40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 337 of 355  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  5159   Tue Aug 9 16:54:47 2011 steveUpdateVACscratch on vac doorJenne found a big scratch on the north
vac door of ITMY. Fortunately it does not
reach the inner annulos 0 -ring seal.
 P1080152.JPG 
  5166   Wed Aug 10 07:59:33 2011 steveUpdateSUSthis is too dam nice

    

       
            
  
  5184   Thu Aug 11 08:29:28 2011 steveUpdateComputersdataviewer at RosalbaI'm having this problem with DTV every
morning at Rosalba only. It wants to start
with a negative GPS time and it can not connect
 gpsfmb.png 
  5193   Thu Aug 11 15:31:43 2011 steveUpdateGeneralmalfunctioning crane at ETMY

    

       
            
  
  5194   Thu Aug 11 16:07:37 2011 steveUpdateSUSETMY rack cables strain releived   P1080159.JPGP1080160.JPG 
  5212   Fri Aug 12 16:52:49 2011 steveUpdateGeneralChamber illuminator switchI'm looking for an ether net based 
power switch for turning lights on and off
for the vacuum system from MEDM screen. 
  
  5262   Thu Aug 18 10:59:04 2011 steveUpdateTreasurePrepared for drag wiping

    

       
            
  
  5264   Thu Aug 18 15:54:35 2011 steveUpdateSUSdamped and undamped OSEMsdamped sus at atm1 and freeswingging sus
at atm2
 
 5susLL.jpg8freeSUSLL.jpg 
  5268   Fri Aug 19 09:14:56 2011 steveUpdateIOOdegrading laser power at atmLight into the MC is 20 mW at atm, MC_Transmitted
~10 MW = 400 count
The PMC_T is OK but something else
 power@atm.jpg 
  5269   Fri Aug 19 10:26:53 2011 steveUpdateSUSOSEM sensor spectraFree swingging OSEM sensors LL at atm  8freeSUSosemSensors.jpg 
  5270   Fri Aug 19 15:31:53 2011 steveUpdateGeneralpower interruption rescheduled to 10-1-2011       
       
UTILITY
  
  5276   Mon Aug 22 11:40:08 2011 steveUpdateVACcranes checkedCranes are  checked and they are ready
for lifting. At the east end will use the
manual Genei-lift to put door on.
  
  5300   Thu Aug 25 08:12:09 2011 steveUpdateSUSETMY & ITMY wiped, replaced, vac door on


   
        
            
  
  5303   Thu Aug 25 17:14:49 2011 steveUpdateVACclean room fashion changesJamie is modeling our next generation 
in-vac
& clean room bonny suit  that Jenne
 P1080185.JPGP1080183.JPG 
  5306   Fri Aug 26 07:53:59 2011 steveUpdateSUSBroken UL magnet on ITMX

    

       
            
  
  5307   Fri Aug 26 10:45:17 2011 steveUpdateGeneral crane at ETMY is fixed

    

       
            
 P1080190.JPGP1080188.JPG 
  5309   Fri Aug 26 15:59:33 2011 steveUpdateGeneraldrawer cabinet moves inmanufacturer
info
Jamie and Shuresh moved in Jenne's
 P1080192.JPG 
  5322   Tue Aug 30 10:49:29 2011 steveUpdateSUSBS & PRM damping restoredI have restored the damping of BS and PRM.
Today is janitor day. He is shaking things
around the lab.
  
  5328   Wed Aug 31 11:37:56 2011 steveUpdateGreen Lockingshutter in place at east endUniblitz mechanical shutter installed in
the green beam path at ETMY-ISCT  The
remote control cable has not been connected.
  
  5331   Thu Sep 1 11:03:22 2011 steveUpdateVACback ground rga scanThe RGA back ground at day 29 of this vent.  v70-bg-d29scan.jpgvent70tempres.jpg 
  5332   Thu Sep 1 15:07:45 2011 steveUpdateSUSwhy ITMY is moving more ?Atm1, ITMY and the SRM are on the same
isolation stack.  So why does 
the SRM move twice as much?
 itmy_srm_etmx.jpgP8220152.JPG 
  5333   Thu Sep 1 15:59:46 2011 steveUpdateSUSlight doors on at the ITMsSuresh, Kiwamu and Steve
Heavy chamber doors replaced by light
ones at  ITMX-west and ITMY-north locations.
  
  5341   Tue Sep 6 08:05:53 2011 steveUpdateSUSITMX must be touching


   
        
            
 osemITMX.jpg 
  5355   Wed Sep 7 08:14:01 2011 steveUpdateSUSfinal OSEM checkAll fine, except ITMX_sensor_UL's 
60  counts deep hoop for an hour.
 finalcheck.jpgITMX10min.jpgfinalsum.png 
  5357   Wed Sep 7 12:03:49 2011 steveUpdateVACPump down has startedJamie and Steve
We closed ITMX and ITMY chambers
and started pumping around 11am
  
  5358   Wed Sep 7 13:28:25 2011 steveSummaryCamerasAll Camera setups a need upgrading


   
        
            
  
  5361   Wed Sep 7 18:19:37 2011 steveHowToVACstop pump down for overnight


   
        
            
  
  5365   Thu Sep 8 10:50:44 2011 steveUpdateVACpumpdown #71 comletedVacuum status:  " vacuum normal"  
CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve
 pd#71.jpgmaglevpd.jpg 
  5366   Thu Sep 8 13:20:07 2011 steveUpdatePEMvac envelope at atm for 36 daysWe tried not to open chambers above 10,000
particles of 0.5 micron cf/min
New items going in:      
 vent70.jpg 
  5395   Tue Sep 13 16:57:44 2011 steveUpdateLSCITMX oplev **

    

       
            
  
  5403   Wed Sep 14 07:51:20 2011 steveUpdateSUSPRM damping restoredThe PRM damping was restored at side sensor
var 1050
  
  5407   Wed Sep 14 15:05:52 2011 steveUpdatePEMair cond maintenance Jeff has changed our AC filters inside
the lab this morning. Now he is checking
on the main filters at CES.  He will
 ac1y.jpg 
  5415   Thu Sep 15 07:28:08 2011 steveUpdateSUSPRM damping restored


   
        
            
  
  5434   Fri Sep 16 16:07:28 2011 steveUpdateSAFETYvisitors safety trainingPaul, Mirko and Katrin visiting grad students
received the 40m basic safety training.
 P1080241.JPG 
  5497   Wed Sep 21 11:35:07 2011 steveUpdateVACRGA scanRGA scan with maglev pumping speed at day
14 of the pump down.
The larger inserted box contains
 rgascanpd71m14d.jpg 
  5529   Fri Sep 23 16:25:01 2011 steveUpdateVACvac rack UPS battery replacedAPC Smart -UPS 2200   model: SUA2200RM2U
  batteries were replaced by compatible
RBC43, 8x  12V5A
 P1080252.JPGP1080254.JPG 
  5542   Mon Sep 26 11:35:44 2011 steveUpdateCamerasarms cameras upgradedThe arm's CCD cameras were reset as picture
shows last week.
The height adjustment only works
 P1080251.JPG 
  5562   Wed Sep 28 07:36:41 2011 steveUpdateSUSITMY damping restoredITMY suspention damping restored   
  5563   Wed Sep 28 07:46:42 2011 steveUpdateSUSDsub connections at the back of 1X5 are fixed 
 I'm turning  the sus damping 
off for Dsub connection fix at  the
  
  5587   Fri Sep 30 17:01:29 2011 steveUpdateSUSETMX oplev intensity effect on noiseKiwamu and Steve,
This is one of the better oplev set
up we have. Single bounce from TM, no mirror
 ETMXoplintens.jpgP1080267.JPG 
  5599   Mon Oct 3 08:38:21 2011 steveSummaryVACRecovery from the power shutdown is completed 
I failed to start Rana's favorit
anciant desktop computer at the vac rack.
 poweroutage.jpg 
  5610   Tue Oct 4 07:51:36 2011 steveUpdateCDSc1lsc and c1sus are still down 
 c1lsc and c1sus are still down.
Only ETMX and ETMY are damped
  
  5620   Wed Oct 5 11:33:25 2011 steveUpdateSUSPRM and BS oplev laser replaced 
JDSU 1103P died after 4 years of
service. It was replaced with new identical
  
  5622   Wed Oct 5 17:08:49 2011 steveUpdateSUSBS oplev spectraKiwamu and Steve,
The He/Ne oplev shows no coherece
so relative intensity noise is not limiting
 BSoplservON2.png 
  5630   Fri Oct 7 14:04:48 2011 steveUpdateSUSHe/Ne intensity noise effect on oplevsThe SRM bounce peak 18.33 Hz. Suresh helped
me to retune filter through Foton, but we
failed to remove it.
 7x 
  5645   Mon Oct 10 16:32:18 2011 steveUpdateSUSUL sensor of ETMY is recovered I lost UL osem voltage this morning
when I was checking the actual connection
at rack ETMY
 ETMY_UL.pngETMY_OSEM_UL.pngnoisyETMY_UL.png 
  5655   Wed Oct 12 08:43:30 2011 steveUpdateSUSITMX oplev improved a bit Atm2 is before optical path adjustment.
The idea was to remove possible clipping
in vacuum.
 ITMXoplev.pngITMXoplevservo_ON.png 
  5660   Thu Oct 13 14:23:09 2011 steveUpdateSUSITMX oplev with 3 mm beam on qpd I replaced the JDSU-Uniphase 1125P
by 1103P He/Ne laser. This new laser had
2.8 mW output yesterday. It degraded to 0.5
 ITMXoplev1103p#2.pngITMXoplev.png 
  5675   Mon Oct 17 07:57:24 2011 steveUpdateSUSETMX sus damping restored    
  5680   Mon Oct 17 17:07:30 2011 steveUpdateSUSETMX oplev returning beam od 3 mm ETMX oplev had 6 mm diameter beam
on the qpd.  I relayed the beam path
with 2 lenses  to get back  3 mm
 ETMX-oplev.jpg 
ELOG V3.1.3-