  13188   Thu Aug 10 21:22:06 2017 ranaSummaryPEMtemperature sensor
Should we use the AD590 or the
AD592? They're sort of the same, but
have slightly different packages and specs.
Given
 tempsensnoise2.pdftempnoise_final.pdf 
  13190   Fri Aug 11 10:27:49 2017 KiraUpdatePEMtemperature sensorSince there seems to be little difference
between AD590 and AD592, I guess we could
just go with the AD590. The temperature noise
  
  13191   Fri Aug 11 10:48:39 2017 KiraUpdatePEMtemperature sensorQuick update: we actually have AD587KRZ
and AD592, so we could start by using that
and seeing how it works.
  
  13193   Fri Aug 11 11:56:02 2017 ranaUpdatePEMtemperature sensorMight as well order several of a few different
varieties today. Its good to have some extra
in stock; we don't always want to have
  
  13194   Fri Aug 11 12:27:25 2017 KiraUpdatePEMtemperature sensorUsed AD592CNZ and AD586 (5V output) to
create a circuit that works and is responsive
to temperature changes. At room temp, using
 IMG_20170811_121608.jpgIMG_20170811_121619.jpg 
  13202   Mon Aug 14 09:49:18 2017 KiraUpdatePEMtemperature sensorDecided to try adding in an OP amp just
to see if it would work. Added LT1012
and a 100k resistor to the circuit (I originally
 IMG_20170814_092452.jpgIMG_20170814_092513.jpg 
  13203   Mon Aug 14 12:52:33 2017 KiraUpdatePEMtemperature sensorI didn't realize that the LT1012 needed
an additional input to function. I added
in +15V and -15V to pins 7 and 4, respectively and
 IMG_20170814_121131.jpgIMG_20170814_121139.jpgIMG_20170814_121758~2.jpg 
  13210   Tue Aug 15 13:32:38 2017 KiraUpdatePEMtemperature sensorTested to make sure that even when only
the AD586 was heated that there was no change
in the reading. I did so by placing the AD586
  
  1102   Thu Oct 30 20:39:47 2008 carynConfigurationPEMtemperature sensor We attached the temperature sensor box to
the MC1/MC3 chamber with a C-clamp. We connected
the temp sensor to a 2nd box with a short
  
  6731   Thu May 31 16:19:07 2012 yutaUpdateGreen Lockingtemperature setting for PSL doubling crystalI fixed the temperature control of the
oven for the PSL doubling crystal.
The PID settings were not good, and
  
  11131   Wed Mar 11 13:54:18 2015 SteveUpdateGeneraltemporaly storage in the east armGreen glass for aLIGO OMC shield is temporarly
stored in the inside of the Y-arm.
 greenG.jpgEastArm.jpg 
  12174   Tue Jun 14 10:13:34 2016 SteveUpdateVACtemporary N2 supply lineThe drill room floor will be retiled Thursday,
June 16. Temporary nitrogen line set up will
allow emptying the hole area.
 afterN2work.png 
  4113   Wed Jan 5 16:11:17 2011 kiwamuSummaryIOOtemporary PZT connection   PZTconnection.png 
  2   Thu Oct 18 14:52:35 2007 ranaRoutineASCtest[B]test[/B]
[LINE]X-(:P;(:))
  
  12763   Fri Jan 27 17:49:41 2017 jamieUpdateCDStest of new daqd code on fb1Just FYI I'm running a test of updated
daqd code on fb1. 

fb1 has it's own fiber to the
  
  12765   Fri Jan 27 20:52:36 2017 gautamUpdateCDStest of new daqd code on fb1I'm not sure if this is related, but
since today morning, I've noticed that
the data concentrator errors have returned.
 DCerrors.png 
  12769   Sat Jan 28 12:05:57 2017 jamieUpdateCDStest of new daqd code on fb1


  
  3625   Thu Sep 30 11:07:20 2010 josephb, alexUpdateCDStest points starting to workThe centos 5.5 compiled gds code is currently
living on rosalba in the /opt/app directory
(this is local to Rosalba only).  It
  
  2306   Fri Nov 20 11:14:22 2009 josephb, alexConfigurationComputerstest points working on megatron and we may have filters with switch outputs built inAlex tooked at the channel definitions
(can be seen in tpchn_C1.par), and noticed
the rmid was 0. 
  
  13684   Thu Mar 15 17:33:56 2018 KiraUpdatePEMtest setupI have attached the setup I completed today.
The metal box contains the heater circuit
and the board for the temperature sensor
 IMG_20180315_172512.jpg 
  13691   Tue Mar 20 16:56:01 2018 KiraUpdatePEMtest setupThe MOSFET was getting pretty hot, so I
switched it out to a larger heat sink and
it's fine now. I then used a function
 IMG_20180320_154516.jpgIMG_20180320_145957.jpg 
  13692   Tue Mar 20 19:48:10 2018 gautamUpdatePEMtest setupaccording to the temp sensor readout, which
was ~-3.35V which corresponds to ~335K, the
temperature of the can is now 60
  
  13700   Fri Mar 23 12:00:20 2018 ranaUpdatePEMtest setupwe don't ever want to use our 16 kHz
real time system for such low frequency action;
its main purpose is for real-time controls,
  
  13701   Fri Mar 23 12:45:08 2018 KiraUpdatePEMtest setupI fit the data that we got from the test.
The time constant for the cooling came out
to be about 4.5 hours. The error is quite
 seis_fit.png 
  13859   Thu May 17 15:38:19 2018 KiraUpdatePEMtest setup with seismometerI've moved my setup to the actual seismometer.
I attached the temperature sensor to the
seismometer (attachment 1) with duct tape,
 IMG_20180517_144420.jpgIMG_20180517_145754.jpgIMG_20180517_151956.jpgIMG_20180517_145121.jpg 
  13864   Fri May 18 14:33:34 2018 KiraUpdatePEMtest setup with seismometerHere is the result of my test. I think
I'll leave the can on over the weekend
because there's a long period of time
 seis_temp_can_on.png 
  13871   Mon May 21 10:15:35 2018 gautamUpdatePEMtest setup with seismometerI guess it's fine for now while we
are still finalizing the setup at EX, but
we should eventually line up the seismometer
  
  13872   Mon May 21 14:17:28 2018 KiraUpdatePEMtest setup with seismometerI have attached the graph for the seismometer
temperature fluctuations over 3 days. As
we can see, there is a noticeable fluctuation
 seis-temp.png 
  13877   Tue May 22 14:49:03 2018 KiraUpdatePEMtest setup with seismometerIt appears that one of the wires was disconnected
overnight or this morning so I wasn't
able to gather data over a full 24 hour period.
 seis-temp-2.png 
  13882   Wed May 23 14:50:33 2018 KiraUpdatePEMtest setup with seismometerThis time the test went without issue.
The first attachment is the data for the
past 24 hours and the second attachment is
 seis-temp-3.pngseis-temp-full-2.png 
  3604   Fri Sep 24 00:56:35 2010 koji, taraUpdateElectronicstesting TTFSSWe
found that a transistor was broken from yesterday
spark too. We partially fixed TTFSS, and
  
  3607   Fri Sep 24 23:47:10 2010 koji, taraUpdateElectronicstesting TTFSS  Q3, a PZT2222A transistor,
on D0901846 is replaced by a GE-82. However,
the board is still not fully function.
  
  3608   Sat Sep 25 19:01:13 2010 KojiUpdateElectronicstesting TTFSSHow much current do you need for each voltages?
GE-82 was the only PNP transister
I could find in the lab. It's too old but
  
  5324   Tue Aug 30 11:42:29 2011 jamieUpdateCDStestpoint.par file found to be completely emptyThe testpoint.par file, located at /opt/rtcds/caltech/c1/target/gds/param/testpoint.par,
which tells GDS processes where to find the
various awgtpman processes, was completely
  
  6844   Thu Jun 21 09:01:18 2012 steveUpdateSTACISthe resurrection of STACIS -surfThere is a small wood cabinet under the
south end flow bench, labeled STACIS.
Unit is complete with extension cards
 IMG_1364.JPG 
  3697   Tue Oct 12 15:51:18 2010 yutaBureaucracySAFETYthe 40m squad received safety training from PeterYuta, Joonho, and Suresh received the Basic
Laser Safety Training from Peter King today.
  
  659   Fri Jul 11 09:29:02 2008 steveUpdatePSLthe PMC still hangs upMorning alarms:

PMC high voltage is railing, it's auto locker
 pmc4d.jpg 
  3569   Mon Sep 13 21:52:53 2010 kiwamuUpdateGreen Lockingthe X end laser is ON
 I turned ON the laser
at the X end station, which had
  
  12453   Tue Aug 30 09:51:37 2016 SteveUpdateSUSthe chamber HEPA tents are backHow to minimize particles entering the
vacuum envelope.

 
 ETMYtentHEPA.jpgvented_for_60_days.png 
  12458   Wed Aug 31 23:01:02 2016 gautamUpdateSUSthe chamber HEPA tents are backSome more numbers we found while working
in/around the chamber today:

  
  4092   Thu Dec 23 08:54:32 2010 SureshUpdateelogthe delhi univ syndromeSorry folks!  I couldnt get to the
elog and didnt know that the elog was crashing
every time I tried to access it. 
  
  790   Mon Aug 4 12:12:20 2008 steveConfigurationVACthe ifo is at atmThe 40m vac envelope was vented this morning.
P1 is at 760 Torr
 vent3h.jpgUntitled.png 
  12429   Mon Aug 22 16:33:32 2016 SteveUpdatePEMthe lab temp is upThe IFO room temp is up a bit and it is
coming down. The out side temp is not really
high.
 temp.png 
  12431   Mon Aug 22 18:35:16 2016 PrafulUpdatePEMthe lab temp is upThe temperature is decreasing slowly but
is still above 24 C.

 temp_plot.pngtemp_plot.pngtemp_plot.png 
  12538   Fri Oct 7 15:36:03 2016 SteveUpdatePEMthe lab temp is upThe IFO room temp is up




 tempUp.pngPEM4d.png 
  57   Fri Nov 2 08:59:30 2007 steveBureaucracySAFETYthe laser is ONThe psl laser is back on !   
  327   Thu Feb 21 09:56:26 2008 steveUpdatePSLthe laser is backThe laser and the psl recovered. 
The water chiller temp is 19.98C and head
temp 18.4C
 laserisback.jpg 
  1631   Fri May 29 18:57:09 2009 steveUpdatePSLthe laser is backSteve, Rob and Alberto
 
Starting capacitor 216 miroFarad
 laserisback.jpg 
  326   Wed Feb 20 16:24:37 2008 steveUpdatePSLthe laser is recovering slowlyHead temp is still 20.5C and decreasing slowly.
Power output 2.9W 
NPRO power 22 mW is increasing as head is
 laserecoverring.jpg 
  258   Thu Jan 24 11:52:56 2008 steveUpdatePEMthe mud is cleaned up & MOPA shutter is openedSafety glasses are required again!

I have just opened the mopa shutter.
  
ELOG V3.1.3-