ID Date Author Type Categoryup Subject Text Attachments
  7307   Wed Aug 29 12:46:49 2012 SteveUpdateVACVent completed in 4 hrs 
 vent72.pngbeforeVentOpl.pngbeforeVent.png 
  7321   Thu Aug 30 19:08:08 2012 JenneUpdateVACDogs on BS, ITM chambers checkedI tightened as many of the dog clamps on
the bottom of the BS, ITMX and ITMY chambers
as I could find.  I used a torque wrench
  
  7327   Fri Aug 31 10:24:36 2012 SteveUpdateVACchamber dog clamps checked

    

       
            
  
  7342   Tue Sep 4 20:25:22 2012 jamieOmnistructureVACbetter in-air "lite" access connector neededWe really need something better to replace
the access connector when we're at air. 
This tin foil tunnel crap is dumb. 
  
  7343   Wed Sep 5 09:50:25 2012 SteveOmnistructureVACbetter in-air "lite" access connector needed

    

       
            
 IMG_1612.JPG 
  7344   Wed Sep 5 10:50:15 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

    

       
            
  
  7345   Wed Sep 5 13:11:43 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

    

       
            
  
  7432   Mon Sep 24 16:59:31 2012 JenneUpdateVACDoors on, ready to pump[The 40m Family]
The access connector and all heavy
doors are back on. 
  
  7434   Mon Sep 24 17:47:05 2012 SteveUpdateVAC ready to pump  The IFO will be at atmosphere 
overnight. The annuloses are pumped
down. The access connector jam nuts are tightened
  
  7438   Tue Sep 25 17:21:01 2012 SteveUpdateVACpumpdown completed IFO P1= 1mTorr,   CC1 =
5e-4 Torr.  The IFO is ready for work.
Be free to open the shutter and turn on HV
 pd73.pngpd73b.png 
  7441   Wed Sep 26 11:03:04 2012 SteveUpdateVACpumpdown completed The new cold cathode gauge CC1 is
in place. We were at atmosphere for 28 days
......more later
 40mpd73md1.png28datm.png 
  7454   Mon Oct 1 09:02:17 2012 SteveUpdateVACpumpdown reached vacuum normal

    

       
            
 pd73md6.pngpd73md6b.png 
  7461   Tue Oct 2 09:13:16 2012 SteveUpdateVACRGA scan at day 7

    

       
            
 pd73md7.png 
  7491   Fri Oct 5 14:40:55 2012 SteveUpdateVACRGA scan after power outage

    

       
            
 afterpoweroutaged10.pngpd73m10d.png 
  7545   Mon Oct 15 08:12:45 2012 SteveUpdateVACblank vac monitorVME
crate  blew its fuse and the fuse
housing is hard to access.
 blankvac.png 
  7547   Mon Oct 15 13:07:51 2012 jamieUpdateVACvacuum VME crate broken, replaced, minor vacuum mayhem ensuesSteve and I managed to access the fuse
in the vacuum VME crate, but replacing it
did not bring it back up.  We decided
  
  7549   Mon Oct 15 17:08:01 2012 SteveUpdateVACvacuum is back with some disabled valves

    

       
            
 VMEcrateout.pngIMG_1725.JPGwarning.pngshortcomings.jpg 
  7564   Wed Oct 17 08:04:31 2012 SteveUpdateVACRoughing pumps on for oil changePR1, PR2 and RP3 turned on for warming
up for oil change. Oil changed with 3.2L
of  MVT-19
  
  7582   Fri Oct 19 16:45:39 2012 SteveUpdateVACvent has started

    

       
            
  
  7584   Fri Oct 19 19:26:42 2012 JenneUpdateVACvent has started

    

       
            
  
  7587   Mon Oct 22 09:10:07 2012 SteveUpdateVAC@750Torr

    

       
            
 ventOct222012.png 
  7594   Tue Oct 23 08:45:00 2012 SteveUpdateVACvent day 3

    

       
            
 ventd4.pngIMG_1743.JPG 
  7597   Tue Oct 23 16:18:03 2012 SteveUpdateVACRoughing pumps on for oil change

    

       
            
 oilchange.jpg 
  7605   Wed Oct 24 09:15:12 2012 SteveUpdateVACvacuum rack 24V ps was current limited

    

       
            
 currentlimited24V.jpg 
  7669   Mon Nov 5 10:34:48 2012 SteveUpdateVACexisting vacuum documents

    

       
            
  
  7696   Mon Nov 12 09:21:10 2012 SteveUpdateVACpumpdown has startedI'm looking for IOO steering mirror power
supplies. I found two so far: one at 1Y3
as Kepco  + 75V and one at OMC_North
 beforepd.pngIMG_1800.JPGIMG_1801.JPG 
  7697   Mon Nov 12 16:52:03 2012 SteveUpdateVACpumpdown has completed The pressure is CC1 3e-4 Torr at
8 hours of pumping.  Status: vacuum
normal
 pd74.pngpd74at8h.png 
  7703   Tue Nov 13 08:34:11 2012 SteveSummaryVACpumpdown after 24days at atmosphere 
 
 pd74d1.png24datm.pngpdd1.png 
  7753   Tue Nov 27 09:44:09 2012 SteveUpdateVACpumpdown at 15 days It took 15 days to reach 1e-5 Torr
The RGA was turned on yesterday.
The rga scan plotting was not working. Den
 pd74m15d.pngpd74m15d_rga1d.png 
  7849   Tue Dec 18 10:43:20 2012 SteveUpdateVACvent has completed The 40m vacuum envelope is at atm   
It took 4.5 hours at ~3 Torr/min speed. Atm1
 
 vent74.pngbvent.pngbefVent.png 
  7853   Tue Dec 18 16:37:40 2012 SteveUpdateVAClast RGA scan before vent 
 
 pd74m36d.png36d_vacuum_normal.png 
  7856   Wed Dec 19 11:53:23 2012 SteveUpdateVACAC removed Koji, Manasa, Jenne, Jamie, Bob and
Steve
Access connector removed this morning
 workingatatm.png 
  7914   Thu Jan 17 17:04:49 2013 SteveUpdateVACvac monitor screen changedThe COVAC_MONITOR.adl was changed. Ion
pump labeled as disconnected means: ion pump
controller power turned off and ion pump
 screenmod.png 
  7936   Thu Jan 24 08:28:35 2013 SteveUpdateVACwhen to pumpdown ?Reminder: I will be on vacation next week.
We would have to put the access connector
in tonight if I'm pumping down Friday, tomorrow.
  
  7939   Thu Jan 24 14:40:09 2013 SteveUpdateVACRGA backgroung RGA background with VM2 open to Maglev
at day 37
 
 Screenshot.png 
  8057   Mon Feb 11 16:16:27 2013 SteveUpdateVAC55 days at atmoshereCP
Stat 100  sheet-covers were replaced
by clean ones on open chambers BS, ITMX,
 atm55d.png 
  8106   Tue Feb 19 08:42:31 2013 KojiUpdateVACETMX door open[Steve, Yuta, Koji]
The ETMX heavy door was removed.
  
  8129   Thu Feb 21 15:21:07 2013 yutaUpdateVACall heavy doors on, started pumping down annulus[Steve, Manasa, Jenne, Sendhil, Evan,
Yuta]
  
  8131   Thu Feb 21 18:01:27 2013 SteveUpdateVACpumpdown at 230 Torr 
 We are pumping down with RP1
& RP3 oily roughing pumps at 3 Torr/min
  
  8134   Thu Feb 21 21:12:42 2013 KojiUpdateVACpumpdown at 230 Torr[Rana, Yuta, Koji]
21:05 at the pressure of 10torr
V3 closed. RV1 manually closed. RPs
  
  8135   Fri Feb 22 08:01:25 2013 SteveUpdateVACpumpdown continuous 
 Pump
down is restarted after 10.5 hrs stop overnight.
 16hrs_pd75.png 
  8136   Fri Feb 22 11:12:16 2013 SteveUpdateVACpumpdown completed IFO   P1 pressure is 1
mTorr.  It is ready for high power light.
The Maglev took over the pumping
 mag60min.pngpd75at20h.png 
  8155   Mon Feb 25 08:22:03 2013 SteveUpdateVACpumpdown at day 4 All normal, IFO pressure 1.5e-5 Torr
RGA is pumped by TP-3 in back ground
mode.
 4d.png66d@atm.png 
  8206   Fri Mar 1 14:50:36 2013 SteveUpdateVACpumpdown day 8 Atm1, RGA background scan with TP3
pumping at day 7
Atm2,  IFO  CC1 = 1.1e-5
 bgTP3d7.pngRGAonIFO.png 
  8231   Tue Mar 5 14:59:32 2013 SteveHowToVACdry-forepump replacedTP3 turbo pump's dry-foreline pump was
replaced.
How to do it:
 changingforepump.pngTP3wFp600.jpg 
  8238   Wed Mar 6 08:40:03 2013 SteveUpdateVACfirst scan of this pumpdown Pumpdown 75 - Maglev - day 12
Precondition: 66 days at atm, installed
TIP-TILTs with coils that  replaced
 pd75m12d.pngpd75mRGA12d.png 
  8311   Tue Mar 19 17:00:14 2013 SteveUpdateVAClarge window quote of Cascade Optical quality 6.5" OD window specs
and quotes for vacuum view ports and optical
table enclosure are on the 40m wiki_ Aux
  
  8664   Mon Jun 3 09:46:40 2013 SteveUpdateVACRGA scan at day 100 Vacuum normal condition at pumdown
day 100
 
 d100Mpd75.pngd100Mpd75p.pngbadguys.png 
  8847   Mon Jul 15 14:12:15 2013 SteveUpdateVACRGA scan at day 144 Pumpdown 75, vacuum normal condition
at day 144
 
 pd75mRGA144d.pngpd75m144d.png 
  8904   Tue Jul 23 08:21:31 2013 SteveUpdateVACVent has started 
Thanks for the good preparation. 
IFO pressure P1=20 Torr 
 beforVent.pngstartVent.png 