40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 337 of 341  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
   +  Reply  Sun Jun 24 23:42:31 2012, yuta, Update, Computer Scripts / Programs, PMC locker 
Entry  Mon Jun 25 15:07:49 2012, yuta, Update, IOO, MC beam spot trend MCdecenter.png
Entry  Mon Jun 25 17:48:27 2012, yuta, Update, Computer Scripts / Programs, script for finding IR resonance using ALS findIRresonance20120625.png
   +  Reply  Tue Jun 26 00:52:18 2012, yuta, Update, Computer Scripts / Programs, PMC locker 
Entry  Tue Jun 26 01:30:13 2012, yuta, Summary, Green Locking, simultaneous hold and release of the arm (aka two arm ALS) ALSboth20120625_2withAS.png
Entry  Tue Jun 26 22:37:43 2012, yuta, Update, IOO, energized OMC stages 
   +  Reply  Wed Jun 27 03:43:52 2012, yuta, Summary, IOO, how to improve mode matching to arms modematchMCtoARM_design.pngmodematchMCtoARM_MMT1MMT2longer.png
Entry  Wed Jun 27 16:23:12 2012, yuta, Update, IOO, AS and REFL on AP table aligned 
   +  Reply  Wed Jun 27 23:54:21 2012, yuta, Update, Computer Scripts / Programs, image capturing script AS_1024901004.bmp
Entry  Thu Jun 28 00:50:48 2012, yuta, Update, Locking, PRMI work started, commissioning plan POP_1024903948.bmpREFL_1024903929.bmpAS_1024903921.bmp
   +  Reply  Thu Jun 28 20:59:28 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
   +  Reply  Fri Jun 29 01:49:36 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
Entry  Fri Jun 29 02:17:40 2012, yuta, Update, IOO, prep for the vent - beam attenuating 
   +  Reply  Fri Jun 29 03:21:32 2012, yuta, Update, General, prep for the vent - others MEDMscreenshotswithCOW_20120629.png
Entry  Fri Jun 29 16:41:41 2012, yuta, Update, General, PRM was NOT installed backwards 
Entry  Sun Jul 1 13:20:09 2012, yuta, Update, IOO, MC in low power 
Entry  Sun Jul 1 23:48:15 2012, yuta, Summary, General, clipping at BS, my plan PR3.JPGPRM.JPG
Entry  Mon Jul 2 18:27:25 2012, yuta, Update, General, BS and ITMX chambers closed 
Entry  Tue Jul 3 20:51:06 2012, yuta, Update, IOO, MC in vacuum is back ALL_1025408289.bmp
Entry  Wed Jul 4 20:13:46 2012, yuta, Bureaucracy, Locking, PRC commissioning plan 
Entry  Wed Jul 4 21:11:53 2012, yuta, Update, Locking, FPMI in vacuum is back ALL_1025495266.pngMEDMscreenshotswithCOW_20120704.png
Entry  Thu Jul 5 01:20:58 2012, yuta, Summary, CDS, slow computers, 0x4000 for all DAQ status 
Entry  Thu Jul 5 01:34:11 2012, yuta, Update, Locking, MI with X arm ALS 
Entry  Thu Jul 5 13:38:05 2012, yuta, Summary, Locking, cavity g-factor from mode scan 
Entry  Fri Jul 6 01:39:56 2012, yuta, Update, Locking, MI + Y arm ALS succeed, but not both FPMIALStrial20120706.pngnewALSMEDMscreen.png
Entry  Fri Jul 6 02:46:03 2012, yuta, Update, Locking, Y arm ALS handing off to LSC handofftoLSC20120706.png
   +  Reply  Fri Jul 6 14:10:31 2012, yuta, Summary, LSC, calculation of FPMI using ALS 
   +  Reply  Sun Jul 8 00:27:54 2012, yuta, Summary, Locking, calibrating phase tracking mode scan data 
Entry  Sun Jul 8 19:31:53 2012, yuta, Update, Locking, characterizing LSC arm lock by ALS error signal XarmLengthspectra20120708.pngLSCPOYarmIRlockOLTF.pngYarmLengthspectra20120708.pngLSCPOXarmIRlockOLTF.png
   +  Reply  Mon Jul 9 05:02:58 2012, yuta, Update, Locking, adjusted ALS filters, current RMS ALSXarmLengthspectra20120708.pngALSXarmOLTF.pngALSYarmOLTF.pngALSYarmLengthspectra20120708.png
Entry  Mon Jul 9 05:15:46 2012, yuta, Update, Green Locking, locked MI while ALS using ASDC FPMIALStrial20120709.png
Entry  Mon Jul 9 23:18:09 2012, yuta, Update, LSC, PRMI got more stable a bit LSCMICHOLTF.pngLSCPRCLOLTF.pngALL_1025928219_PRMIlocked3.pngPRMIbeammotion20120709.png
   +  Reply  Tue Jul 10 03:16:17 2012, yuta, Update, LSC, PRMI got more stable a bit LSCMICHOLTF.pngLSCPRCLOLTF.pngPRMI20120709_2.png
   +  Reply  Tue Jul 10 17:47:55 2012, yuta, Update, SUS, PRM oplevs fixed PRMoplevpitOLTF.pngPRMoplevyawOLTF.pngPRMOplevSpectra20120710.png
Entry  Tue Jul 10 21:37:05 2012, yuta, Update, LSC, PRMI glitch study PRMIgilitch20120709.pngPRMIgilitch20120709_closer.png
Entry  Wed Jul 11 02:25:11 2012, yuta, Update, LSC, PRMI beam spot motion might be from PRM/BS motion POPDCASDC4.pngFeedback4.pngOLPITYAWandPOPDC4.pngOLPITYAWandPOPDCunlocked.png
   +  Reply  Wed Jul 11 03:53:41 2012, yuta, Update, LSC, BS 3.3 Hz motion on MI REFLDCASDCMIlocked.png
Entry  Wed Jul 11 13:36:58 2012, yuta, Update, SUS, OSEM and oplev spectra of optics OLPITYAW.pngSUSPITYAW.png
   +  Reply  Wed Jul 11 16:19:08 2012, yuta, Update, SUS, oplev servo phiology 
Entry  Thu Jul 12 02:12:42 2012, yuta, Update, SUS, BS 3.3 Hz motion BSdam.pngBSOLSUSresonantgain.png
Entry  Thu Jul 12 13:27:16 2012, yuta, Update, SUS, measured OLTFs of PRMI optics' SUSPOS PRMSUSPOSOLTF.pngBSSUSPOSOLTF.pngITMXSUSPOSOLTF.pngITMYSUSPOSOLTF.png
Entry  Thu Jul 12 23:15:34 2012, yuta, Update, LSC, PRMI LSC is making PRM motion worse PRMBSPRMIonoff.pngITMXITMYPRMIonoff.pngOplevPRMIonoff.png
Entry  Fri Jul 13 15:49:38 2012, yuta, Bureaucracy, General, 40m Priority Action Items 
   +  Reply  Mon Feb 4 19:33:19 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan 3peakdata.png
   +  Reply  Tue Feb 5 02:04:44 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan PRMPR2scan.png
   +  Reply  Tue Feb 5 10:09:08 2013, yuta, Summary, General, rough analysis of aligned PRM-PR2 mode scan 
Entry  Tue Feb 5 19:32:47 2013, yuta, Summary, General, PR2/PR3 flipping and PRC stability PRMI_PR2HR_PR3HR.pngPRMI_PR2AR_PR3HR.pngPRMI_PR2HR_PR3AR.pngPRMI_PR2AR_PR3AR.png
   +  Reply  Wed Feb 6 15:20:55 2013, yuta, Summary, General, FWHM was wrong 
   +  Reply  Thu Feb 7 10:35:35 2013, yuta, Update, General, Store optics in respective cabinets 
   +  Reply  Thu Feb 7 19:25:22 2013, yuta, Update, CDS, C1ALS filters reloaded 
ELOG V3.1.3-