Entry  Fri Jun 20 01:38:55 2008, rana, Update, PEM, 20 day Weather test.png
Yoichi showed me that its possible to make PNG images from PS using GS:

[CODE]gs -sDEVICE=png16m -sOutputFile=foo.png bar.ps[/CODE]
Entry  Wed Jan 14 02:11:07 2015, rana, Summary, Treasure, 2-loop Algebra Loopology FSSloop.pdfFSSloop.png
I show here the matrix formalism to calculate analytically the loop TF relationships for the IMC w/ both FSS actuators so
that it would be easier to interperet the results.

The attached PDF shows the Mathematica notebook and the associated block diagram.

In the notebook, I have written the single hop connection gains into the K matrix. P is the optical plant, C is the Common electronic gain, F
Entry  Thu Nov 11 00:11:39 2021, Koji, Summary, SUS, 2" to 3" sleeve issue 6x
Yehonathan and Tega found that the new PR3 and SR3 delivered in 2020 is in fact 3/4" in thickness
(!). Digging the past email threads, it seems that the spec was 10mm but the thickness was increased for better relieving the residual stress by the coatings.

There are a few issues.
Entry  Wed Aug 25 08:53:33 2021, Jordan, Update, SUS, 2" Adapter Ring for SOS Arrived 8/24/21 20210824_152259.jpg20210824_152259.jpg20210824_152308.jpg
8 of the 2"->3" adapter rings (D2100377) arrived from RDL yesterday. I have not tested the threads but dimensional inspection on SN008 cleared.
Parts look very good. The rest of the parts should be shipping out in the next week.
Entry  Wed Sep 29 09:36:26 2021, Jordan, Update, SUS, 2" Adapter Ring Parts for SOS Arrived 9/28/21 20210929_092418.jpg
The remaining machined parts for the SOS adapter ring have arrived. I will inspect these today and get them ready for C&B.
Entry  Mon Aug 11 00:58:31 2008, rana, Update, PEM, 2 years of temperature trend Untitled.png
The PSL RMTEMP alarmed again because it says the room temperature is 19.5 C. Steve said in
an earlier log entry that this is a false alarm but he didn't say why he thought so...
    Reply  Mon Aug 11 09:39:29 2008, rana, Update, PEM, 2 years of temperature trend 
Steve and I went around and inspected and then adjusted the thermostats and [FONT=Comic Sans MS]humidostats[/FONT].

All the thermostats were set at 70F in 2005 by Steve. We adjusted the ones on the arms up to 72F
Entry  Wed Nov 2 10:41:47 2011, steve, Update, General, 2 spare heliax at the LSC rack 
They were traced and labeled. One goes to 1X2 and the other to AS-ISCT. They are Andrew Heliax 1/4" od. made by CommScone,  model number FSJ1-50A
    Reply  Thu Apr 14 10:18:35 2022, Paco, Summary, BHD, 2 in oplev mirrors incompatible with LMR2V 
[Paco, JC]

We realized the 2 in oplev mirrors (Thorlabs BB2-E02) for ITMYOL, SRMOL, and BSOL, are 0.47 in thick, while the LMR2V fixed mount is 0.46 in
deep, even without taking the retaining ring into account. After a brief exchange with Koji, and Ian, we decided to glue the mirrors onto the mounts using
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday, and finished on Tuesday.
Entry  Wed Mar 31 16:55:05 2010, josephb, Update, Computers, 2 computers from Alex and Rolf brought to 40m 
I went over to Downs today and was able to secure two 8 core machines, along with mounting rails.  These are very thin looking 1U chassis computers.
I was told by Rolf the big black box computers might be done tomorrow afternoon.  Alex also kept one of the 8 core machines since he needed to replace
a hard drive on it, and also wanted to keep for some further testing, although he didn't specify how long.
Entry  Wed Mar 5 11:33:10 2014, Koji, Summary, LSC, 2 arm ALS->LSC transition - road map 
Step by step description of transition from 2arm ALS to Common/Differential LSC for FPMI
- Step 0: Place the frequencies of the arm green beams at the opposite side of the carrier green.
- Step 1: Activate stablization loops for ALSX and ALSY simultaneously. 
Entry  Fri Jun 22 02:21:57 2012, Jenne, Update, Green Locking, 2 arm ALS - Success!!!! P6210140.AVIspeedy_gonzales-5257.jpg
[Yuta, Jenne]
We locked both arms using the ALS system simultaneously!  Hooray!
Video of spectrum analyzer during lock acquisition of both beats is attached.
    Reply  Fri Jun 22 03:37:42 2012, Koji, Update, Green Locking, 2 arm ALS - Success!!!! 
Are these correct?
1. It is a nice work.
2. This is not locking, but stabilization of the both arms by ALS.
    Reply  Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!! 
Answers to questions from Koji.

Are these correct?
Entry  Mon Jul 26 20:30:35 2010, Jenne, Update, SUS, 2 Tip Tilts suspended and balanced 
[Koji, Jenne]
We were on Team Cleanroom, while Kiwamu and Alberto were on Team Chamber.  Team Cleanroom suspended and
balanced 2 Tip Tilts this afternoon.
Entry  Fri Feb 5 14:31:46 2010, Jenne, Update, SUS, 2 SOS towers assembled DSC_1156.JPG
[Jenne, Kiwamu]
The 2 SOS towers for the ITMs have been assembled, and are on the flow bench in the cleanroom.  Next up is to glue magnets, dumbells, guiderods
and wire standoffs to the optics, then actually hang the mirrors.
Entry  Fri Jun 17 00:17:26 2011, rana, Configuration, Electronics, 2 RFPDs sent to LLO P1070895.JPG
Koji and I found 2 RFPD boxes to send to LLO. We've put them onto Steve's desk to be overnighted to Valera.
One of them is our old 21.5 MHz gold box RFPD from the FSS (which we don't use). The other one is a 2mm gold box one which was previously tuned
for 66 MHz.
Entry  Tue Mar 3 11:39:50 2009, Osamu, DAQ, Computers, 2 PCs in Martian 
 Kiwamu and I brought 2 SUPER MICRO PCs from Willson house into 40m.
Both PCs are hooked up into Martian network. One is named as bscteststand for BSC which has been set up by Cds people and another one is named
kami1 for temporary use for CLIO which is a bland new, no operating installed PC. This bland new PC will be returned Cds or 40m once another new PC which
Entry  Fri Sep 14 01:18:51 2012, rana, Update, COC, 2 Layout Changes 
After looking at the in-vacuum layout I think we should make two changes during
the next vent:
1) Reduce the number of mirrors between the FI and its camera. We install a large silvered mirror in the vacuum flange which holds the Faraday
    Reply  Mon Sep 17 18:04:01 2012, Steve, Update, COC, 2 Layout Changes IMG_1635.JPG


    
        
            Quote:
        
        
            

           After looking at the in-vacuum layout I think we should make two
Entry  Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models LockinRoll.png
(Suresh, Koji, Yuta)

Background:
Entry  Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned 
[Koji, Jenne, Kiwamu]
This is to describe the work that went on in the Cleanroom today.  Kiwamu's entry will detail the tidbits that happened in the chamber.
We engraved the periscope mounts with the mirror info for the mirrors which were placed in the periscope.  We also engraved the barrels of
    Reply  Thu Feb 21 19:55:46 2008, rana, Update, Electronics, 2 BNC Cables, 1 Tee 
I'm not sure where [COLOR=purple]Ward and Miller went to Analyzer school[/COLOR], but it was probably uncredited.
I turned it on and used 2 BNC cables and a T to hook up the source to the 2 inputs and measured the always-exciting TF of cable.
Entry  Thu Oct 25 21:02:34 2012, Den, Update, PEM, 1x7 dc power DSC_4779.JPG
 We now stop using bench DC power supplies for microphone preamp and PEM AA board. DC power is wired from 1x5 rack suppliers. I've installed a beam
to mount fuse houses in the 1x7 as we did not have one.
Entry  Tue Dec 6 02:57:44 2011, kiwamu, Update, Green Locking, 1st trial of handing off YarmALS.png
I succeeded in handing off the servo from that of the ALS to IR-PDH.
However the handing off was done by the coarse sensor instead of the fine sensor because I somehow kept
failing to hand off the sensor from the coarse to the fine one.
Entry  Mon Apr 29 18:53:03 2013, Jenne, Update, Electronics, 1pps timing fiber to OMC rack may be bent 
While helping Riju out this afternoon, I noticed that the timing fiber that goes to the OMC rack (near the AP table) was bent, and is now possibly kinked,
after the installation of the fiber splitter box. 
The fiber was hanging from the back of the rack, and had been strain relieved.  However, the path that the fiber was taking is now occupied
Entry  Sun Jun 29 18:58:43 2008, rana, Summary, Computers, 1e20 is too big for AWG and/or IOVME 
While testing out my matlab/awgstream based McWFS diagnostic script I accidentally put a
huge excitation into [CODE]C1:IOO-WFS1_PIT_EXC[/CODE]. This went to 1e20 and then caused
some SUS to trip and c1susvme2 to go red. I tried booting it via the normal procedures
Entry  Tue Nov 3 12:47:01 2009, Koji, Configuration, CDS, 1Y9 Rack configuration update 
For the CDS upgrade preparation I put and moved those stuff at the rack 1Y9:
Placed 1Y9-12 ADC to DB44/37 Adapter LIGO D080397
Placed 1Y9-14 DAC to IDC Adapter LIGO D080303
Entry  Mon Sep 15 14:00:52 2008, josephb, Configuration, Computers, 1Y9 Hub and C1asc 
The 1Y9 switch is now using a labeled Cat6 cable in cable trays to connect to the main switch in the offices.  In addition, the c1asc cable which had been
coming out the door was fixed last Friday, and is now labeled, going out the top and connects to the hub in 1Y2.
    Reply  Fri Aug 16 16:40:04 2019, gautam, Update, CDS, 1Y3 work newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png
[chub, gautam]

Installation: The following equipment were installed in 1Y3, see Attachment #1:
Entry  Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered 
I temporarily turned off the power to the 1Y2 rack this morning while wiring in the binary output adapter board power (+/- 15V) into the cross connects.
The board is now powered and we can proceed to testing if can actually control the LSC whitening filters.
    Reply  Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed 1Y2_5V_Fuse.JPG
Incidentally, a blown fuse on 5V line at 1Y2 rack was found during the intallation of Sorensens.
The fuse (5A 125V) has been replaced and fixed.
When I plugged the fuse in, I heard some sound like relays were switched. Are there any relays in the LSC rack?
    Reply  Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed 
[Paco, Chub]

Removed all sorensen power supplies from this rack except for 12 VDC one; that one got pushed to the top of the rack and is still powering the
cameras.
    Reply  Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed 40m_BHD.png
Updated the rack layout. Now there is an issue.
We were supposed to have 1U space at the top, but it was occupied by the 12V.
We need to either lower the c1sus2 and IO chassis 1U or move the Sorensen at the bottom.
    Reply  Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras 
[Paco, Anchal]

In reference to Koji's concern (see previous elog), we have completely removed sorensen power supplies from 1Y1. We added a 12 Volts / 2
Amps AC-to-DC power supply for the cameras and verified it works. We stripped off all unused hardware from shutters and other power lines in the strips,
    Reply  Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3 
[Paco, Anchal]

Continued working on 1Y1 rack. Populated the 6 coil drivers, made all connections between sat amp, AA chassis, DAC, and ADC adapters for SR2,
PR2, and PR3 suspensions. Powered all boxes and labeled them and cables where needed. Near the end, we had to increase the current limit on the positive
    Reply  Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work 
[paco, ian]

After the new 1Y0 rack was placed near the 1Y1 rack by Chub and Anchal, today we worked on the 1Y1 rack. We removed some rails from spaces ~
25 - 30. We then drilled a pair of ~ 10-32 thru-holes on some L-shaped bars to help support the c1sus2 machine weight. The hole spacing was set to 60 cm;
    Reply  Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work 
I have visited the binder file for the 40m wiring file in the control room.
The 12V power supply on 1Y1 is for the CCD cameras. So we still want to keep the 12V 0.8A power and the side connections for these. It is
not necessary to be Sorensen. Can we replace it with an AC-DC adapter with +12V/1A for example? BTW, the video matrix and quads are AC-powered.
Entry  Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE. RemovedStuff.jpeg1Y1.jpeg1Y3.jpeg
[Anchal, Paco]

We cleared 1Y1 rack today removing the following items. This stuff is sitting on the floor about 2 meters east of 1Y3 (see attachment 1):


A VME crate: We disconnected it's power cords from the side bus.
A NI PXIe-1071 crate with some SMA multiplexer units
    Reply  Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4 
[Paco, Anchal]

Continue working on 1Y0. Added coil drivers for LO2, AS1, AS4. Anchal made additional labels for cables and boxes. We lined up all cables, connected
the different units and powered them without major events.
Entry  Tue Dec 14 19:29:42 2021, Paco, Update, BHD, 1Y0 rack work for LO1 
[Paco]

Two coil drivers have been installed on 1Y0 (slots 6, 7, for LO1 SOS). All connections have been made from the DAC, AI board, DAC adapter, Coil
driver, Sat Amp box. Then no SOS load installed, all return connections have been made from Sat Amp box, ADC adapter, AA board, and to ADC. We will continue
    Reply  Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered 
[Anchal, Paco]

Today we populated 4 Sat Amp boxes for LO1, Lo2, AS1, and AS4, 2 BO boxes for C1SU2, and 1 Sat Amp Adaptor box, at 1Y0 according the latest rack
plan. We also added 2 Sorenson power supplies in 1Y0 at the top slots to power +/- 18V DC strips on both 1Y1 and 1Y0. All wiring has been done for these
    Reply  Thu Nov 24 01:28:09 2011, kiwamu, Update, General, 1X8 sorensen came back 


    
        
            Quote from #5963
    
   
        
            
             - One of the Sorensens in 1X8 rack
    Reply  Mon Sep 19 20:21:06 2022, Tega, Update, Computers, 1X7 and 1X6 work IMG_20220919_204013819.jpgIMG_20220919_203541114.jpgIMG_20220919_203458952.jpg
[Tega, Paco, JC]


We moved the GPS network time server and the Frequency distribution amplifier from 1X7 to 1X6 and the PEM AA, ADC adapter and Martian network switch
    Reply  Fri May 3 12:48:40 2019, gautam, Update, SUS, 1X4/1X5 cable admin D38CC485-1EB6-4B34-9EB1-2CB1E809A21A.jpeg
Chub and I crossed off some of these items today morning. The last bullet was addressed by Jon yesterday. I added a couple of new bullets.

The new power connectors will arrive next week, at which point we will install them. Note that there is no
Entry  Thu Jul 17 17:08:58 2014, Harry, Update, General, 1X2 Rack Changes 1X2Changes.png
 Purpose
 
Steve and I moved some things around in the 1X2 rack in order to make room (roughly 6") for the electronics box that will contain rf frequency
    Reply  Thu Jul 17 21:01:28 2014, Manasa, Update, General, 1X2 Rack Changes 


    
        
            Quote:
        
        
            

            Purpose
    Reply  Thu Jul 17 22:08:14 2014, Koji, Update, General, 1X2 Rack Changes 
It sounds like the work was done carefully. Even so, Jenne or Manasa have to run the ALS (X and Y) to check if they are still functional.
    Reply  Mon Sep 24 17:03:39 2012, Jenne, Update, PEM, 1X1 rack power 


    
        
            Quote:
        
        
            

           I've installed Guralp readout box back and it turned out that it does not work with voltage provided from the rack (+13.76 0 -14.94). 
ELOG V3.1.3-