8312
|
Tue Mar 19 19:19:50 2013 |
Jenne | Update | 40m Upgrading | Endtable upgrade : INVENTORY | Does "Ready (in stock)" for the
base plates mean in stock at the company,
or in hand and already here in the |
|
8315
|
Wed Mar 20 14:00:21 2013 |
Steve | Update | 40m Upgrading | Endtable upgrade | As discussed at the 40m meeting: Koji,
Manasa and Steve
|
|
8318
|
Wed Mar 20 15:51:54 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade |
|
|
8320
|
Thu Mar 21 08:11:53 2013 |
Steve | Update | 40m Upgrading | ETMY table swap |
|
|
8321
|
Thu Mar 21 08:46:46 2013 |
Manasa | Update | 40m Upgrading | ETMY table swap | Yes! We are swapping.
I'll be there very soon! |
|
8330
|
Thu Mar 21 17:06:34 2013 |
Steve | Update | 40m Upgrading | ETMY table is out |
|
|
8340
|
Mon Mar 25 18:07:31 2013 |
Steve | Update | 40m Upgrading | ETMY table is out |
|
|
8341
|
Mon Mar 25 18:42:38 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : Timeline | Endtable upgrade - timeline and progress
chart. End table upgrade wiki page updated.
|
|
8355
|
Tue Mar 26 16:10:31 2013 |
Jamie | Update | 40m Upgrading | ETMY table leveling | Steve's suggestion for how to level the
end table using "swivel leveling mounts":
|
|
8356
|
Tue Mar 26 16:36:24 2013 |
Steve | Update | 40m Upgrading | table leveling mounts go here |
|
 |
8371
|
Fri Mar 29 00:27:06 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : Assembly | I am currently putting together all components
so that they are ready to go on the table
once leveling and installation of shield |
 |
8372
|
Fri Mar 29 16:30:27 2013 |
Steve | Update | 40m Upgrading | table leveling mounts go here |
|
|
8373
|
Fri Mar 29 16:35:54 2013 |
Steve | Update | 40m Upgrading | Endtable upgrade |
My full effort to get the optical
table enclosure ready for the lab has failed |
|
8392
|
Tue Apr 2 17:23:23 2013 |
Steve | Update | 40m Upgrading | new ETMY optical table & enclosure in place | Enclosure is at the east end. It
has it's bottom o-ring in place. It will
be ready for optics tomorrow around 5pm |
|
8416
|
Thu Apr 4 17:23:05 2013 |
Steve | Update | 40m Upgrading | ETMY optical table & enclosure is ready for optics |
|
|
8417
|
Fri Apr 5 01:18:34 2013 |
Manasa | Update | 40m Upgrading | Not a fan of the new plastic box yet |
|
|
8418
|
Fri Apr 5 01:28:56 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : populating the table | I started populating the end table; the
TRY path to start with. I found that I need
to redo the cables/electronics layout around |
|
8419
|
Sat Apr 6 09:21:36 2013 |
rana | Update | 40m Upgrading | Not a fan of the new plastic box yet |
1) We still need to drill and
install the thumbscrew latches |
|
8423
|
Mon Apr 8 16:37:26 2013 |
Steve | Update | 40m Upgrading | ETMY enclosure wall transmission |
Enclosure cover #1 transmission
measured in 1064 nm, 156 mW, |
|
8425
|
Tue Apr 9 00:15:18 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : populating the table | [Den, Annalisa, Manasa]
The Alberto laser was moved from the |
|
8427
|
Tue Apr 9 00:32:57 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : TRY temporarily in place | The TRY path on the end table is temporarily
in place to help IFO locking.
The Y arm transmission was steered |
|
8430
|
Tue Apr 9 08:37:54 2013 |
Steve | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : TRY temporarily in place |
|
|
8432
|
Tue Apr 9 21:27:48 2013 |
Jenne | Update | 40m Upgrading | TRY temporarily in place |
|
|
8436
|
Wed Apr 10 14:25:04 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : LWE Alberto laser beam profile | I measured the beam profile of the Alberto
laser (that will be the ETMY end laser) as
I found the data inconsistent with the measurements |
 |
8458
|
Wed Apr 17 02:20:13 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress |
Assembly progress:
1. ETMY oplev setup has been put |
 |
8472
|
Mon Apr 22 17:43:09 2013 |
Steve | Update | 40m Upgrading | ETMY optical table & enclosure is ready for optics |
|
|
8473
|
Mon Apr 22 19:48:56 2013 |
Jenne | Update | 40m Upgrading | 4 pins enough? | Are 4 of these spring loaded pins enough?
I'm not sure how one pin can hold 2 lids
at each point. It seems like we need |
|
8475
|
Tue Apr 23 15:00:20 2013 |
Jenne | Update | 40m Upgrading | 4 pins enough? |
|
|
8486
|
Wed Apr 24 15:27:59 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress: New layout | Layout that will be improved upon over
the next few days.
Things that need to be updated: |
|
8522
|
Thu May 2 01:19:41 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress | I started to put together optics at the
endtable. I am attaching the layout with
the green blocks showing the optics that |
|
8543
|
Tue May 7 19:06:45 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress | I have updated the waists (W) and beam
diameters (D) at 1064nm optics on the
endtable. |
|
8556
|
Thu May 9 01:36:32 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress | Progress with end table:
Parts in green show assembled optics
that will not require any changes. Parts |
|
8560
|
Thu May 9 22:29:23 2013 |
Manasa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress | [Annalisa, Manasa]
More optics have been put on the
table. Direction of the rejected beam from |
|
8561
|
Fri May 10 20:05:21 2013 |
Annalisa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress | I rotated some mounts along
the green beam path, and I started aligning
the beam again. |
|
8565
|
Mon May 13 21:35:55 2013 |
Annalisa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress | Yend
table - Current status |
|
8568
|
Tue May 14 01:13:35 2013 |
Jenne | Update | 40m Upgrading | TRY realigned | Koji noticed that earlier this afternoon
the Yarm ASS was working, but then after
dinner it was no longer working. I |
|
8571
|
Tue May 14 14:24:56 2013 |
Steve | Update | 40m Upgrading | enclosure removal |
I'm planning to remove the
ETMY optical table enclosure and move it |
|
8576
|
Tue May 14 21:03:15 2013 |
Annalisa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress |
GREEN
The new lenses arrived, and I put |
|
8584
|
Wed May 15 21:27:39 2013 |
Annalisa | Update | 40m Upgrading | Endtable upgrade for auxiliary green laser : progress |
GREEN
I still have problems in maximizing |
|
31
|
Tue Oct 30 16:55:40 2007 |
tobin | Routine | | Drag-wiping perfected | Steve, Tobin
Steve procured an assortment of syringes |
|
108
|
Thu Nov 15 18:36:48 2007 |
John | Summary | | PSL table work | I've rotated the lambda/2 plate to 340deg
(from 6 deg) and blocked one arm of the Mach-Zender.
Undo both if you need to. |
|
130
|
Wed Nov 28 12:43:53 2007 |
Andrey | Bureaucracy | | Here was the PDF-file of my presentation |
I was making a report with powerpoint presentation
during that Wednesday's 40-m meeting.
|
|
215
|
Thu Dec 27 12:12:02 2007 |
pkp | Update | | Update on GigE Camera | So I finally got the linux software to compile
on mafalda. I got the software to dump all
the information regarding the camera onto |
|
254
|
Wed Jan 23 09:27:55 2008 |
steve | Update | | etmy sus damping restored | Seismis event trips etmy |
|
548
|
Fri Jun 20 02:20:33 2008 |
Yoichi | Update | | PMC transmittance degradation | The PMC transmitted light power has been degrading
constantly for last two weeks (see the attachment
1).
|
 |
563
|
Wed Jun 25 09:46:45 2008 |
Sharon | Update | | Adaptive Filters | I have been learning about different methods
for applying adaptive filters to improve
the Mode Cleaner lock in specific, and other |
|
577
|
Thu Jun 26 18:29:44 2008 |
Jenne | Update | | MC Back online | Jenne, Rob, Yoichi
I was playing with the Mode Cleaner earlier |
|
680
|
Wed Jul 16 11:26:47 2008 |
Max Jones | Update | | This Week | Baffles.
I got a battery for the magnetometer today |
|
704
|
Mon Jul 21 09:52:05 2008 |
Sharon | Update | | Adaptive code changes | Thanks to Alex, we now save the coefficients
of the adaptive filter every cycle. When
we choose ENABLE: OFF on the MEDM screen, |
|
709
|
Mon Jul 21 19:48:57 2008 |
Sharon | Update | | how tp restart C1ASS | How to restart C1ASS:
1. reboot
|
|