40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 336 of 354  Not logged in ELOG logo
ID Date Author Type Category Subjectdown
  16603   Thu Jan 20 12:10:51 2022 YehonathanUpdateBHDAS1 resurrection

I was wondering whether I should take AS1 down to redo the wire clamping on the side blocks. I decided to take the OpLev spectrum again to be more certain. Attachments 1,2,3 show 3 spectra taken at different times.

They all show the same peaks 744mHz, 810mHz, 1Hz. So I think something went wrong with yesterday's measurement. I will not take AS1 down for now. We still need to apply some glue to the counterweight.

Attachment 1: FreeSwingingSpectra.pdf
FreeSwingingSpectra.pdf
Attachment 2: FreeSwingingSpectra_div_20mV.pdf
FreeSwingingSpectra_div_20mV.pdf
Attachment 3: FreeSwingingSpectra_div_50mV.pdf
FreeSwingingSpectra_div_50mV.pdf
  16722   Thu Mar 10 10:05:49 2022 PacoUpdateSUSAS1 free swing test

[Paco, Ian]

  • Begin free swinging test for AS1 at 10:05 AM, set for ~ 2.04 hours.
    • Test failed because damping failed to disable.
  • Restart free swinging test for AS1 at 15:06, set for 2.04 hours.
    • Success (Attachment #1 shows the DOF input matrix diagonalization effect)

Of slight concern is the side to other degrees of freedom coupling, but this is definitely an improvement from last time.

Attachment 1: SUS_Input_Matrix_Diagonalization.pdf
SUS_Input_Matrix_Diagonalization.pdf
  17228   Thu Nov 3 20:07:01 2022 AnchalSummaryBHDAS1 coil balancing required

[Anchal, Koji]

The LO phase lock that was achieved lasts for a short time because as soon as a considerable POS offset is required on AS1, the POS to PIT coupling causes the AS-LO overlap to go away. To fix this, we need to balance the coil outputs of AS1 atleast and add the f2a filters too. To follow similar method as used for IMC optics, we need a sensor for true PIT and YAW motion of AS1. Today, we looked into the possiblity of installing a QPD at BHD output path to use it for AS1, AS4, LO1, LO2, SR2, PR2 and PR3 coil strength tuning. We found a QPD which is mentioned in this elog. We found QPD interface boards setup for old MCT and MC Refl QPDs (dating before 2008). We also found the old IP-POS QPD cable between 1Y2 and BS Oplev table. We took out this cable from BS oplev end upto ITMY opleve table, put on a new DB25 connector on the ribbon cable, and connected it to the QPD on ITMY table. There is still following work to be done:

  • Move back the BHD port camera a few inches and the lends with it.
  • Put a beamsplitter in the beam going to this camera and align it to fall on the new QPD.
  • Connect the the other end of cable to QPD interface board on 1Y2.
  • Take the lemo outputs or IDC outputs from the QPD interface board to spare ADC inputs (maybe on LSC I/O chassis or SUS2 I/O chassis).
  • Make changes in RTS model to read this QPD input.
  • Enjoy balancing the coils on the 7 new suspensions.
  16801   Thu Apr 21 20:33:31 2022 KojiUpdateBHDAS1 UR OSEM problem localized in the chamber

Tega and Paco reported that the UR OSEM of AS1 lost the response.

- I have checked the LED MON (left) of the satellite amp for AS1. CH1/2/3 had 5V -> This indicates that the OSEM LEDs are (most likely) functioning.
- Then I went to the ITMY flange and connected the OSEM emulator instead of the Dsub25 cable. The attachment shows that the UR OSEM LED/PD worked fine with the OSEM emulator. WIth the vacuum flange connected it lost the response.

This indicates that the AS1 UR OSEM problem is localized in the chamber. Please check if the DSUB pins are touching the table or something else.

 

Attachment 1: Screenshot_from_2022-04-21_20-13-13.png
Screenshot_from_2022-04-21_20-13-13.png
  16803   Fri Apr 22 12:03:09 2022 TegaUpdateBHDAS1 UR OSEM problem localized in the chamber

[JC, Tega, Ian, Paco]

We found that the UR cable was clamped to the table by one of the ITMY OPLEV steering mirror mounts that was recently installed. After freeing the cable, the UR signal is now active again.

Quote:

This indicates that the AS1 UR OSEM problem is localized in the chamber. Please check if the DSUB pins are touching the table or something else.

 

  16578   Tue Jan 11 18:40:25 2022 AnchalSummaryBHDAS1 Sat Amp has a PCB issue

AS1 Sat Amp (S2100741) has a critical PCB issue on it's Ch5-8 board S2100548. This board is supposed to just feed through the coil driver signal from the front DB9 connector to the back DB25 connector but it has a short between pins 2 and 7 at the "Coil Input" end (connector J1). The short persists even after I disconnect the sat amp to the flange connector on the back of this board, which definitely means the short is present in the passive channeling through the PCB or at the soldering points of the two DB connectors. I just flipped the board and found that the soldering connections are clean and separate. I think we'll have to use one of the spare sat amp boxes for AS1 for now, while we either declare this one manufacture defected or fix the issue.

I actually found the short on the PCB trace by just looking carefully at it. Attachment 1 shows the photo of it. Maybe we can fix this by simply cutting the tumor between the two traces (why are these traces so close together in such a large board anyways!!!), but I'm not sure if that is a reliable way of fixing this issue. I'll wait for Koji's comments on what to do with this. We'll recommence OSEM tuning for AS1 tomorrow with fixed electronics.

Attachment 1: signal-2022-01-11-184917.jpeg
signal-2022-01-11-184917.jpeg
  16579   Thu Jan 13 09:48:41 2022 AnchalSummaryBHDAS1 Sat Amp fixed

I fixed the issue in AS1 Sat Amp (S2100741) by using a razor blade. I cut the short between the two places, cleaned up the area and covered it with electrical tape. However, later feedback from Rana was to not use electrical tape as it dries up and becomes brittle and lfaky in long run. So after the AS1 OSEM tuning is over, I'll open this box again and use something else to insulate the exposed area. See attached pictures for current status.

 

Attachment 1: signal-2022-01-13-094823_001.jpeg
signal-2022-01-13-094823_001.jpeg
Attachment 2: signal-2022-01-13-094823_002.jpeg
signal-2022-01-13-094823_002.jpeg
  16565   Mon Jan 10 17:04:47 2022 AnchalUpdateBHDAS1 Sat Amp CH2 had offset

We found that there was a small offset (~300 mV) at TP6 and TP8, in PD2 circuit (CH2 of the board). I replaced U3 AD822ARZ but did not see any affect. I disconnected the adaptor board in the back and saw that the offset went away. This might mean that the cable had some flaky short to a power supply pin. However, when I just reinserted the adaptor board back again, there was no offset. We could not find any issue with the board after that to fix, so we left it as it is. If this board gives offset issues in the future, most probably the ribbon cable would be the suspect.

Now all ADC channels are showing no offset or overflows in C1SU2 chassis.

  16580   Thu Jan 13 12:24:08 2022 AnchalSummaryBHDAS1 SD and LR magnets broke

[Anchal (vacuum work), Paco (outside)]

After the AS1 Sat Amp fix (40m/16579), we today were able to tune all OSEMs to the mid-bright level. But when we were about to call it, we were told that the new PEEK earthquake stop screw and bolts need to go on the thin suspended optics. Against better judgment, we decided to install the new back earthquake stop in-situ since we had tuned all OSEMs already. I installed the new stop but after that found that in the process I have broken off the side magnet and LR magnet from the optic adaptor and they are inside the OSEM coils now. This means we'll have to redo the AS1 suspension almost from scratch again sad. We have transported AS1 to the cleanroom where the work on re-suspension has begun.

  7665   Fri Nov 2 20:41:53 2012 JenneUpdateAlignmentAS, REFL camera shots

These don't show anything too interesting, but we're including them to show where the beams are right now on the cameras, so we can compare on Monday.

 

AS:

AS_2Nov2012.png

 

REFL:

REFL_2Nov2012.png

 

 

  7666   Fri Nov 2 21:40:04 2012 ManasaUpdateAlignmentAS, REFL camera shots

 

 To get the camera shot of AS, Y1 mirror on the path was replaced by a 99% BS and transmitted beam was directed to the camera via a 50-50 BS (ND filters were distorting the image on the camera introducing fringes).

  7668   Mon Nov 5 09:53:35 2012 JenneUpdateAlignmentAS, REFL camera shots

Today's photos:

AS:

AS_5Nov2012.png

 REFL:

REFL_5Nov2012.png

IPANG / IPPOS trends:

IPPOS_IPANG_weekend_trend.png

 

 c.f. screen caps from Friday:

Quote:

These don't show anything too interesting, but we're including them to show where the beams are right now on the cameras, so we can compare on Monday.

 

AS:

AS_2Nov2012.png

 

REFL:

REFL_2Nov2012.png

 

 

 

  11814   Wed Nov 25 22:59:42 2015 yutaroUpdateLSCAS table optics realignment

I slightly changed the orientation of a few mirrors on AS table that are used to make the AS light get into PDs, in order to confirm that the strange behavior of ASDC (I will report later) is not caused by clipping related to these mirrors or miscentering on PDs.

Then output level of ASDC, AS55, and AS165 could have changed.   

So take care of this possible change when you do something related to them. But the relative change of them would be at most several %, I think.

 

  7689   Thu Nov 8 20:11:54 2012 JenneUpdateAlignmentAS steering moved out of POY's way, 2 green beams onto PSL table

[Jenne, Jamie, Manasa, Ayaka]

 

Flipped mount of OM2, moved OM2 behind POY pickoff so we're out of the way of POY.  Adjusted and recovered rest of AS path.

We found that IPANG was not on its photodiode, but determined that it was centered on all of the in-vac mirrors, and that it was just a little bit of steering on the ETMY end out-of-vac table that needed to be done.

Got green flashes in Yarm, moved down periscope to the north by ~1 inch in order to get y green out to PSL table.  This also involved moving the steering mirror on the IOO table immediately after the down periscope to match.  We measured the MC spot positions before and after touching the periscope, and there was no significant change. 

Aligned X green to X arm (centered on ITMX, ETMX, although no flashes since we didn't move ETMX's biases around), then made sure it was centered on all of its steering mirrors, and came out of the vacuum.

Manasa took photos of all test mass chambers and the BS chamber, so we can keep up-to-date CAD drawings. 

Oplevs and IPPOS/IPANG are being centered as I type.  Manasa and Ayaka are moving the lens in front of IPANG such that we have a slightly larger beam on the QPD.

 

In the morning, Jamie is going to put apertures back on 2 of the suspended mirrors for one last check that moving things on the IOO table didn't do anything bad, but since the AS and REFL beams on those cameras didn't move significantly, we think things are fine. 

Heavy doors go on in the morning, and access connector at ~1pm, if not before lunch.  Then Steve will start pumping early Monday morning!  Hooray!

 

PS, for reference,

AS: AS_8Nov2012.png

REFL: REFL_8Nov2012.png

  1650   Thu Jun 4 01:32:20 2009 robConfigurationLSCAS port mode scan

Here is a set of mode scans of the AS port, using the OMC as a mode scanner.  The plot overlays various configurations of the IFO.  

To remove PZT nonlinearity, each scan was individually flattened in fsr-space by polynomial (3rd order) fitting to some known peak locations (the carrier and RF sidebands).
 

Attachment 1: modes.png
modes.png
  13555   Wed Jan 17 23:36:12 2018 johannesConfigurationGeneralAS port laser injection

Status of the AS-port auxiliary laser injection

  • Auxiliary laser with AOM setup exists, first order diffracted beam is coupled into fiber that leads to the AS table.
  • There is a post-PMC picked-off beam available that is currently just dumped (see picture). I want to use it for a beat note with the auxiliary laser pre-AOM so we can phaselock the lasers and then fast-switch the phaselocked light on and off.
  • I was going to use the ET3010 PD for the beat note unless someone else has plans for it.
  • I obtained a fixed triple-aspheric-lens collimator which is supposed to have a very small M^2 value for the collimation on the AS table. I still have the PSL-lab beam profiler and will measure its output mode.
  • Second attached picture shows the space on the AS table that we have for mode-matching into the IFO. Need to figure out the desired mode and how to merge the beams best.
Attachment 1: PSLbeat.svg.png
PSLbeat.svg.png
Attachment 2: ASpath.svg.png
ASpath.svg.png
  13764   Wed Apr 18 22:46:23 2018 johannesConfigurationGeneralAS port laser injection

Using Gautam's Finesse file and the cad files for the 40m optical setup I propagated the arm mode out of the AS port. For the location of the 3.04 mm waist I used the average distance to the ITMs, which is 11.321 m from the beam spot on the 2 inch mirror on the AS table close to the viewport. The 2inch lens focuses the IFO mode to a 82.6 μm waist at a distance of 81 cm, which is what we have to match the aux laser fiber output to.

I profiled the fiber output and obtained a waist of 289.4 μm at a distance of 93.3 cm from the front edge of the base of the fiber mount. Next step is to figure out the lens placement and how to merge the beam paths. We could use a simple mirror if we don't need AS110 and AS55, we could use a polarizing BS and work with s polarization, or we find a Faraday Isolator.


While doing a beam scan with the razor blade method I noticed that the aux laser has significant intensity noise. This is seen on the New Focus 1611 that is used for the beat signal between PSL and aux laser, as well as on the fiber output PD. There is a strong oscillation around 210 kHz. The oscillation frequency decreases when the output power is turned down, the noise eater has no effect. Koji suggested it could be light scattering back into the laser because I couldn't find a usable Faraday Isolator back when I installed the aux laser in the PSL enclosure. I'll have to investigate this a little further, look at the spectrum, etc. This intensity noise will appear as amplitude noise of the beat note, which worries me a little.

power_out_fluctuation_DC.png      power_out_fluctuation_AC_zoom.png

Attachment 1: ASpath.svg.png
ASpath.svg.png
  13766   Thu Apr 19 01:04:00 2018 gautamConfigurationGeneralAS port laser injection

For the arm cavity ringdowns, I guess we don't need AS55/AS110 (although I think the camera will still be useful for alignment). But for something like RC Gouy phase characterization, I'd imagine we need the AS detectors to lock various cavities. So I think we should go for a solution that doesn't disturb the AS PD beams. 

It's hard to tell from the plot in the manual (pg 52) what exactly the relaxation oscillation frequency is, but I think it's closer to 600 kHz (is this characteristic of NdYAG NPROs)??  Is the high RIN on the light straight out of the NPRO? 

Quote:

We could use a simple mirror if we don't need AS110 and AS55, we could use a polarizing BS and work with s polarization, or we find a Faraday Isolator.


There is a strong oscillation around 210 kHz. The oscillation frequency decreases when the output power is turned down, the noise eater has no effect. 

  13810   Thu May 3 10:40:43 2018 johannesConfigurationGeneralAS port laser injection

Instead of trying to couple the fiber output into the interferometer, I'm doing the reverse and maximize the amount of interferometer light going into the fiber. I set up the mode-matching solution shown in attachment #1 and started tweaking the lens positions. Attachment #2 shows the setup on the AS table. After the initial placement I kept moving the lenses in the green arrow directions and got more and more light into the fiber.

When I stopped this work yesterday I measured 86% of the AS port light coming out the other fiber end, and I have not yet reached a turning point with moving the lenses, so it's possible I can tickle out a little more than that.

It occured to me though that I may have been a little hasty with the placement of the mirror that in attachment #2 redirects the beam which would ordinarily go to AS55. For my arm ringdown measurements this doesn't matter, I could actually place it even before the 50/50 beamsplitter that sends light onto AS110 and double the amount of light going into the IFO. What signals are needed for the Guoy phase measurement? Is AS 110 sufficient, or do we need AS55?

Attachment 1: mm_solution_AStable.png
mm_solution_AStable.png
Attachment 2: AStable_beampath.pdf
AStable_beampath.pdf
  13811   Thu May 3 12:10:12 2018 gautamConfigurationGeneralAS port laser injection

I think we need AS55 for locking the configuration Jon suggested - AS55 I and Q were used to lock the SRMI previously, and so I'd like to start from those settings but perhaps there is a way to do this with AS110 I and Q as well.

Quote:
 

What signals are needed for the Guoy phase measurement? Is AS 110 sufficient, or do we need AS55?

 

  13881   Wed May 23 00:45:18 2018 johannesConfigurationGeneralAS port laser injection

I was planning to set up the additions to the AS table that are outlined in Attachment #1. Unfortunately the beam is too large for the 2mm clear aperture Faraday rotators that we have available at that position. I checked the 40m and QIL and found 5 Faraday isolators/rotators for 1064 nm total, but none have large enough aperture for the current setup. Some options for buying a larger aperture isolator are:

I wanted to leave the rest of the setup undisturbed at first, but I think a much easier solution would be to move the 2" focusing lens up by about 12", which moves the beam focus away from AS55 to where the Faraday will be placed, but we can re-focus it with another lens. I may have to change the mode-matching for the aux laser fiber slightly to accomodate this change, but if there are no other concerns I would like to start this work tomorrow (Wednesday).

Attachment 1: faraday_location.pdf
faraday_location.pdf
  16827   Tue May 3 21:05:23 2022 yutaUpdateBHDAS path alignment, removing a lot of green stuff

[Tega, Yehonathan, Koji, Yuta]

We tried to align AS path this afternoon.
IMC is not aligned now after the work today crying
Green mirrors/perisocope in IMC chamber were removed since some of them was clipping the AS beam, and this changed the balance of the IMC stack and thus MC1 and MC3 alignment.

Summary of changes:
ITMY chamber
  - Rotated AS2 in roll by 90 deg to have more aperture for the transmission (photo)
  - IR beams are now centered on AS1, AS2, AS3 and AS4 (photo, photo)

BS chamber
  - Moved ASL towards -X direction for about 1/4 inch
  - Installed GRY_SM2 at the nominal position (re-used GR_SM3 from IMC chamber)

IMC chamber
  - Removed green optics GR_SM4, GR_SM3, GR_PERI2L (GR_PERI2L is now stored at Xend)
  - Removed IFI camera mirrors FIV1, FIV2 (they are now stored at Xend) (photo, photo)
  - GR_SM4 mount is now reused as GRY_SM1 (Y2-2037-0 is now mounted instead of previously mounted Y2-LW1-2050-UV-45P/AR), and GRY_SM1 is installed at the nominal position (photo)
  - Moved weights to balance the stack

OMC chamber (we don't have OMC in this chamber...)
  - We swapped AS5 and AS6 so that the nobs comes in -X direction to have more spacing between AS beam and IMC REFL beam (photo)
  - Moved weights to balance the stack

What we did:
1. Misaligned ITMX and use ITMY reflected beam to align AS path
2. Centered the IR beam on AS1 using SR2
3. Centered the IR beam on AS2 and ASL using AS1. AS2 was rotated in roll by 90 deg to have more aperture for the transmisson. cool
4. Centered the IR beam on AS3 using AS2 nobs, centered the IR beam on AS4 by rotating AS3 in yaw.
5. "AS beam" (it turned out that what we are looking was actually not the AS beam!! Some stray light) was in +X direction by 1 inch or so at AS5. Moving AS5 to center the beam would clip IMC REFL beam. So we swapped AS5 and AS6 so that the nobs comes in -X direction to have more spacing between AS beam and IMC REFL beam.
6. Balanced OMC chamber stack again using IMC REFL beam as a referece (bring the IMC REFL beam to the reference red circle on the monitor).
7. Tweaked the alignment of TT1 and TT2 to have Yarm flashing to ~0.9 in TRY. angel
8. Moved AS5 towards +X by an inch or so to center the "AS beam."
9. Moved ASL towards -X direction for about 1/4 inch and re-centered the beam by AS1 to see if the "AS beam" gets far from IMC REFL at OMC chamber, but the "AS beam" didn't move much.
10. By blocking the beam from ITMY, we found that "AS beam" was not the actual one. frown
11. Opened IMC chamber and found that AS beam is blocked by the past optics.
12. Removed old green optics and IFI camera mirrors. GR_SM4 mount and GR_SM3 were reused as mentioned above.
13. Tried to balance IMC chamber stack to recover IMC alignment. We used IMC REFL beam as a reference, but it was hard to completely bring the IMC REFL beam to the reference red circle on the monitor. It is now off by a beam diameter or so. No IMC flashing now. crying

Next:
Theoretically, balancing IMC chamber stack would recover all the IFO alignment, but maybe tough. It is maybe easier to align MC1 and MC3 to have IMC locked. Assuming input pointing to IMC is not drifted too much, we should be able to recover Yarm flashing by tweaking TT1 alignment only. However, MC3 SD OSEM is at the edge of the range. We might have to balance the stack more or tweak SD OSEM position.

Attachment 1: log_AS2Rotated.jpg
log_AS2Rotated.jpg
Attachment 2: log_AS5andAS6swapped.JPG
log_AS5andAS6swapped.JPG
Attachment 3: log_IFIMirrorsBeforeRemoving.JPG
log_IFIMirrorsBeforeRemoving.JPG
Attachment 4: log_IFIMirrorsPlacedatXend.JPG
log_IFIMirrorsPlacedatXend.JPG
Attachment 5: log_NewGRY_SM1.JPG
log_NewGRY_SM1.JPG
Attachment 6: log_OnAS3.JPG
log_OnAS3.JPG
Attachment 7: log_OnAS4.JPG
log_OnAS4.JPG
  16848   Thu May 12 19:55:01 2022 TegaUpdateBHDAS path alignment

[Yuta, Tega]

We finally managed to steer the AS beam from ITMY chamber, through BS and IMC chambers, to the in-air AP table.

We moved the AS5 mirror north to its nominal position and we also moved the ASL lens on BS chamber back to its nominal position. Attached photos are taken after today's alignment work.

Attachment 1: AS.JPG
AS.JPG
Attachment 2: OMCchamber.JPG
OMCchamber.JPG
  13241   Tue Aug 22 16:56:54 2017 johannesSummaryGeneralAS laser existing components inventory

I surveyed the lab today to see what we may need to buy for the AS laser setup.

We have:

NPRO 200 mW + Driver

Faraday Isolator from cabinet

ISOMET Model 1201E: This is a free space AOM I found in the modulator cabinet. It needs to be driven at 40MHz (to be confirmed) with ~6W of electrical power. For a 500 micron beam it can allegedly achieve rise times of '93' [units not specified, could this be nanoseconds?]. I did not find a dedicated driver for it, however there was a 5W minicircuits amplifier ZHL-5W-1 in the RF cabinet and a switch ZSDR-230, which has a typical switch time of 2 microseconds, however I'm not sure how this translates to rise/fall times of the deflected power. It seems we have everything to set this up, so we'll by the end of the week if we can use a combination of these things or if we need to buy additional driver electronics.

New Focus model 4004 broadband phase modulator which is labeled as dusty, and in fact quite dirty when looking through. We should attempt to clean this thing and maybe we can use it here or at the ends.

Probably all the optics we need for the PSL table setup.

 

We need:

Beat PD: How about one of these: EOT ET-3000A? I didn't find a broadband PD for the beat with the PSL

Fiber Stuff: coupler & polarization maintaining fiber 20m & collimator. There are a couple options here, which we can discuss in the meeting.

Faraday Isolator: If we want to inject P-polarization. If S is okay we can use a polarizing plate beamsplitter instead.

Possibly some large lenses for mode-matching to IFO (TBD)

 

 

  12563   Fri Oct 14 18:33:55 2016 gautamUpdateGeneralAS clipping investigations

[steve,ericq,gautam]

In the afternoon, we took the heavy door off the OMC chamber as well, such that we could trace the AS beam all the way out to the AP table. 

In summary, we determined the following today:

  1. Beam is centered on SRM, as judged by placing the SOS iris on the tower
     
  2. Beam is a little off on OM1 in yaw, but still >2 beam diameters away from the edge of the steering optic, pitch is pretty good
  3. Beam is okay on OM2 
  4. Beam is okay on OM3 - but beam from OM3 to OM4 is perilously close to clipping on the green steering mirror between these two steering optics (see CAD drawing). We think this is where whatever effect of the SR2 hysteresis shows up first.
  5. Beam is a little low and a little to the left on OM4 (the first PZTJena mirror)
  6. Beam is well clear of other optics in the BS PRM chamber on the way from OM4 to OM5 in the OMC chamber
  7. Beam is a little low and a little to the left of OM5 in the OMC chamber. This is the second PZTJena mirror. We are approximately 1 beam diameter away from clipping on this 1" optic
    Link to IMG_2289.JPG
  8. Beam is off center on OMPO-OMMTSM partially transmissive optic, but because this is a 2" optic, the room for error is much more
    Link to IMG_2294.JPG
  9. Beam is well clear of optics on OMC table on the way from OMPO-OMMTSM to OM6, the final steering mirror bringing the AS beam out onto the table
  10. Beam is low and to the left on OM6. It is pretty bad here, we are < 1 beam diameter away from clipping on this optic, this along with the near miss on the BS/PRM chamber are the two most precarious positions we noticed today, consistent with the hypothesis in this elog that there could be multiple in vacuum clipping points
    Link to IMG_2306.JPG
  11. Beam clears the mirror just before the window pretty confortably (see photo, CAD drawing). But this mirror is not being used for anything useful at the moment. More importantly, there is some reflection off the window back onto this mirror frame which is then scattering and creating some ghost beams, so this could explain the anomalous ASDC behaviour Koji and Yutaro saw. In any case, I would favour removing this mirror since it is serving no purpose at the moment.
    Link to IMG_2310.JPG

Attachment #5 is extracted from the 40m CAD drawing which was last updated in 2012. It shows the beam path for the output beam from the BS all the way to the table (you may need to zoom in to see some labels. The drawing may not be accurate for the OMC chamber but it does show all the relevant optics approximately in their current positions.

EQ will put up photos from the ITMY and BS/PRM chambers.

Plan for Monday: Reconfirm all the findings from today immediately after running the dither alignment so that we can be sure that the ITMs are well-aligned. Then start at OM1 and steer the beam out of the chambers, centering the beam as best as possible given other constraints on all the optics sequentially. All shutters are closed for the weekend, though I left the SOS iris in the chamber...

Here is the link to the Picasa album with a bunch of photos from the OMC chamber prior to us making any changes inside it - there are also some photos in there of the AS beam path inside the OMC chamber...

Attachment 1: IMG_2289.JPG
IMG_2289.JPG
Attachment 2: IMG_2294.JPG
IMG_2294.JPG
Attachment 3: IMG_2306.JPG
IMG_2306.JPG
Attachment 4: IMG_2310.JPG
IMG_2310.JPG
Attachment 5: ASBeamClipping.pdf
ASBeamClipping.pdf
  8118   Wed Feb 20 19:20:50 2013 EvanUpdateAlignmentAS camera alignment

[Manasa, Evan]

Manasa and I are trying to get the AS beam onto the AS camera with a focusing lens. Currently, the mirror immediately preceding the camera has been removed and the camera and lens are sitting directly behind the BS.

  7404   Tue Sep 18 22:06:21 2012 Mike J.UpdateElectronicsAS beam scan plots and chi-squared

Results of the Razor Blade Beam Scan

The horizontal blade test measured the beam intensity as a razor blade passed in between it and a power meter from the left side of the beam (negative x values) until blocking it. The resulting function, found through least-squares regression of the error function, calculates a beam height of 3.6 mm +/- 16 mm. However, the function has a chi-squared value of 3.2, so that value may not be accurate.

H_raz.png

The vertical blade test measured beam intensity as a razor moved from below the beam (negative x values) until blocking it. This function, found the same way as above, calculates a beam width of 2.8mm +/- 9.6 mm, and has chi-squared value of 0.77.

 V_raz.png

Both data sets have a y-error of 0.5 micro-Watts, and an x-error of 0.127 mm. The Python code used to analyze the data and plot the results is attached.

Attachment 1: beam_width.py
#############################################
#   Python code for finding Gaussian-beam   #
# 		spot size w(z) from intensity 		#
# 		 vs. blocked portion of beam  		#
#############################################
#           Coded by Mike Jenson            #
#############################################

import numpy as np
from scipy.special import erf
... 93 more lines ...
  7386   Fri Sep 14 01:35:55 2012 Mike J.UpdateElectronicsAS beam scan PLOTS

H_razor.jpegV_razor.jpeg

  7372   Tue Sep 11 17:17:51 2012 Eric Q., Mike J.ConfigurationElectronicsAS beam scan

We conducted a beam scan on the AP table of the AS beam. We used a lens to focus the beam onto a power meter, and slowly moved a razor blade across the beam using a micrometer, vertically and horizontally both in front of and behind the beam. We also had to block the beam next to the AS beam in order to do this, but is unblocked now. Mike will begin curve fitting the data to try and see if there is a different spot size given by the x-axis vs. the y-axis, and if the lens has any effect.

  7377   Wed Sep 12 20:08:51 2012 ericqUpdateElectronicsAS beam scan

Quote:

We conducted a beam scan on the AP table of the AS beam. We used a lens to focus the beam onto a power meter, and slowly moved a razor blade across the beam using a micrometer, vertically and horizontally both in front of and behind the beam. We also had to block the beam next to the AS beam in order to do this, but is unblocked now. Mike will begin curve fitting the data to try and see if there is a different spot size given by the x-axis vs. the y-axis, and if the lens has any effect.

 [ericq, mikej, some input from zach]

After realigning the MC, the measurement was repeated this afternoon. This time, however, we isolated the beam from ITMY by misaligning ITMX. The beam looked somewhat elliptical to me, and Mike should have fits up tonight. Afterwards, ITMX was returned to the position I found it in, and the PMC shutter and access connector were closed. (Sorry about last night!)

  7380   Thu Sep 13 19:59:43 2012 Mike J.UpdateElectronicsAS beam scan

**EDIT:** Mixed up X and Y. Beam is 3.5844 mm tall and 2.7642 mm wide

14.112 hundredths of an inch in the vertical direction

3.5844 millimeters

10.883 hundredths of an inch in the horizontal direction

2.7642 millimeters

Plots and error bars to come soon.

  8347   Tue Mar 26 00:06:37 2013 JenneUpdateLockingAS beam put back on PD

[Jenne, Gabriele]

We aligned MICH (first locked Yarm, but didn't optimize since we don't have TRY, then locked Xarm, then aligned MICH), but there was no beam on AS55.  We went out to check, and the beam was almost not hitting the small steering mirror between AS55.  We adjusted the BS splitting the beam between camera and PD, and got the beam back on AS55. We could then lock MICH.

We also futzed with the REFL55 phase to get PRCL stuff in I, and MICH stuff in Q.  The procedure was to align PRMI, then kick PRM in pos, and adjust the phase so we got signal mostly in I after the kick.  We started at the original value of 60deg, but are leaving it at -20deg.

  12566   Mon Oct 17 22:45:16 2016 gautamUpdateGeneralAS beam centered on all OMs

[ericq, lydia, gautam]

IMC realignment, Arm dither alignment

  • We started today by re-locking the PMC (required a c1psl restart), re-locking the IMC and then locking the arms
  • While trying to dither align the arms, I could only get the Y arm transmission to a maximum of ~0.09, while we are more used to something like 0.3 when the arm is well aligned this vent
  • As it turns out, Y arm was probably locked to an HOM, as a result of some minor drift in the ITMY optical table leveling due to the SOS tower aperture being left in over the weekend

ITMY chamber

  • We then resolved to start at the ITMY chamber, and re-confirm that the beam is indeed centered on the SRM by means of the above-mentioned aperture
  • Initially, there was considerable yaw misalignment on the aperture, probably due to the table level drifting because of the additional weight of the aperture
  • As soon as I removed the aperture, eric was able to re-dither-align the arms and their transmission went back up to the usual level of ~0.3 we are used to this vent
  • We quickly re-inserted the aperture and confirmed that the beam was indeed centered on the SRM
  • Then we removed the aperture from the chamber and set about inspecting the beam position on OM1
  • While the beam position wasn't terribly bad, we reasoned that we may as well do as good a job as we can now - so OM1 was moved ~0.5 in such that the beam through the SRM is now well centered on OM1 (see Attachment #1 for a CAD drawing of the ITMY table layout and the direction in which OM1 was moved)
  • Naturally this affected the beam position on OM2 - I re-centered the beam on OM2 by first coarsely rotating OM1 about the post it is mounted on, and then with the knobs on the mount. The beam is now well centered on OM2
  • We then went about checking the table leveling and found that the leveling had drifted substantially - I re-levelled the table by moving some of the weights around, but this has to be re-checked before closing up... 

BS/PRM chamber

  • The beam from OM2 was easily located in the BS/PRM chamber - it required minor yaw adjustment on OM2 to center the beam on OM3
  • Once the beam was centered on OM3, minor pitch and yaw adjustments on the OM3 mount were required to center the beam on OM4
  • The beam path from OM3 to OM4, and OM4 to the edge of the BS/PRM chamber towards the OMC chamber was checked. There is now good clearance (>2 beam diameters) between the beam from OM4 to the OMC chamber, and the green steering mirror in the path, which was one of the prime clipping candidates identified on Friday

OMC chamber

  • First, the beam was centered on OM5 by minor tweaking of the pitch and yaw knobs on OM4 (see Attachment #2)
  • Next, we set about removing the unused mirror just prior to the window on the AP table (see Attachment #3). PSL shutter was closed for this stage of work, in order to minimize the chance of staring directly into the input beam!
  • Unfortunately, we neglected checking the table leveling prior to removing the optic. A check after removing the optic suggested that the table wasn't level - this isn't so easy to check as the table is really crowded, and we can only really check near the edges of the table (see Attachment #3). But placing the level near the edge introduces an unknown amount of additional tilt due to its weight. We tried to minimize these effects by using the small spirit level, which confirmed that the table was indeed misaligned
  • To mitigate this, we placed a rectangular weight (clean) around the region where the removed mirror used to sit (see Attachment #3)Approximately half the block extends over the edge of the table, but it is bolted down. The leveling still isn't perfect - but we don't want to be too invasive on this table (see next bullet point). Since there are no suspended optics on this table, I think the leveling isn't as critical as on the other tables. We will take another pass at this tomorrow but I think we are in a good enough state right now. 
  • All this must have bumped the table quite a bit, because when we attempted re-locking the IMC, we noticed substantial misalignment. We should of course have anticipated this because the mirror launching the input beam into the IMC, and also MMT2 launching the beam into the arms, sits on this table! After exploring the alignment space of the IMC for a while, eric was able to re-lock the IMC and recover nominal transmission levels of ~1200 counts. 
  • We then re-locked the arms (needed some tip-tilt tweaking) and ran the dither again, setting us up for the final alignment onto OM6
  • OM5 pitch and yaw knobs were used to center the beam on OM6 - the resulting beam spot on OMPO-OMMTSM and OM6 are shown in Attachment #4 and Attachment #5 respectively. The centering on OMPO-OMMTSM isn't spectacular, but I wanted to avoid moving this optic if possible. Moreover, we don't really need the beam to follow this path (see last bullet in this section)
  • Beam path in the OMC chamber (OM5 --> OMPO-OMMTSM --> OM6 --> window was checked and no significant danger of clipping was found
  • Beam makes it cleanly through the window onto the AP table. We tweaked the pitch and yaw knobs on OM6 to center the beam on the first in-air pick off mirror steering the AS beam on the AP table. The beam is now visible on the camera, and looks clean, no hint of clipping
  • As a check, I wondered where the beam into the OMC is actually going. Turns out that as things stand, it is hitting the copper housing (see Attachment #6, it's had to get a good shot because of the crowded table...). While this isn't critical, perhaps we can avoid this extra scatter by dumping this beam?
  • Alternatively, we could just bypass OMPO-OMMTSM altogether - so rotate OM5 in-situ such that we steer the beam directly onto OM6. This way, we avoid throwing away half (?) the light in the AS beam. If this is the direction we want to take, it should be easy enough to make the change tomorrow

In summary...

  • AS beam has been centered on all steering optics (OM1 through OM6)
  • Table leveling has been checked on ITMY and OMC chambers - this will be re-checked prior to closing up
  • Green-scatter issue has to be investigated, should be fairly quick..
  • In the interest of neatness, we may want to install a couple of beam dumps - one to catch the back-reflection off the window in the OMC chamber, and the other for the beam going to the OMC (unless we decide to swivel OM5 and bypass the OMC section altogether, in which case the latter is superfluous)

C1SUSAUX re-booting

  • Not really related to this work, but we couldn't run the MC relief script due to c1susaux being unresponsive
  • I re-started c1susaux (taking care to follow the instructions in this elog to avoid getting ITMX stuck)
  • Afterwards, I was able to re-lock the IMC, recover nominal transmission of ~1200 counts. I then ran the MC relief servo
  • All shutters have been closed for the night
Attachment 1: OM1Moved.pdf
OM1Moved.pdf
Attachment 2: IMG_3304.JPG
IMG_3304.JPG
Attachment 3: OMCchamber.pdf
OMCchamber.pdf
Attachment 4: IMG_3292.JPG
IMG_3292.JPG
Attachment 5: IMG_3307.JPG
IMG_3307.JPG
Attachment 6: IMG_3297.JPG
IMG_3297.JPG
  6884   Wed Jun 27 16:23:12 2012 yutaUpdateIOOAS and REFL on AP table aligned

I touched steering mirrors for AS and REFL at AP table.
AS beam and REFL beam now hits cameras at center and their respective PDs.

What I did:
  1. Aligned Y arm and X arm.

  2. Locked FPMI and aligned BS + X arm by minimizing ASDC (DC output of the AS55 PD, C1:LSC-ASDC_OUT reached ~ -1.43).

  3. Put -2V offset to the OMC stage 2 in yaw to avoid AS clipping. The offset is currently given by SRS DS345 on AUX_OMC_NORTH rack.

  4. Misaligned ETMs, locked MI in the bright fringe. Maximized ASDC (C1:LSC-ASDC_OUT reached ~ 1.22) by aligning 2 mirrors right after the vacuum chamber. This also centered beam spot on the AS camera.

  5. Locked MI in the dark fringe. Maximized REFLDC (DC output of the REFL55 PD, C1:LSC-REFLDC_OUT reached ~ 2.5) by aligning 2 mirrors after the vacuum chamber. Beam spot on the REFL camera was centered, too.

  7674   Tue Nov 6 17:07:04 2012 jamieUpdateAlignmentAS and REFL

AS: tmp6oTENk.png

REFL: tmplamEtZ.png

  17320   Mon Nov 28 20:14:27 2022 AnchalUpdateASCAS WFS proposed path to IMC WFS heads

In Attachment 1, I give a plan for the proposed path of AS beam into the IMC WFS heads to use them temporarily as AS WFS. Paths shown in orange are the existing MC REFL path, red for the existing AS path, cyan for the proposed AS path, and yellow for the existing IFO refl path.  We plan to overlap AS beam to the same path by installing the following new optics on the table:

  • M1 will be a new mirror mounted on a flipper mount reflecting 100% of AS beam to SW corner of the table.
  • M2 will be a new fixed mirror for steering the new AS beam path to match with MC WFS path.
  • M3 will be the existing beamsplitter used to pick off light for MC refl camera. We'll just mount this on a flipper so that it can be removed from the path. Precaution will be required to protect the CCD from high intensity MC reflection by putting on more ND filters.
  • The AS beam would need to be made approximately 1 mm in beam width. The required lenses for this would be placed between M1 and M2.

I request people to go through this plan and find out if there are any possible issues and give suggestions.


PS: Thanks JC for the photos. I got it from foteee google photos. It would be nice if these are also put into the 40m wiki page for photos of optical tables.


RXA: Looks good. I'm not sure if ND filters can handle the 1 W MC reflection, so perhaps add another flipper there. It would be good if you can measure the power on the WFS with a power meter so we know what to put there. Ideally we would match the existing power levels there or get into the 0.1-10 mW range.

Attachment 1: F5B115E5-885F-463C-9645-BB2EB73B6144_1_201_a.jpeg
F5B115E5-885F-463C-9645-BB2EB73B6144_1_201_a.jpeg
  17408   Sat Jan 21 15:32:40 2023 AnchalUpdateASCAS WFS path nominally set

I've completed the beam redirection path for AS beam to WFS heads in a nominal way. By that I mean that all mirrors (M1, M2, M3, and M4) are now in their final positions and we will need to install one or two lenses to collimate the beam to match the mode that the WFS path is expecting as it has it's on the focusing lens before the photodiodes. For this last part, I think the fasted way would be to profile the beam and calculate the correct lens and position rather than trial and error as the beam intensity is very low for estimating the beam size by eye.

IMC WFS state: Flip M1 and M2 down.

AS WFS state: Flip M1 and M2 up.

Attachment 1: PXL_20230121_231740878.NIGHT.jpg
PXL_20230121_231740878.NIGHT.jpg
  17412   Mon Jan 23 20:50:58 2023 AnchalUpdateASCAS WFS path beam profiled

I measured the expected beam profile by WFS photodiodes by measuring the beam when mode cleaner was unlocked from the point where beam is picked for WFS. See attachment 1 for beam details. z=0 is the point in the path where AS beam will merge.

For measuring the beam profile of AS beam, I had to focus it using a lens. I picked up a 360.6 mm ROC lens and placed it at z=-67 inch point. Then I profiled the beam at some comfortable section of the path and fitted it. with reverse z-axis. Using this method, I can place the lens back and obtain the original beam back. Attachment 2 shows this fitting process and identification of the original beam profiles. I plotted the AS beam profiles again in attachment 3 and saved them for seeding mode matching effort later. Note that we don't want to be super accurate here, so I did not do any error analysis, just wanted to finish this fast. Also pardon me for the bad quality plots, I did not want to learn Matlab plotting to make it beautiful.

Note: There is significant astigmatism in both IMC reflection beam and AS beam. This could be due to beam going through far off-center on lens. Something to keep in mind, again this measurement is not ideal in terms of precision but this large an astigmatism could not be due to measurement error.


Next:

  • Identify correct len(s) and their positions
  • Align the AS beam to WFS heads
  • Test the full signal chain.
Attachment 1: WFSPathBeamProfile.pdf
WFSPathBeamProfile.pdf WFSPathBeamProfile.pdf WFSPathBeamProfile.pdf
Attachment 2: ASFocPathBeamProfile.pdf
ASFocPathBeamProfile.pdf ASFocPathBeamProfile.pdf ASFocPathBeamProfile.pdf
Attachment 3: ASPathBeamProfile.pdf
ASPathBeamProfile.pdf ASPathBeamProfile.pdf ASPathBeamProfile.pdf
  17416   Tue Jan 24 21:04:59 2023 AnchalUpdateASCAS WFS path beam profiled

I completed the mode matching calculation today and found good solution with 360.6 mm ROC PLCX lens at -1.2 m from z=0 point. I placed the lens there today and aligned all mirrors to get centered beam on both WFS PDs when the flipper mirrors are flipper up. This alignment would probably require tweaking everying we flip the mirrors as the flipper mirrors do not come back to same position usually.

I mounted the modified WFS boards 111B and 112B next to the whitening filter boards of existing WFS. Now to switch over, onewould need to transfer the 8 RF lemo cables and the 2 IDE ribbon cables.

I'm working on rtcds model to read AS WFS data and handle it separately. I'll keep a WPICS binaruy switch to switch between IMC WFS or AS WFS. I need to figure out some build issues on this work still.

 

Attachment 1: ASBeamFocusingLens.png
ASBeamFocusingLens.png
  17444   Fri Feb 3 12:50:47 2023 AnchalUpdateASCAS WFS model changes and phase calibration

Model and medm changes

After incrementally doing the model changes, I found out that the model was failing to build because of creation of a subsystem. If I just kept all divertor blocks out in the main model instead of in a single subsystem, the compilation works. Maybe the reason is because RCG can only take subsystems at base level which have top_names attribute. But I did nto test this, I just went with what works.

In summary, I added a new subsystem in c1ioo model called AWS (stands for Antisymmetric Wavefront Sensors). This subsystem and IOO subsystem receive teh WFS RF demodulated signals based on a single binary switch named C1:IOO-SEL_WFS_IMC_OR_AS. Value 0 connects the subsystem IOO to the inputs and value 1 connects AWS to the inputs. There is a switch on the left edge in the WFS screens now to select between the two.

Inside the AWS, the WFS I/Q phase rotation is done and then it goes into one of the two subsystems called AWS-XARM or AWS-YARM for using the AS for either XARM or YARM. THis is based on a single binary switch called C1:AWS-SEL_ARM_X_OR_Y. Value 0 selects output to XARM and value 1 selects output to YARM. There is a switch near top left of  C1AWS_XARM_WFS_MASTER.adl and C1AWS_YARM_WFS_MASTER.adl screens. I copied these screens from C1IOO_WFS_MASTER.adl, so they have same structure. See attachment 1. Any edits should be made to /opt/rtcds/caltech/c1/medm/c1ioo/master/C1AWS_XARM_WFS_MASTER.adl and simply run python opt/rtcds/caltech/c1/medm/c1ioo/master/createYARMWFSscreensFromX.py to create teh YARM screen from it.

Along with this, models c1scy and c1scx were edited also to take in IPC directly from c1ioo instead of going through RFM. We should phase out use of RFM eventually and directly connect all IPC connections with the ends.

First tests

[Anchal, Yuta]

After the model is up and running, we flipped the WFS path to use AS beam. I switched the 8 RF outputs of the WFS from IMC WFS boads to AS WFS boards and switched the IDC connectors to WFS. Attachment 2 shows teh photo in this flipped state. Then we misaligned both ITMX and ETMX. First simple test was to check if we see the YARM PDH error signal when YARM was flashing. And indeed we saw that on all 16 channels. So next we locked YARM and injected 311 Hz line with 300 counts amplitude at ETMY. We looked for this peak in the Q channels of WFS outputs and adjusted all phases to 0.1 degrees to minimize Q signal to the noise floor. For WFS2 case, teh SNR is bit higher due to more power than WFS1 and their phase angle might be adjusted to even better degree but we did not got for it.

Then I used C1AWS_XARM_WFS_MASTER.adl>!Actions>Correct WFS RF offsets button to remove offsets in all the RF demodulated signals. I have set this button to use /opt/rtcds/caltech/c1/Git/40m/scripts/RFPD/resetOffsets.py script.

At this point, we are ready to see if we have WFS sensitivity but I need to work on other projects today and Yuta and Paco took over interferometer for 60 Hz noise hunting.

 

 

Attachment 1: YARM_WFS_MASTER.png
YARM_WFS_MASTER.png
Attachment 2: PXL_20230203_211014833.jpg
PXL_20230203_211014833.jpg
  16280   Mon Aug 16 23:30:34 2021 PacoUpdateCDSAS WFS commissioning; restarting models

[koji, ian, tega, paco]

With the remote/local assistance of Tega/Ian last friday I made changes on the c1sus model by connecting the C1:ASC model outputs (found within a block in c1ioo) to the BS and PRM suspension inputs (pitch and yaw). Then, Koji reviewed these changes today and made me notice that no changes are actually needed since the blocks were already in place, connected in the right ports, but the model probably just wasn't rebuilt...

So, today we ran "rtcds make", "rtcds install" on the c1ioo and c1sus models (in that order) but the whole system crashed. We spent a great deal of time restarting the machines and their processes but we struggled quite a lot with setting up the right dates to match the GPS times. What seemed to work in the end was to follow the format of the date in the fb1 machine and try to match the timing to the sub-second level. This is especially tricky when performed by a human action so the whole task is tedious. We anyways completed the reboot for almost all the models except the c1oaf (which tends to make things crashy) since we won't need it right away for the tasks ahead. One potential annoying issue we found was in manually rebooting c1iscey because one of its network ports is loose (the ethernet cable won't click in place) and it appears to use this link to boot (!!) so for a while this machine just wasn't coming back up.

Finally, as we restored the suspension controls and reopened the shutters, we noticed a great deal of misalignment to the point no reflected beam was coming back to the RFPD table. So we spent some time verifying the PRM alignment and TT1 and TT2 (tip tilts) and it turned out to be mostly the latter pair that were responsible for it. We used the green beams to help optimize the XARM and YARM transmissions and were able to relock the arms. We ran ASS on them, and then aligned the PRM OpLevs which also seemed off. This was done by giving a pitch offset to the input PRM oplev beam path and then correcting for it downstream (before the qpd). We also adjusted the BS OpLev in the end.


Summary; the ASC BS and PRM outputs are now built into the SUS models. Let the AS WFS loops be closed soon!


Addenda by KA
- Upon the RTS restarting,

  • Date/Time adjustment
    sudo date --set='xxxxxx'
  • If the time on the CDS status medm screen for each IOP match with the FB local time, we ran
    rtcds start c1x01
    (or c1x02, etc)
  • Every time we restart the IOPs, fb was restarted by
    telnet fb1 8083
    > shutdown

    and restarted mx_stream from the CDS screen because these actions change the "DC" status.

- Today we once succeeded to restart the vertex machines. However, the RFM signal transmission did fail. So the end two machines were power cycled as well as c1rfm, but this made all the machines in RED again. Hell...

- We checked the PRM oplev. The spot was around the center but was clipped. This made us so confused. Our conclusion was that the oplev was like that before the RTS reboot.

  16267   Mon Aug 2 16:18:23 2021 PacoUpdateASCAS WFS MICH commissioning

[anchal, paco]

We picked up AS WFS comissioning for daytime work as suggested by gautam. In the end we want to comission this for the PRFPMI, but also for PRMI, and MICH for completeness. MICH is the simplest so we are starting here.

We started by restoromg the MICH configuration and aligning the AS DC QPD (on the AS table) by zeroing the C1:ASC-AS_DC_YAW_OUT and C1:ASC-AS_DC_PIT_OUT. Since the AS WFS gets the AS beam in transmission through a beamsplitter, we had to correct such a beamsplitters's aligment to recenter the AS beam onto the AS110 PD (for this we looked at the signal on a scope).

We then checked the rotation (R) C1:ASC-AS_RF55_SEGX_PHASE_R and delay (D) angles C1:ASC-AS_RF55_SEGX_PHASE_D (where X = 1, 2, 3, 4 for segment) to rotate all the signal into the I quadrature. We found that this optimized the PIT content on C1:ASC-AS_RF55_I_PIT_OUT and YAW content on C1:ASC-AS_RF55_I_YAW_OUTMON which is what we want anyways.

Finally, we set up some simple integrators for these WFS on the C1ASC-DHARD_PIT and C1ASC-DHARD_YAW filter banks with a pole at 0 Hz, a zero at 0.8 Hz, and a gain of -60 dB (similar to MC WFS). Nevertheless, when we closed the loop by actuating on the BS ASC PIT and ASC YAW inputs, it seemed like the ASC model outputs are not connected to the BS SUS model ASC inputs, so we might need to edit accordingly and restart the model.

  8971   Tue Aug 6 12:43:23 2013 Alex ColeConfigurationElectronicsAS Table and Rack 1Y1 Additions

For the photodetector frequency response project, I finished the construction of our baluns chassis and mounted it in rack 1Y1 (1st picture).

After consulting with Jenne, I mounted the fiber launcher for REFL165 on the AS table such that it would not cause an obstruction. I aligned the launcher using a multimeter to monitor the DC output of REFL165, but looking at the data I got, it seems I need to do a better alignment/focusing job to get rid of a bunch of noise.

Attachment 1: photo_1_(5).JPG
photo_1_(5).JPG
Attachment 2: photo_2_(5).JPG
photo_2_(5).JPG
  8859   Tue Jul 16 17:02:41 2013 Alex ColeConfigurationElectronicsAS Table Additions

 [Eric, Alex]

We added our reference photodetector (Newport 1611, REF DET) to the southern edge of the AS table, as pictured. The detector's power supply is located under the southwest corner of the table, as pictured. We have connected the detector to its power supply, and will connect the detector's fiber input and RF output tomorrow.

EDIT: this is about the RFPD frequency response setup...

Attachment 1: photo_1_(1).JPG
photo_1_(1).JPG
Attachment 2: photo_2_(2).JPG
photo_2_(2).JPG
  8862   Wed Jul 17 11:13:36 2013 Alex ColeConfigurationElectronicsAS Table Additions

[Eric, Alex]

For the RFPD frequency response project, we routed the fiber that will connect our REF DET (on the AS table) to our 1x16 optical splitter (in the OMC_North rack), as pictured. (The new fiber is the main one in the picture, which ends at the right edge near REF DET) Note that we secured the fiber to the table in two places to ensure the fiber would remain immobile and out of other optical paths already in place.

At 2:00 we plan to run fiber from our laser module (in rack 1Y1) to our 1x16 optical splitter (in the OMC_North rack) and measure the power output at one of the splitter's output ports. We plan to keep the output power limited to less than 0.5 mW per optical splitter output.

Attachment 1: photo_(1).JPG
photo_(1).JPG
  8863   Wed Jul 17 16:15:42 2013 Alex ColeConfigurationElectronicsAS Table Additions

[Eric, Alex]

We decided that the POY Table would be a better home for our REF DET (Newport 1611 FC-AC) than the AS Table. We moved the PD to the POY Table (1st attachment) and routed a fiber from our 1x16 Optical Splitter in the OMC_North rack to the POY Table. REF DET's power supply is now located under the POY table (2nd attachment). We left the fiber described in the previous post on the AS Table.

Afterwards, we hooked a fiber up to our laser module to test it (3rd attachment). The laser was not being distributed, just going to one fiber with a power meter at its end. Everything turns out, but we realized we need to read the power supply's manual before continuing. 

 

 

Attachment 1: photo_1_(3).JPG
photo_1_(3).JPG
Attachment 2: photo_2_(3).JPG
photo_2_(3).JPG
Attachment 3: photo_3.JPG
photo_3.JPG
  4521   Wed Apr 13 23:32:07 2011 Aidan, JamieConfigurationLSCAS PD and Camera installed

I spent some time tracking down the AS beam which had vanished from the AP table. Eventually, by dramatically mis-aligning SRM, PRM and ITMY, returning BS to its Jan 1st PITCH and YAW values and tweaking the ITMX alignment [actual values to follow], I was able to get an AS beam out onto the AP table. I verified that it was the prompt reflection off ITMX by watching it move as I changed the YAW of that optic and watching it stay stationary as I changed the YAW of ITMY.

Jamie and I then steered the beam through a 2" PLCX-50.8-360.6 lens and placed the RF PD (AS55) at the focus. Additionally, we installed the AS camera to observe the leakage field through a Y1S steering mirror (as shown in the attached diagram).

Currently the PD has power but the RF and DC outputs are not connected to anything at the moment.

Atm 2 by Steve

 

 

Attachment 1: AS_beam.jpg
AS_beam.jpg
Attachment 2: P1070546.JPG
P1070546.JPG
  4536   Fri Apr 15 22:57:38 2011 Aidan, JamieConfigurationLSCAS PD and Camera installed

AS port ITMX YAW  range where AS beam was visible = [-1.505, -1.225] - these extrema put the beam just outside of some aperture in the system -> set ITMX YAW to -1.365

ITMX PITCH range = [-0.7707, -0.9707] -> set to ITMX PITCH to -0.8707

Quote:

I spent some time tracking down the AS beam which had vanished from the AP table. Eventually, by dramatically mis-aligning SRM, PRM and ITMY, returning BS to its Jan 1st PITCH and YAW values and tweaking the ITMX alignment [actual values to follow], I was able to get an AS beam out onto the AP table. I verified that it was the prompt reflection off ITMX by watching it move as I changed the YAW of that optic and watching it stay stationary as I changed the YAW of ITMY.

Jamie and I then steered the beam through a 2" PLCX-50.8-360.6 lens and placed the RF PD (AS55) at the focus. Additionally, we installed the AS camera to observe the leakage field through a Y1S steering mirror (as shown in the attached diagram).

Currently the PD has power but the RF and DC outputs are not connected to anything at the moment.

Atm 2 by Steve

 

 

 

  1223   Mon Jan 12 18:53:03 2009 YoichiUpdateLSCAS CCD centering and ASDD demod phase
After Rob's AS beam work, I centered the beam on the AS CCD.
I also optimized the ASDD demod-phase for the MICH signal.
Rob suggested to me that whenever we restart or change the frequency of the DD Marconis, we have to re-optimize the demod-phase
because the initial phase of the Marconi is random. We had the power failure, so it was time to do so.
I confirmed that MICH hand-off from REFL33Q to AS133DDQ is ok.
I will do the same thing for the PRCL, SRCL hand-offs.
  1225   Tue Jan 13 18:59:09 2009 KakeruUpdateLSCAS CCD centering and ASDD demod phase
I tuned the demod-phase for PRCL and SRCL hand-off, but it have not been optimized enoughly.
I continue this work tomorrow.


Quote:
After Rob's AS beam work, I centered the beam on the AS CCD.
I also optimized the ASDD demod-phase for the MICH signal.
Rob suggested to me that whenever we restart or change the frequency of the DD Marconis, we have to re-optimize the demod-phase
because the initial phase of the Marconi is random. We had the power failure, so it was time to do so.
I confirmed that MICH hand-off from REFL33Q to AS133DDQ is ok.
I will do the same thing for the PRCL, SRCL hand-offs.
ELOG V3.1.3-