Wed Oct 31 17:54:25 2018, gautam, Update, VAC, CC1 hornet power connection restored
|
Tue Nov 6 23:19:06 2018, gautam, Update, VAC, c1vac1 FAIL lights on (briefly) 
|
Wed Nov 7 08:32:32 2018, Steve, Update, VAC, c1vac1 FAIL lights on (briefly)...checked
|
Tue Nov 13 16:15:01 2018, Steve, Update, VAC, rga scan pd81 at day 119 
|
Fri Nov 16 10:26:12 2018, Steve, Update, VAC, single viton O-rings
|
Fri Nov 16 15:09:31 2018, Steve, Configuration, VAC, not venting cryo and ion pumps
|
Mon Nov 19 14:59:48 2018, Chub, Update, VAC, Vent 81
|
Mon Nov 19 17:09:00 2018, Steve, Update, VAC, Vent 81 
|
Mon Nov 19 22:01:50 2018, gautam, Update, VAC, Loose nut on valve
|
Tue Nov 20 13:13:01 2018, gautam, Update, VAC, IMC alignment is okay
|
Mon Nov 26 15:58:48 2018, Steve, Update, VAC, Vent 81
|
Tue Nov 27 17:06:51 2018, Steve, Configuration, VAC, Agilent 84FS turbo installed as TP2
|
Wed Dec 19 14:19:15 2018, Koji, Summary, VAC, Plan for pumpoing down test
|
Wed Dec 19 21:14:50 2018, gautam, Update, VAC, Pumpdown tomorrow
|
Thu Dec 20 08:38:27 2018, Jon, Update, VAC, Pumpdown tomorrow
|
Thu Dec 20 10:28:43 2018, gautam, Update, VAC, Heavy doors back on for pumpdown 82
|
Fri Dec 21 11:13:13 2018, gautam, Omnistructure, VAC, N2 line valved off 
|
Fri Dec 21 12:57:10 2018, Koji, Omnistructure, VAC, N2 line valved off
|
Thu Jan 3 15:08:37 2019, gautam, Omnistructure, VAC, Vac status unknown  
|
Fri Jan 4 10:25:19 2019, Jon, Omnistructure, VAC, N2 line valved off
|
Wed Jan 9 11:07:09 2019, gautam, Update, VAC, New Vac channel logging
|
Wed Jan 9 20:01:25 2019, Jon, Update, VAC, Second pumpdown completed 
|
Thu Jan 10 10:23:46 2019, gautam, Update, VAC, overnight leak rate
|
Thu Jan 10 11:32:40 2019, Chub, Update, VAC, Manual valve interfaced with CDS
|
Thu Jan 10 19:59:08 2019, Jon, Update, VAC, Vac System Running Normally on Turbo Pumps  
|
Mon Jan 14 10:06:53 2019, gautam, Update, VAC, Vent 82 complete
|
Fri Jan 18 17:44:14 2019, gautam, Update, VAC, Pumping on RGA volume
|
Sun Jan 20 23:41:00 2019, Jon, Omnistructure, VAC, Notes on vac serial comm, adapter wiring
|
Tue Jan 22 20:45:21 2019, gautam, Update, VAC, New N2 setup
|
Fri Jan 25 16:14:51 2019, gautam, Update, VAC, Vacuum interlock code, N2 warning
|
Sat Feb 2 21:53:24 2019, Koji, Update, VAC, overnight leak rate
|
Sun Feb 3 15:15:21 2019, gautam, Update, VAC, overnight leak rate 
|
Sun Feb 3 20:52:34 2019, Koji, Update, VAC, overnight leak rate
|
Mon Feb 4 12:23:24 2019, gautam, Update, VAC, pumpdown 83 - leak tests
|
Tue Feb 5 10:11:30 2019, gautam, Update, VAC, leak tests complete, pumpdown 83 resumed 
|
Tue Feb 5 19:30:14 2019, gautam, Update, VAC, Main volume at 20 uTorr
|
Thu Feb 7 13:55:25 2019, gautam, Update, VAC, RGA turned on
|
Thu Feb 7 19:28:46 2019, gautam, Update, VAC, IFO recovery
|
Thu Feb 14 15:37:35 2019, gautam, Update, VAC, Vacromag failure  
|
Thu Feb 14 18:16:24 2019, Jon, Update, VAC, Vacromag failure
|
Fri Feb 15 11:58:45 2019, Jon, Update, VAC, Vac system is back up
|
Fri Feb 15 18:41:18 2019, rana, Update, VAC, Vac system is back up
|
Fri Feb 15 19:50:09 2019, rana, Update, VAC, Vac system is back up
|
Fri Feb 15 20:07:02 2019, Jon, Update, VAC, Updated vacuum punch list
|
Fri Feb 15 21:15:42 2019, gautam, Update, VAC, dd backup of c1vac made
|
Wed Mar 20 12:31:30 2019, Jon, Update, VAC, Doing vac controls work
|
Wed Mar 20 19:26:25 2019, Jon, Update, VAC, Protection against AC power loss
|
Wed Mar 20 20:07:22 2019, Jon, Update, VAC, Doing vac controls work
|
Thu Mar 21 12:46:22 2019, Jon, Update, VAC, More vac controls upgrades
|
Thu Mar 21 17:22:52 2019, Jon, Update, VAC, More vac controls upgrades
|
|