from 19:00.
Now the valve RV1 is full open. But
the pumping is really slow as we are using
  
  3344   Sun Aug 1 18:50:35 2010 KojiUpdateVACP1 = 0.48 torrI resumed the pumping today. Now the pressure
is 0.48 torr. The pump was stopped.

  
  3347   Mon Aug 2 10:26:15 2010 steveConfigurationVACvery slow pumpdown completed


   
        
            
 veryslowpd.jpg 
  3611   Mon Sep 27 08:59:50 2010 steveConfigurationVACslow vent has startedBlocked PSL output beam  into IFO
Checked: HV at IOO & OMC are
off, jam nuts in position,
  
  3614   Tue Sep 28 00:07:45 2010 kiwamuConfigurationVACRe: slow vent has started(Koji, Yuta, Kiwamu)
 P1_history_100927.png 
  3622   Wed Sep 29 16:56:36 2010 yutaUpdateVAC2 doors opened(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday,
  
  3645   Mon Oct 4 19:48:00 2010 yutaUpdateVACseveral mirrors installed to ITMX/BS chamber(Koji, Kiwamu, Yuta)
Lots of progress
 P1060901.JPGP1060904.JPG 
  3654   Tue Oct 5 17:39:21 2010 steveConfigurationVACwest access connector removedKiwamu, Koji, Yutah, Rana, Jan and Steve
We removed the west access connector
this afternoon.
  
  3656   Tue Oct 5 21:22:46 2010 yutaUpdateVACgreen beam reached PSL tableY  IMG_3627.jpg 
  3925   Mon Nov 15 16:09:44 2010 JenneUpdateVACETMX, ETMY, ITMY chambers opened[Steve, Jenne, Suresh, Koji]
The remaining test mass chambers
have been opened, and have light doors in
  
  4059   Wed Dec 15 16:04:49 2010 steveConfigurationVACvacuum valves found in default conditionThis condition is created when we run out
of nitrogen that holds the valves in set
positions. The Maglev and other turbos are
  
  4083   Tue Dec 21 16:20:09 2010 steveConfigurationVACpumpdown has startedSlow pumpdown of   
  4084   Tue Dec 21 16:34:42 2010 kiwamuSummaryVACAll the test masses have been wiped [Jenne and Kiwamu]
 We wiped all the test masses with
  
  4088   Wed Dec 22 15:47:22 2010 KojiUpdateVACTank closing procedure[Jenne Kiwamu Joe Osamu Steve Koji]
Yesterday (21st), we closed the BSC
and the four testmass chambers.
  
  4089   Wed Dec 22 17:24:50 2010 steveConfigurationVACslow pumpdown at 12 hoursWe have reached 200 Torr at 12 hours of
slow pumping speed. Kiwamu stopped the pumping
for 11 hrs last night .and I restarted it
 slowpd12h.jpg 
  4090   Wed Dec 22 21:38:47 2010 kiwamuConfigurationVACRe:slow pumpdown at 12 hoursI stopped the pumping at 9:30 pm. Now
we are at 29 torr.

  
  4094   Thu Dec 23 13:30:09 2010 steveConfigurationVACslow pumpdown completeThe pump down continued this morning by
the removal of the butterfly valve. Two roughing
pumps were used to reach 500 mTorr
 slow2dpd.jpg 
  4133   Tue Jan 11 11:39:45 2011 steveUpdateVACRGA is turned onJoe updated the rga procedure in the wiki
and we turned on the filament. It will take
a few days to reach thermal equilibrium.
 pd70d22.jpg 
  4233   Mon Jan 31 16:12:11 2011 steveUpdateVACVertex crane upgrade shorth coming


   
        
            
 P1070364.JPGP1070358.JPG 
  4273   Fri Feb 11 09:27:03 2011 steveConfigurationVACRGA scanThe RGA scan is normal at day 52 of this
pump down.
Light power BS 1064nm ~25mW, ETMX
 rgascan20110211.jpgpressurepd70.jpg 
  4391   Wed Mar 9 17:29:11 2011 steveSummaryVACsingle O-ring protectionWe have one single O-ring on the 40m vacuum
envelope. It is on the OOC west side, facing
the AP table. This O-ring has to be protected
 so1.jpgP1070458.JPG 
  4654   Fri May 6 15:59:40 2011 steveUpdateVACTP3 fore pump replacedDry fore pump of TP3 replaced by brand
new Varian SH-110  at  1.1 Torr_75,208
hrs
  
  5016   Fri Jul 22 10:13:41 2011 steveUpdateVACRGA scan at day 213   pd70m213scan.jpg 
  5017   Fri Jul 22 10:24:34 2011 steveUpdateVACpressure plot at day 213Dec 21, 2010 we pumped down the MARK4 rebuilt
40m-IFO and the malev has been pumping on
it since than
 p.jpg 
  5047   Wed Jul 27 15:38:01 2011 steveUpdateVACbeam traps for vacuumWe have cleaned, baked, rga scaned traps
for vacuum. Thorlabs LB1 on 1" OD ss
posts and forks. The effective surface area
 P1080095.JPG 
  5080   Mon Aug 1 08:52:37 2011 steveUpdateVACpreparation to ventBoth arms locked easely around 1V transmited. 
We should recenter oplevs.
 pztsteering.pngvac1Aug2011.pngPEM200d.jpg 
  5104   Wed Aug 3 09:40:13 2011 steveUpdateVACventThe vacuum system is coming up to atm.
The vent was started with slow N2 flow. The
PSL output is blocked 2 places on the table.
 pzt2011Aug3.png 
  5105   Wed Aug 3 11:34:59 2011 kiwamuUpdateVACRe: ventAn
important rule during the in-vac work :
  
  5111   Wed Aug 3 16:18:30 2011 steveUpdateVACvent is almost finishedP1 at 750 Torr,  Vent valve VV1 is
left open to atm. It will reach equilibrium
in an hour. The PSL power is not turned down
 vent8h.jpg 
  5142   Mon Aug 8 15:52:39 2011 steveUpdateVACback ground rga scanThe RGA region is beeing monitored during
the vent. This will tell us how clean the
RGA itself is.
 bg-d5.jpgpresBg-d5.jpg 
  5159   Tue Aug 9 16:54:47 2011 steveUpdateVACscratch on vac doorJenne found a big scratch on the north
vac door of ITMY. Fortunately it does not
reach the inner annulos 0 -ring seal.
 P1080152.JPG 
  5180   Wed Aug 10 22:47:22 2011 ranaSummaryVACVacuum Workstation (linux3) re-activatedFor some reason the workstation at the
vac rack was off and unplugged. Nicole and
I plugged its power back in to the EX rack.
  
  5276   Mon Aug 22 11:40:08 2011 steveUpdateVACcranes checkedCranes are  checked and they are ready
for lifting. At the east end will use the
manual Genei-lift to put door on.
  
  5289   Tue Aug 23 16:23:33 2011 JenneUpdateVACAccess connector in place[Steve, Bob, Jamie, Kiwamu, Valera, Jenne]
The access connector is now in place,
in preparation for pump-down.  Tomorrow
  
  5303   Thu Aug 25 17:14:49 2011 steveUpdateVACclean room fashion changesJamie is modeling our next generation 
in-vac
& clean room bonny suit  that Jenne
 P1080185.JPGP1080183.JPG 
  5331   Thu Sep 1 11:03:22 2011 steveUpdateVACback ground rga scanThe RGA back ground at day 29 of this vent.  v70-bg-d29scan.jpgvent70tempres.jpg 
  5354   Wed Sep 7 00:47:51 2011 JenneUpdateVACPUMP is a GO!Steve and Jamie:  After Jamie checks
the ITM free swingings, 
  
  5357   Wed Sep 7 12:03:49 2011 steveUpdateVACPump down has startedJamie and Steve
We closed ITMX and ITMY chambers
and started pumping around 11am
  
ELOG V3.1.3-