40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 335 of 348  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authorup Type Category Subject Text Attachments
  8240   Wed Mar 6 11:33:09 2013 steveUpdateSAFETYsafety audit 2013 
         
           
 IMG_0010.JPG 
  8287   Wed Mar 13 16:04:24 2013 steveUpdateSAFETYlaser safety glasses checked All safety glasses were cleaned in
soapy water by Bob. I measured their transmission
at 1064 nm, 150 mW,  beam diameter 1.5
 safetyglasseschecked.jpg 
  8309   Tue Mar 19 10:30:00 2013 steveUpdateSAFETYcrane inspection 2013 
Professional crane inspector: Fred
Goodbar found two small leaks at the Vertex
 sippingOIL.jpg03191301.PDF 
  8661   Fri May 31 10:25:17 2013 steveUpdatesafetyfirst aid kits refilled

    

       
            
 refilledFAidK.jpg 
  8687   Thu Jun 6 16:33:19 2013 steveUpdatesafetyupdated laser inventory Updated laser inventory and operator
list. They are posted in the 40m wiki and
entry doors of the 40m IFO room.
 ELSOconnected.jpg 
  9090   Fri Aug 30 08:08:29 2013 steveUpdatesafetyfire horns-flashers tested OK 
 We had fire alarm tests
 and evacuation drills at 1:30pm yesterday.
  
  9653   Wed Feb 19 08:07:01 2014 steveUpdatesafetyannual laser safety glasses check  
 All 40m laser safety glasses
are cleaned and measured this morning. 
 AA2014checked.jpg2014check.jpg 
  9672   Tue Feb 25 16:54:57 2014 steveUpdatesafetysafety audit 2014 
 We had our annual safety inspection
today.  
  
  9681   Thu Feb 27 13:11:13 2014 steveUpdatesafetysafety audit correction

    

       
            
 noDaisyChaining.jpgZbThumbnail.info 
  9699   Thu Mar 6 11:43:17 2014 steveUpdateGeneralGuralp control unitCMG-40T handheld controller unit is missing
its power supply. In order to zero the instrument
one has to apply plus and minus DC voltage.
 GuralpCU.jpgBAH.jpg 
  9704   Fri Mar 7 16:56:17 2014 steveUpdateIOOIOO qpds centered

    

       
            
 IOOqpdCentered.png 
  9705   Mon Mar 10 09:28:48 2014 steveUpdateIOOIOO pointing 2 days Morning seconds without adjustment.
 
 IOOpointing2d.pngmorningseconds.png 
  9725   Thu Mar 13 16:05:48 2014 steveUpdatesafetysafety audit 2014

    

       
            
 T1400198-v1-CIT-LIGO_Labs_Annual_Safety_Audit_2014.pdf 
  9730   Mon Mar 17 10:50:58 2014 steveUpdatesafety2014 annual crane certification

    

       
            
 2014craneCert.jpg 
  9743   Fri Mar 21 14:59:44 2014 steveUpdatePEMcontroling dustPlease take a look at the table top with
the flashlight before
 IMG_0044.JPG 
  9748   Mon Mar 24 22:13:37 2014 steveUpdateGeneralPower Failure

    

       
            
 poweroutage.png 
  9749   Tue Mar 25 14:52:57 2014 steveUpdateVACvacuum is recovered Out
gassing plus leak rate   0.15 
 17hrsNoPumping.png 
  9757   Fri Mar 28 16:26:20 2014 steveUpdateVACRGA scan after power failure

    

       
            
 afterPowerFailure.png 
  9802   Fri Apr 11 14:57:53 2014 steveUpdateLSCcongratulation 
 
 whenSheisHappy3h.pngmc4hArms3hrs.png 
  9870   Mon Apr 28 17:27:29 2014 steveUpdatesafetysafety audit 2014

    

       
            
  
  9873   Tue Apr 29 00:11:03 2014 steveUpdatesafetysafety audit 2014Be aware that
this may affect POP QPD and POP RF Thorlabs
  
  9895   Thu May 1 17:14:36 2014 steveUpdatePSLthin window AR measuredCVI broadband AR coating was measured at
the PSL-enclosure table around 9-10am today.
The 2W Innolight first PBS  S polarization
  
  9900   Fri May 2 08:15:54 2014 steveUpdatesafetysafety audit 2014 
 Late adition: CHECK all viewport covers.
 solidCoverRequired.jpg 
  9902   Fri May 2 10:38:29 2014 steveUpdatePSLthin window AR measured

    

       
            
  
  9914   Tue May 6 09:46:50 2014 steveUpdatePEMcleaning day Keven and Steve,
We cleaned around the Vertex chambers,
PSL and MC2 floor areas.
 120d.png 
  9915   Tue May 6 10:22:28 2014 steveUpdateCDSc1ioo dolphin fiber

    

       
            
 dolphin1x2.png 
  9918   Tue May 6 18:32:14 2014 steveUpdateLSCTRY 60Hz noise huntThis
is an effort to get rid of our ground loops
 ETMY-ISCT_EISOL.jpg 
  9921   Wed May 7 14:01:36 2014 steveUpdateLSCTRY 60Hz noise hunt

    

       
            
  
  9933   Thu May 8 17:25:17 2014 steveUpdateLSCTRY 60Hz noise hunt I
worked at the ETMY-ISCT this morning and
  
  9937   Fri May 9 11:23:11 2014 steveUpdateGreen Lockingdecreased X green light power Green light power decreased from 3 mW to
1 mW at the ETMX-ISCT shutter. More later.
  
  9941   Mon May 12 14:42:25 2014 steveUpdateendtable upgradeoptical table enclosure wall proposal and table at ETMY

    

       
            
 Hilite70.jpgETMY-ISCT.jpgRoscoThermashield.pdf 
  9965   Fri May 16 16:08:12 2014 steveUpdateLSCIsolating base plates Electronic components should be ISOLATED
as they are installed on the optical tables.
This is essential to avoid ground
 ISObaseplates.jpg 
  10007   Mon Jun 9 09:41:06 2014 steveUpdatesafetysafety training2014 surf students Nichin and Akhil received
40m specific basic safety training last week.
 2014surfs.jpg 
  10069   Thu Jun 19 10:39:22 2014 steveUpdatesafetysurf safety training 
 Andres Medina and Andrew "Harry"
Hall received 40m specific safety training.
 2014surfsAA.jpg 
  10071   Thu Jun 19 14:12:45 2014 steveUpdatesafetyoptical table scans 
 PSL, AP, ETMY and ETMX optical
tables were scanned for stay beam.
  
  10075   Thu Jun 19 17:11:52 2014 steveUpdatePEMit is warmer today The PSL HEPA was running at 30VAC-variac.
It is 1 degree C warmer than usual. The HEPA
fan motor turned up to 60 V
 warmertoday.png 
  10081   Fri Jun 20 14:42:57 2014 steveUpdateSUSvac illuminators turned off    
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework   8days.png 
  10350   Fri Aug 8 11:22:35 2014 steveSummarySUSoplev laser summary 
         
        2005             
  
  10362   Mon Aug 11 10:23:39 2014 steveSummarySUSoplev laser summary updated

    

       
            
  
  10518   Thu Sep 18 10:08:07 2014 steveSummarySUSoplev laser summary updated 




  
  10523   Mon Sep 22 10:18:58 2014 steveUpdatePEMlab temperatures 
 
 summerheat.png 
  10560   Thu Oct 2 14:36:52 2014 steveUpdatePEMoil drops on vertex crane

    

       
            
 VertexOilDrops.jpg 
  10665   Tue Nov 4 10:40:46 2014 steveUpdatePEMlab temperatures and particle counts 
 
 PEM100d.png 
  10761   Mon Dec 8 09:03:49 2014 steveUpdatePEMair cond maintenance tomorrow morning 
 AC maintenance is scheduled
from 8am till 11am tomorrow morning.
  
  10773   Wed Dec 10 14:26:13 2014 steveUpdatePEMair cond maintenance and particle plot

    

       
            
 05.png 
  11083   Fri Feb 27 10:25:24 2015 steveUpdateCamerasquad picture problemMUX input 7 to ITMXF camera cable was replaced
by temporary cable labeled as 888

The problem remains to be the same
 quadMUX.jpg 
  11148   Thu Mar 19 17:11:32 2015 steveSummarySUSoplev laser summary updated          
March  19, 2015   2 
new  JDSU 1103P, sn P919645 & P919639
  
  11178   Fri Mar 27 10:38:40 2015 steveUpdateVACvac rack UPS battery replacedBatteries replaced after 3.5 years with
Amstron AP-1250F2,  8x 12V 6Ah

 UPSvac.jpg 
  11227   Mon Apr 20 16:42:48 2015 steveUpdateSUSPRM and BS oplev laser replacedThe laser below is dead. JDSU 1103P, SN
P845655 lived for 3.5 years.

 newOplevLaser.png 
ELOG V3.1.3-