16451
|
Fri Nov 5 12:49:32 2021 |
rana | Update | SUS | Setting up suspension test model | Please don't put it on c1sus2. Put
it on the completely independent test stand
as we discussed Wednesday. You must |
|
16452
|
Fri Nov 5 20:35:10 2021 |
Koji | Update | BHD | Feedthru / Optical Mounts | - New feedthrus [4xDB25 Qty 4 / 8xDB25
Qty 1] are placed on the wire shelf at the
entrance -> Jordan, please clean them. |
|
16456
|
Mon Nov 8 17:22:27 2021 |
Yehonathan | Update | BHD | SOS assembly | Big Gluing
Day |
 |
16457
|
Mon Nov 8 17:52:22 2021 |
Ian MacMillan | Update | SUS | Setting up suspension test model | [Ian, Tega]
We combined a controler and a plant
model into a single modle (See first attachment) |
|
16459
|
Tue Nov 9 11:11:37 2021 |
Yehonathan | Update | BHD | SOS assembly | The gluing was mostly successful. Only
two magnets didn't stick (see attachment). |
|
16465
|
Fri Nov 12 23:47:29 2021 |
Yehonathan | Update | BHD | SOS assembly | {Tega, Yehonathan}
First
attempt at the suspension of a Lambda Optic |
|
16470
|
Tue Nov 16 17:42:46 2021 |
Yehonathan | Update | BHD | SOS assembly | {Tega, Yehonathan}
Another
attempt at the suspension of a Lambda Optic |
    |
16471
|
Tue Nov 16 18:28:53 2021 |
Koji | Update | BHD | SOS assembly | Yehonathan told me that the wires
are touching between the clamps!
I went back to the CAD and confirmed |
 |
16472
|
Wed Nov 17 07:32:48 2021 |
Chub | Update | General | wire clamp plate mod | This will be difficult to modify with the
magnets and dumbells in place. Even
if someone CAN clamp this piece into an endmill |
|
16473
|
Wed Nov 17 11:53:27 2021 |
Koji | Update | General | wire clamp plate mod | Of course, we remove the magnet-dumbbell
for machining. After that the part will be
cleaned/baked again. And Yehonathan is going |
|
16474
|
Wed Nov 17 17:37:53 2021 |
Anchal | Update | General | Placed Nodus and fb1 on UPS power | Today I placed nodus and fb1 on UPS battery
backed supply. Now power glitches should
not hurt our cds system. |
|
16476
|
Thu Nov 18 15:16:10 2021 |
Anchal | Update | General | Moved Chiara to 1X7 above nodus powered with same UPS | [Anchal, Paco]
We moved chiara to 1X7 above nodus
and powered with same UPS from a battery |
|
16479
|
Mon Nov 22 17:42:19 2021 |
Anchal | Update | General | Connected Megatron to battery backed ports of another UPS | [Anchal, Paco]
I used the UPS that was providing
battery backup for chiara earlier (a APS |
|
16480
|
Tue Nov 23 18:02:05 2021 |
Anchal | Update | IMC | MC autolocker shifted to python3 script running in docker | I finished copying over the current autolocker
bash script functionality into a python script |
|
16483
|
Wed Nov 24 14:15:15 2021 |
Yehonathan | Update | BHD | SOS assembly | Late update. We got 2 modified side blocks
from Jordan a few days ago. Yesterday, I
glued a side magnet to one of the modified |
|
16484
|
Wed Nov 24 14:34:15 2021 |
Yehonathan | Update | BHD | Saving on SUSAUX slow channels | Koji found out that the stock for BIO Acromag
modules is very low and that the lead time
for ordering new ones is ~ 1-year X-o. |
|
16488
|
Tue Nov 30 17:11:06 2021 |
Paco | Update | General | Moved white rack to 1X3.5 | [Paco, Ian, Tega]
We moved the white rack (formerly
unused along the YARM) to a position between |
 |
16489
|
Wed Dec 1 12:57:08 2021 |
Yehonathan | Update | BHD | SOS assembly | {Yehonathan, Tega}
We glued some magnets onto modified
side blocks. We followed pretty much the |
7x |
16490
|
Mon Dec 6 14:26:52 2021 |
Koji | Update | VAC | Pumping down the RGA section | Jordan reported that the RGA section needs
to be pumped down to allow the analyzer to
run at sufficiently low pressure (P<1e-4 |
|
16491
|
Mon Dec 6 18:23:04 2021 |
Yehonathan | Update | BHD | SOS assembly | I installed OSEMs on the LO1 SOS. To my
surprise, the side magnet is not in the center
of the side OSEM. It completely misses the |
|
16493
|
Tue Dec 7 13:12:50 2021 |
Koji | Update | VAC | Pumping down the RGA section | So that Jordan can run the RGA scan this
afternoon, I ran TP3 and started pumping
down the RGA section. |
|
16494
|
Wed Dec 8 10:14:43 2021 |
Jordan | Update | VAC | Pumping down the RGA section | After an overnight pumpdown/RGA warm up,
I took a 100 amu scan of the RGA volume and
subsequent pumping line. Attached is a screenshot |
 |
16495
|
Thu Dec 9 00:32:56 2021 |
Tega | Update | CDS | New SUS medm screen update | The new SUS screen can be reached via sitemap
-> IFO SUS button -> NEW
ETMX dropdown menu link. Please use and provide |
 |
16496
|
Thu Dec 9 18:22:36 2021 |
Tega | Update | CDS | New SUS medm screen update | Work on the medm screen for SUS RMS
monitor is ongoing. The next step would
be to incorporate this into the |
|
16497
|
Thu Dec 9 21:57:35 2021 |
Yehonathan | Update | BHD | SOS assembly | {Yehonathan, Tega}
We took the optic out of the SOS
tower and removed the side blocks. We mounted |
 |
16499
|
Fri Dec 10 15:59:23 2021 |
Paco | Update | BHD | Finished Coil driver (even serial number) units tests | [Paco, Anchal]
We have completed modifications
and testing of the HAM Coil driver D1100687 |
|
16500
|
Fri Dec 10 18:55:58 2021 |
Tega | Update | CDS | New SUS medm screen update | Turns out the BLRMS monitoring channels
for MC1, MC2, MC3, ITMY and SRM already exist
in c1pem. So I modified the new SUS screen |
|
16501
|
Fri Dec 10 19:22:01 2021 |
Koji | Update | VAC | Pumping down the RGA section | The scan result was ~x10 higher than the
previously reported scan on 2020/9/15 (https://nodus.ligo.caltech.edu:8081/40m/15570), |
|
16503
|
Mon Dec 13 15:05:47 2021 |
Tega | Update | PEM | git repo for temp sensor and sus medm | [temperature sensor]
git repo: https://git.ligo.org/40m/tempsensor.git
todo |
|
16504
|
Tue Dec 14 11:33:29 2021 |
Tega | Update | PEM | git repo for temp sensor and sus medm | [Temperature sensor]
Added new temp EPICs channels to
database file (/cvs/cds/caltech/target/c1pem1/tempsensor/C1PEMaux.db) |
|
16505
|
Tue Dec 14 14:02:33 2021 |
Yehonathan | Update | BHD | SOS assembly | {Yehonathan, Paco}
I fixed the overall height of the
adapter (attachment 1). I put an OSEM next |
 |
16506
|
Tue Dec 14 19:29:42 2021 |
Paco | Update | BHD | 1Y0 rack work for LO1 | [Paco]
Two coil drivers have been installed
on 1Y0 (slots 6, 7, for LO1 SOS). All connections |
|
16507
|
Wed Dec 15 13:57:59 2021 |
Paco | Update | Computers | upgraded ubuntu on zita | [Paco]
Upgraded zita's ubuntu and
restarted the striptool script. |
|
16508
|
Wed Dec 15 15:06:08 2021 |
Jordan | Update | VAC | Vacuum Feedthru Install | Jordan, Chub
We installed the 4x DB25 feedthru
flange on the North-West port of ITMX chamber |
|
16511
|
Wed Dec 15 22:09:53 2021 |
Yehonathan | Update | BHD | SOS assembly | {Paco, Yehonathan, Anchal}
I cut the wires from the winches
and removed the winch adapter plate. I engrave |
|
16512
|
Thu Dec 16 12:21:16 2021 |
Anchal | Update | BHD | Coil driver test failed for S2100619-v1 | Today I found one of the coil driver boards,
S2100619
failed the test on CH2. There appears to |
|
16513
|
Thu Dec 16 15:04:12 2021 |
Chub | Update | Electronics | ITMX feedthroughs and in-vac cables installed | The ITMX 10" flange with four DSUB-25
feedthroughs has been install with the cables
connected at the in-vac side. See photo; |
|
16514
|
Thu Dec 16 15:32:59 2021 |
Anchal | Update | BHD | Finished Coil driver (odd serial number) units tests | We have completed modifications and testing
of the HAM Coil driver D1100687 units with
serial numbers listed below. The DCC |
|
16515
|
Thu Dec 16 15:54:08 2021 |
Koji | Update | Electronics | ITMX feedthroughs and in-vac cables installed | Thanks for the installation.
With regard to the connector convention,
let's use the attached arrangement so |
|
16516
|
Thu Dec 16 17:41:12 2021 |
Koji | Update | BHD | Coil driver test failed for S2100619-v1 | Good catch. It turned out that the both
+ and - side of the output stages for CH2
were oscillating at ~600kHz. If I use a capacitance |
6x |
16517
|
Thu Dec 16 17:57:17 2021 |
Anchal | Update | BHD | Finished Coil driver (odd serial number) units tests | S2100619 was fixed
by Koji and it passed the test after
that. |
|
16518
|
Thu Dec 16 18:16:36 2021 |
Yehonathan | Update | BHD | SOS assembly | Today I glued magnets onto the new 3/4"
mirror adapters. I also took the opportunity
to make some more side magnets assemblies. |
   |
16519
|
Fri Dec 17 12:32:35 2021 |
Koji | Update | SUS | Remaining task for 2021 | Anything else? Feel free to edit this entry.
- SUS: AS1 hanging
- SUS: PR3/SR2/LO2 3/4" thick |
|
16520
|
Fri Dec 17 17:50:17 2021 |
Yehonathan | Update | BHD | SOS assembly | I threaded a new wire through a different
side block with a magnet and clamped it under
a microscope. It was hard, but eventually, |
   |
16521
|
Fri Dec 17 19:16:45 2021 |
Koji | Update | BHD | SOS assembly | We @40m do the convention of the arrow
at the thinnest side & pointing the HR
side, but nobody says Lambda does the same. |
|
16522
|
Fri Dec 17 19:19:42 2021 |
Koji | Update | SUS | Remaining task for 2021 | I had the fear that any mistake in the
electronics chain could have been the show
stopper. |
|
16523
|
Fri Dec 17 22:16:07 2021 |
Yehonathan | Update | BHD | SOS assembly | I specifically checked the specification
before mounting the mirror. It says clearly
"Arrow at the thinnest location pointing |
|
16524
|
Sat Dec 18 00:56:14 2021 |
Koji | Update | BHD | SOS assembly | Sad... We just need to check the wedge
direction everytime, unfortunately.
Pencil: can you try to gently wipe |
|
16525
|
Sun Dec 19 07:52:51 2021 |
Anchal | Update | SUS | Remaining task for 2021 | The I/O chassis reassigns the ADC and DAC
indices on every power cycle. When we moved
it, it must have changed it from the order |
|
16526
|
Mon Dec 20 13:52:01 2021 |
Koji | Update | BHD | SOS assembly | LO1: No need to remove
the pencil mark for the damping test. Until
we see serious contamination on the LO1 optic, |
|