  10071   Thu Jun 19 14:12:45 2014 steveUpdatesafetyoptical table scans

 

 PSL, AP, ETMY and ETMX optical tables were scanned for stay beam.

  10075   Thu Jun 19 17:11:52 2014 steveUpdatePEMit is warmer today

 The PSL HEPA was running at 30VAC-variac. It is 1 degree C warmer than usual. The HEPA fan motor turned up to 60 V

Attachment 1: warmertoday.png
warmertoday.png
  10081   Fri Jun 20 14:42:57 2014 steveUpdateSUSvac illuminators turned off
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework
Attachment 1: 8days.png
8days.png
  10350   Fri Aug 8 11:22:35 2014 steveSummarySUSoplev laser summary

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

  10362   Mon Aug 11 10:23:39 2014 steveSummarySUSoplev laser summary updated

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

  10518   Thu Sep 18 10:08:07 2014 steveSummarySUSoplev laser summary updated

 

Quote:

 

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

     

  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures

 

 

Attachment 1: summerheat.png
summerheat.png
  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

Quote:

 

 KroneCrane Fred inspected and certified the 3 40m cranes for 2014. The vertex crane crane was load tested at fully extended position.

 Small oil drops were found during prevent inspection of the vertex crane. They were wiped off. It took 231 days to grow this size.

Attachment 1: VertexOilDrops.jpg
VertexOilDrops.jpg
  10665   Tue Nov 4 10:40:46 2014 steveUpdatePEMlab temperatures and particle counts

 

 

Attachment 1: PEM100d.png
PEM100d.png
  10761   Mon Dec 8 09:03:49 2014 steveUpdatePEMair cond maintenance tomorrow morning

 

 AC maintenance is scheduled from 8am till 11am tomorrow morning.

  10773   Wed Dec 10 14:26:13 2014 steveUpdatePEMair cond maintenance and particle plot

Quote:

 

 AC maintenance is scheduled from 8am till 11am tomorrow morning.

 IFO air condition maintenance will continue tomorrow morning and it should be finished by 11:30AM

 We have new guys taking over this job: Sal and Chris so it takes longer. The units will be shut down for a bit.

They will not enter the IFO lab. The CES housed units will be worked on.

Attachment 1: 05.png
05.png
  11083   Fri Feb 27 10:25:24 2015 steveUpdateCamerasquad picture problem

MUX input 7 to ITMXF camera cable was replaced by temporary cable labeled as 888

The problem remains to be the same black stripe at the bottom of the image The single picture is OK.

Attachment 1: quadMUX.jpg
quadMUX.jpg
  11148   Thu Mar 19 17:11:32 2015 steveSummarySUSoplev laser summary updated

           March  19, 2015   2  new  JDSU 1103P, sn P919645 & P919639 received from Thailand through Edmond Optics. Mfg date 12/2014............as spares

  11178   Fri Mar 27 10:38:40 2015 steveUpdateVACvac rack UPS battery replaced

Batteries replaced after 3.5 years with Amstron AP-1250F2,  8x 12V 6Ah

Quote:

APC Smart -UPS 2200   model: SUA2200RM2U   batteries were replaced by compatible RBC43, 8x  12V5A

 

Attachment 1: UPSvac.jpg
UPSvac.jpg
  11227   Mon Apr 20 16:42:48 2015 steveUpdateSUSPRM and BS oplev laser replaced

The laser below is dead. JDSU 1103P, SN P845655 lived for 3.5 years.

Quote:

 

JDSU 1103P died after 4 years of service. It was replaced with new identical head of 2.9 mW output. The power supply was also changed.

The return spots of 0.04 mW  2.5 mm diameter on qpds are BS  3,700 counts and PRM 4,250 counts.

 

It was replaced by JDSU P/N 22037130,( It has a new name for 1103P Uniphase ) sn P919639 of mfg date 12-2014

Beam shape at 5 m nicely round. Output power 2.8 mW of 633 nm

BS spot size on qpd ~1 mm &  60 micro W

PRM spot size on qpd ~1 mm & 50 micro W

Attachment 1: newOplevLaser.png
newOplevLaser.png
  11792   Fri Nov 20 09:45:39 2015 steveSummarySUSoplev laser summary

 

Quote:

 

Quote:

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

 

Attachment 1: oplev_summery.png
oplev_summery.png
  12014   Tue Mar 1 09:37:15 2016 steveUpdateVACvac rack UPS batteries replaced

Amstron batteries replaced after 11 months with SP-12-5.5HR,  2 years warranty from replaceUPSbattery.com

Quote:

Batteries replaced after 3.5 years with Amstron AP-1250F2,  8x 12V 6Ah

Quote:

APC Smart -UPS 2200   model: SUA2200RM2U   batteries were replaced by compatible RBC43, 8x  12V5A

 

Note: the replace battery LED did not go out ( well pasted 24 hrs ) till the self test bottom was hold down for 2-3 sec

Attachment 1: vacRackBat.jpg
vacRackBat.jpg
  12054   Wed Mar 30 11:35:24 2016 steveUpdatesafetyBS visitor's viewport is protected with lexan

Quote:
The four horizontal viewports of arms are protected
by 3/8" thick, 8.5" OD Lexan disk of MR10 Polycarbonate.

ITMX, ETMX, ITMY and ETMY ccd cameras are not focused now.


BS visitor's viewport glass is now covered with Lexan MR10

Note:
this Lexan cover is in vertical orientation so becomes lose when the black anodized cover is removed.
It needs to be held in place

while it's housing is taken off.
  12125   Mon May 23 10:55:49 2016 steveSummarySUSITMX oplev laser replaced

 

      May 23, 2016             ITMX dead He/Ne laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output  2.6 mW, nicely round beam quality at 15 meters.

                                                                                                                                                    Power just before viewport 1 mW,  returning light on qpd 154 microW =  7,500 counts

 

Attachment 1: ITMXoplev.png
ITMXoplev.png
  12126   Mon May 23 15:51:32 2016 steveSummarySUSoplev laser summary updated

 

Quote:

 

Quote:

 

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

     

           May 23, 2016             ITMX dead laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output output  2.6 mW, nicely round beam quality at 15 meters.

Attachment 1: oplSum.png
oplSum.png
  12341   Wed Jul 27 11:40:48 2016 steveSummarySUSoplev laser summary updated

 

Quote:

 

Quote:

 

Quote:

 

Quote:

 

                  2005              ALL oplev servos use Coherent DIODE LASERS # 31-0425-000, 670 nm, 1 mW

    Sep. 28, 2006              optical lever noise budget with DC readout in 40m,  LIGO- T060234-00-R, Reinecke & Rana

    May  22, 2007              BS, SRM & PRM  He Ne 1103P takes over from diode

    May  29, 2007              low RIN He Ne JDSU 1103P selected, 5 purchased sn: T8078254, T8078256, T8078257, T8078258 & T8077178 in Sep. 2007

    Nov  30, 2007               Uniphase 1103P divergence measured

    Nov. 30, 2007               ETMX old Uniphase 1103P  from 2002 dies: .............., running time not known......~3-5 years?

    May 19, 2008               ETMY old Uniphase 1103P from 1999 dies;.....................running time not known.....~    ?

    Oct.  2, 2008                ITMX & ITMY are still diodes, meaning others are converted to 1103P earlier

 

                     JDSU 1103P were replaced as follows:

   May 11, 2011                ETMX replaced, life time 1,258 days  or 3.4 years

   May 13, 2014               ETMX , LT 1,098 days or 3 y

   May 22, 2012               ETMY,  LT 1,464 days or  4 y

   Oct.  5, 2011                BS & PRM, LT 4 years,  laser in place at 1,037 days or 2.8 y

   Sep. 13, 2011               ITMY  old 1103P &    SRM    diode laser replaced by 1125P  ..........old He life time is not known, 1125P in place 1,059 days or 2.9 y

   June 26, 2013              ITMX 622 days or 1.7 y    note: we changed because of beam quality.........................laser in place 420 days or 1.2 y

 

  Sep. 27, 2013               purchased 3 JDSU 1103P lasers, sn: P893516, P893518, P893519 ......2 spares ( also 2 spares of 1125P of 5 mW & larger body )

 

      May  13, 2014             ETMX,  .............laser in place 90 d

      May  22, 2012             ETMY, 

     Oct.  7,  2013             ETMY,  LT  503 d  or  1.4 y............bad beam quality ?

     Aug. 8,  2014              ETMY,  .............laser in place   425 days  or  1.2 y

 

      Sept. 5, 2014              new 1103P, sn P893516  installed at SP table for aLIGO oplev use qualification

     

           May 23, 2016             ITMX dead laser sn P845648 replaced after 1062 days [2.9 yrs] by 1103P, sn P859884, with output output  2.6 mW, nicely round beam quality at 15 meters.

               July 27, 2016             2  new 1103P from Edmonds in: P947034 & P947039, manf. date April 2016,

  12498   Fri Sep 16 14:15:28 2016 steveUpdatePEMpartical counts

South end flow bench and both clean room assembly flow benches measured zero counts for 0.3 and 0.5 micron size particales.

The counting efficiency of 0.5 micron is 100%

 

  location

 

 

        0.3 micron particles / cf min

 

 

      0.5 micron particles / cf min

 

 

 counter

 MET

 ONE

 

       effect
 ITMY table  35,000  3,000   #3  
 ETMY table  35,000  3,000   #3  
 ITMX table  24,000  2,400   #3  PSL HEPA at 50V
 ITMX wall mounted  -  2,500   #1  
 ETMX work bench    5,000     600   #3   flow bench on  

 

The PSL HEPA performance was measured at the center of the table with MET ONE #3

 Voltage Variac particles /cf min   particles /cf min
 particle size  0.3 micron  0.5 micron
 60  0  0
 50  10  0
 40  1,400  110
 20  1,400  100
Attachment 1: 80days.png
80days.png
  12553   Wed Oct 12 15:01:22 2016 steveUpdateSUSSOS ITM baffles plates are ready

The two 40 mm apeture baffles at the ends were replaced by 50 mm one. ITM baffles with 50 mm apeture are baked ready for installation.

Quote:

 Green welding glass 7" x 9"   shade #14 with 40 mm hole and mounting fixtures are ready to reduce scatter light on SOS

PEEK 450CA shims and U-shaped clips  will keep these plates damped.

 

 

Attachment 1: baffle7x9_1.5.jpg
baffle7x9_1.5.jpg
Attachment 2: baffle_holder.jpg
baffle_holder.jpg
Attachment 3: baffle_top_view.jpg
baffle_top_view.jpg
  12656   Fri Dec 2 10:57:08 2016 steveUpdatePEM door seal replaced

The south end door leaky weather seals replaced.

The aim is here to get some overpressure inside / outside so the lab partical count would not depend on outside condition.

 

Attachment 1: 1_year_PEM.png
1_year_PEM.png
  12753   Wed Jan 25 10:46:58 2017 steveSummarySUSoplev laser summary updated

                    Oct.  5, 2015              ETMY He/Ne replaced by 1103P, sr P919645,  made Dec 2014, after 2 years

                   Jan. 24, 2017              ETMY He/Ne replaced by 1103P,  sr P947049,  made Apr 2016,  after 477 hrs running hot

Attachment 1: oplev_sums.png
oplev_sums.png
  12811   Wed Feb 8 10:16:39 2017 steveUpdateSUSclipping ITMX oplev

The ITMX oplev beam is clipping. It will be corected with locked arm

 

Attachment 1: ITMX_oplev_clipping.jpg
ITMX_oplev_clipping.jpg
Attachment 2: ITMX_clipping.jpg
ITMX_clipping.jpg
  12836   Fri Feb 17 10:56:12 2017 steveUpdatePEMparticle counter moved into PSL enclousure

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

Attachment 1: from_here.jpg
from_here.jpg
Attachment 2: to_here.jpg
to_here.jpg
Attachment 3: PSL_particles.png
PSL_particles.png
  12841   Tue Feb 21 10:08:35 2017 steveUpdatePEMnoisy morning

Our new janitor Francisco is started working in IFO room today.

Quote:

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

Large film crews are working just out side  the north west corner of the lab. They started around ~ 5:30am  Do not plan on working late tonight.

ETMX sus damping restored.

C1:PSL-FSS_RMTEMP, C1:PSL-PMC_PMCTRANSPD and C1:PEM-count_temp channels are not reading since Friday

 

Attachment 1: outside_activity.png
outside_activity.png
  12844   Wed Feb 22 08:54:17 2017 steveUpdatePEM PSL enclousure particle count

ETMX sus damping recovered.  PSL enclousure is dusty at 20V rotation speed. Rainy days as outside condition.

Quote:

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

 

Attachment 1: dusty__PSL.png
dusty__PSL.png
  12855   Tue Feb 28 08:04:48 2017 steveUpdatePEMETMX damping recovered

ETMX sus damping recovered.

Note: The giant metal garbage container was moved from the south west corner of CES months ago.

Quote:

ETMX sus damping recovered.  PSL enclousure is dusty at 20V rotation speed. Rainy days as outside condition.

 

 

Attachment 1: ETMX.png
ETMX.png
  12895   Mon Mar 20 17:12:08 2017 steveUpdatePEMparticle counter inside of PSL enclousure

The logging script is multiplying by 100 instead of 10 !

Quote:

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

 

Attachment 1: enclousure_partical_count.png
enclousure_partical_count.png
  13181   Thu Aug 10 09:10:55 2017 steveUpdateGeneraldataviewer is recovering

It can look back 7 days trends now. There is still no vacuum channels. I can bring back the channels through the restore directory, but there are no data.

Attachment 1: 7dm.png
7dm.png
  13261   Mon Aug 28 10:51:21 2017 steveUpdateSUSETMX damping recovered
Attachment 1: ETMX_restored.png
ETMX_restored.png
  13695   Wed Mar 21 10:00:35 2018 steveUpdateGeneralprojector light bulb replaced

Light bulb replaced.

Quote:

Bulb went out ~10am today. Looks like the lifetime of this bulb was <100 days.

Steve: bulb is arriving next week

 

  13861   Fri May 18 07:41:01 2018 steveUpdateSUSclipping ITMX oplev

The ITMX oplev still clipping

Quote:

The ITMX oplev beam is clipping. It will be corected with locked arm

 

 

  14048   Tue Jul 10 14:20:09 2018 steveUpdateGeneralprojector light bulb replaced

Bulb replaced at day 110  We have now spare now.

 

  4963   Tue Jul 12 17:30:24 2011 steve,UpdateSUSBS oplev spectra

Quote:

Healthy BS oplev

 I repeated the BS oplev spectrum today and I do not understand why it does look different. I did it as Kiwamu describes it in entry#4948  The oplev servo was left ON!

Attachment 1: BS_oplev.jpg
BS_oplev.jpg
  4966   Thu Jul 14 09:38:50 2011 steve,UpdateSUSBS oplev spectra

Quote:

Quote:

Healthy BS oplev

 I repeated the BS oplev spectrum today and I do not understand why it does look different. I did it as Kiwamu describes it in entry#4948  The oplev servo was left ON!

 It is working today! Finally I repeated the BS spectra, that we did with Kiwamu last week

Attachment 1: BS_oplev.jpg
BS_oplev.jpg
  4967   Thu Jul 14 15:27:08 2011 steve,UpdateSUSSUS oplev spectras

Quote:

Quote:

Quote:

Healthy BS oplev

 I repeated the BS oplev spectrum today and I do not understand why it does look different. I did it as Kiwamu describes it in entry#4948  The oplev servo was left ON!

 It is working today! Finally I repeated the BS spectra, that we did with Kiwamu last week

 The optical levers were centered during these measurements  without the reference of locked cavities.  They have no reference value now.

SRM sus need some help. ITMX is showing pitch/yaw modes of the pendulum .....OSEM damping is weak?

Attachment 1: BS_oplev.jpg
BS_oplev.jpg
Attachment 2: PRM_oplev.jpg
PRM_oplev.jpg
Attachment 3: ITMX_oplev.jpg
ITMX_oplev.jpg
Attachment 4: ETMX_oplev.jpg
ETMX_oplev.jpg
Attachment 5: ETMY_oplev.jpg
ETMY_oplev.jpg
Attachment 6: SRM_oplev.jpg
SRM_oplev.jpg
Attachment 7: ITMY_oplev_b.jpg
ITMY_oplev_b.jpg
  1964   Thu Sep 3 10:19:35 2009 steve, albertoUpdatePEMparticle counts and burning hillsides

The San Gabriel mountain has been on fire for  6 days. 144,000 acres of beautiful hillsides burned down and it's still burning.  Where the fires are.

The 40m lab particle counts are more effected by next door building-gardening activity than the fire itself.

This 100 days plot shows that.

Attachment 1: fire6d.jpg
fire6d.jpg
Attachment 2: 40mgarden.JPG
40mgarden.JPG
Attachment 3: 40mgarden2.JPG
40mgarden2.JPG
Attachment 4: RBLOG-FIRE-SKY.JPG
RBLOG-FIRE-SKY.JPG
  4947   Wed Jul 6 16:44:37 2011 steve, kiwamuUpdateSUSBS oplev spectra

Healthy BS oplev

Attachment 1: BS.jpg
BS.jpg
  5590   Fri Sep 30 18:35:42 2011 steve, kiwamuUpdateVACvacuum set for poweroutage

We did the following:

1, closed V1, VM1,  annuloses: VASE, VASV, VABS, VAEV,  VAEE and VA6

2, stop rotation of Maglev-TP1, waited to decellerate and turned off power to it

3, closed V4,  stoped rotation of TP2, waited to decellerate and turned power off

4, opened VM3 to RGA that is still running

 

I will come in tomorrow 9-10am to restart pumping.

Attachment 1: prepforpoweroutage.png
prepforpoweroutage.png
  3138   Tue Jun 29 17:10:49 2010 steve, ranaUpdateVACslow pumpdown started

The folding crane was fixed and tested this morning by the NNN rigging company. Pictures will be posted by Steve in the morning.

Afterwards, the ITM-east door was installed, jam-nuts checked. No high voltage was on for the in-vac PZTs.

The annulus spaces were roughed down to 350mTorr by Roughing Pump RP1. For this operation, we removed the low flow valve from the RP1 line.

After the spaces came down to ~400 mTorr, we closed their individual valves.

Warning: The VABSSC1 and VABSSC0 valves are incorrect and misleadingly drawn on the Vacuum overview screen.

We then:

  1. Closed V6 (valve between RP1 and the annulus line).
  2. Turned off RP1 from the MEDM screen.
  3. Installed the soft -starting butterfly valve.
  4. Turned on RP1.
  5. Opened V3.
  6. Closed VV1 (at the last minute - this is a vent valve and must be checked before each pumpdown)
  7. and pumpdown was started with a 3/4 turn opening of manual valve RV1.

Our idea is to have a much slower pumpdown this time than the last time when we had a hurricane kick up the dust. Looks like it worked, but next time we should do only 1/2 turn.

  3140   Tue Jun 29 23:49:18 2010 steve, ranaUpdateVACslow pumpdown started

Untitled.png

The pumpdown started at 4 PM (2300 UTC). At 10 PM, we (Jenne, Jan, and I) opened up the RV1 valve to full open. That's the second inflection point in the plot.

  3169   Wed Jul 7 17:05:30 2010 steve, ranaUpdateSAFETYSummary of Crane Damage/Malfunction

The 1 Ton yellow crane support beam jammed up at Friday morning, June 25.

 

The 40m vertex crane has a folding I-beam support to reach targeted areas. The rotating I-beam is 8 ft long. The folding extension arm gives you another 4 ft.

The 12 ft full reach can be achieved by a straightening of the 4 ft piece. There is a spring loaded latch on the top of the I-beam that locks down when the two I-beams align.

This lock joins the two beams into one rigid support beam for the jib trolley to travel.  The position of this latch is visible when standing below, albeit not very well.

To be safe it is essential that this latch is locked down fully before a load is put on the crane.

 

We were preparing to pump down the 40m vacuum system on Friday morning. The straight alignment of the 8 and 4 ft piece made us believe that

the support beams were locked. In reality, the latch was not locked down. The jib trolley was driven to the end of the 12 ft I-beam. The 200 lbs ITM-east door was lifted

when the 4 ft section folded 50 degrees around the pivot point. This load of door + jib-trolley + 4 ft I-beam made the support beam sag about 6 inches

The door was removed from the jib hoist with the blue Genie-lift. The sagging was reduced to ~3".

 

The Genie-lift platform was raised to support the sagging crane jib-trolley. The lab was closed off to ensure safety and experts were called in for consultation. It was decided to bring in professional riggers.

 

Halbert Brothers, Inc. rigging contractor came to the lab Tuesday morning to fix the crane. The job was to unload the I-beam with safety support below. They did a very good job.

 

The static deformation of I-beams sprung back to normal position. There are some deformation of the I-beam ~2 mm where the beams were jammed under load.

It is not clear if this is a new deformation or if the crane sections have always been mis-aligned by a couple of mm.

 

The crane was tested with 450 lbs load at 12 ft horizontal travel position. The folding of I-beams were repeatedly tested for safe operation. Its a 1 ton crane, but we tested it with 450 lbs because that's what we had on hand.

 

We're working on the safety upgrade of this lift to prevent similar accident from happening.

Pictures below:

Atm 1)   load testing 2007

Atm 2)   jammed-sagging under ~400 lbs, horizontal          

Atm.3)   jammed-folded 50 degrees, vertical     

Atm.4)   static deformation of I-beams

Atm.5)   unloading in progress with the help of two A-frames          

Atm.6)   it is unloaded

Atm.7-8) load testing        

Atm.9)   latch locked down for safe operation            

Atm.9)   zoom in of the crane sections misalignment    

Attachment 1: DSC_0026_00.JPG
DSC_0026_00.JPG
Attachment 2: P1060408.JPG
P1060408.JPG
Attachment 3: P1060415.JPG
P1060415.JPG
Attachment 4: P1060413.JPG
P1060413.JPG
Attachment 5: P1060421.JPG
P1060421.JPG
Attachment 6: P1060423.JPG
P1060423.JPG
Attachment 7: P1060441.JPG
P1060441.JPG
Attachment 8: P1060436.JPG
P1060436.JPG
Attachment 9: P1060425.JPG
P1060425.JPG
Attachment 10: P1060432.JPG
P1060432.JPG
  1857   Fri Aug 7 16:11:11 2009 steve, robConfigurationVACIFO pressure rose to 2.3 mTorr

Quote:

IFO pressure was 2.3 mTorr this morning,

The Maglev's foreline valve  V4 was closed so P2 rose to 4 Torr. The Maglev was running fine with V1 open.

This is a good example for V1 to be closed by interlock, because at 4 Torr foreline pressure the compression ratio for hydrocarbones goes down.

V4 was closed by interlock when TP2 lost it's drypump. The drypump's AC plug was lose.

To DO: set up  interlock  to close V1 if P2 exceeds 1 Torr

 

 

 

We added C1:Vac-CC1_pressure to the alarm handler, with the minor alarm at 5e-6 torr and the major alarm at 1e-5 torr.

  4301   Tue Feb 15 11:57:06 2011 steve, valeraConfigurationPSLPMC swap

 We swapped the PMC s/n 2677 for s/n lho006.

The table below summarizes the power levels before and after the PMC swap.

  old new
Ptrans 1.32 W 1.42 W
Transmission 85 % 91.5 %
Refl PDDC locked/unlocked 5.0 %  4.3 %
Loss 7-8 % 2-3 %
Leakage out of the back 10 mW 0.3 mW

 

- The power into the PMC (1.67 W) was measured with Scietech bolometer before the first steering PMC mirror. The leakage through the steering mirrors was measured with Ophir power meter to be 12+8 mW. There is also a lens between the mirrors which was not measured. 

- The power through the PMC was measured after the doubler pick off (105 mW), steering mirror (4 mW), and lens (not measured).

- The estimated reflection from four lens surfaces is 1-2% hence 1% uncertainty in the losses in the table.

- The beams into the PMC and on REFL PD were realigned. The beams downstream of the PMC are blocked as we did not realigned the PMC and doubler paths.

- The trans PD ND filters were removed. The VDC=1.28 V now.

- The NPRO current is 2.102 A

 

Atm 1 old

Atm2  new

Attachment 1: P1070421.JPG
P1070421.JPG
Attachment 2: P1070423.JPG
P1070423.JPG
  3148   Wed Jun 30 15:24:04 2010 steve,kiwamuUpdateVACslow pumpdown copmlete

Quote:

Untitled.png

The pumpdown started at 4 PM (2300 UTC). At 10 PM, we (Jenne, Jan, and I) opened up the RV1 valve to full open. That's the second inflection point in the plot.

 Atm 2 is showing the butterfly valve that closes down down the orifice at higher pressure to slow down the pumping speed.

 See elog entry #2573

 

Attachment 1: slowpd.jpg
slowpd.jpg
Attachment 2: butterfly.JPG
butterfly.JPG
  539   Wed Jun 18 16:37:54 2008 steve,ranaUpdateSAFETYCO2 test in the east arm
The CO2 laser and table are in the east arm for characterization of the mechanics. We
will not be operating it until we have an SOP (which is being written). No worries.
Attachment 1: co2.png