40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 335 of 344  Not logged in ELOG logo
Entry  Tue Apr 23 16:31:13 2013, Eric, Configuration, , PD frequency response 
Entry  Tue Apr 23 22:59:05 2013, rana, Configuration, SUS, Optical Lever Gains normalized 
    Reply  Wed Apr 24 18:51:12 2013, Koji, Configuration, optical tables, PD frequency response 
Entry  Thu Apr 25 17:56:28 2013, Riju, Configuration, , PD frequency response IMG_0495.JPG
    Reply  Thu Apr 25 18:58:06 2013, Koji, Configuration, , PD frequency response 
    Reply  Fri Apr 26 17:08:42 2013, Riju, Configuration, , PD frequency response 
    Reply  Fri Apr 26 21:38:06 2013, Jenne, Configuration, RF System, PD frequency response IMG_0498.JPGIMG_0499.JPGIMG_0500.JPG
Entry  Mon Apr 29 17:26:22 2013, Riju, Configuration, RF System, PD frequency response 7x
Entry  Mon Apr 29 23:02:48 2013, Koji, Configuration, LSC, Questons 
Entry  Tue Apr 30 19:39:14 2013, Riju, Configuration, RF System, PD frequency response IMG_0511.JPGIMG_0512.JPGIMG_0513.JPGIMG_0514.JPGIMG_0515.JPG
    Reply  Tue Apr 30 21:24:15 2013, Jenne, Configuration, RF System, POX fiber laying 
    Reply  Tue Apr 30 23:04:23 2013, Jenne, Configuration, RF System, Only 4 25m cables ordered 
Entry  Wed May 1 17:36:26 2013, Riju, Configuration, RF System, PD frequency response IMG_0517.JPGIMG_0518.JPGIMG_0519.JPG
Entry  Sat May 4 00:21:00 2013, rana, Configuration, Computers, workstation updates 
Entry  Tue May 7 23:03:12 2013, Koji, Configuration, CDS, CDS work 
Entry  Wed May 8 17:03:35 2013, Jamie, Configuration, CDS, make direct IPC connections between c1lsc and c1sus/c1mcs 
Entry  Wed May 8 17:23:04 2013, Jamie, Configuration, CDS, fixed direct IPC connection between c1als and c1mcs 
Entry  Wed May 8 17:45:49 2013, Jamie, Configuration, CDS, More bypassing c1rfm for c1mcs --> c1ioo IPCs 
Entry  Wed May 8 19:31:17 2013, Jamie, Configuration, LSC, LSC: added new SQRT_SWITCH to power normalization DOF outputs 
Entry  Mon May 13 23:05:26 2013, Koji, Configuration, LSC, PRMI locking 130513_PRC_ASC.pdf130513_PRC_ASC_servo.pdf
Entry  Tue May 14 19:52:58 2013, Riju, Configuration, RF System, PD frequency response IMG_0520.JPGIMG_0521.JPG
Entry  Tue May 14 20:27:19 2013, Koji, Configuration, LSC, Openloop gain for PRMI lock May 13 LSCPRCLOLTF.pngLSCMICHOLTF.png130513.zip
    Reply  Wed May 15 00:45:28 2013, rana, Configuration, LSC, Openloop gain for PRMI lock May 13 
    Reply  Wed May 15 08:29:28 2013, Steve, Configuration, RF System, fiber protection at splitter box area fiberprotect.jpg
Entry  Thu May 16 11:50:25 2013, Koji, Configuration, Electronics, Measurement and empirical models of the AI board TFs D000186AD_TF.pdfD000186AD_TF.zip
Entry  Thu May 16 22:03:16 2013, Koji, Configuration, LSC, Y Green BBPD returned to the PSL table 
Entry  Thu May 30 10:40:59 2013, Jamie, Configuration, CDS, Attempt to cleanup c1ioo ADC connections 
Entry  Thu May 30 11:28:34 2013, Jamie, Configuration, CDS, c1als model cleanup 
Entry  Thu May 30 11:33:26 2013, Jamie, Configuration, Computer Scripts / Programs, ASS medm/model changes need to be committed to SVN 
Entry  Tue Jun 4 20:19:07 2013, rana, Configuration, IOO, Changed threshold for FSS SLOW loop 
Entry  Wed Jun 19 16:04:56 2013, Jamie, Configuration, Computer Scripts / Programs, conlog startup fixed, and restarted 
    Reply  Wed Jun 19 16:47:34 2013, Jamie, Configuration, Computer Scripts / Programs, conlog startup fixed, and restarted 
Entry  Thu Jun 20 17:47:44 2013, Annalisa, Configuration, SUS, ETMY oplev servo 
Entry  Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation 
    Reply  Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation DAC_bank.pngASC_schematic.pdf
    Reply  Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification 
    Reply  Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board HV_Amplifier.pdf
    Reply  Thu Jul 11 23:50:57 2013, gautam, Configuration, , PZT Driver Board-changes made ASC_schematic.pdfDAC_Max_output.JPG
    Reply  Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum max_amp.JPGmax_amp_all_channels.JPGDACOffPowerSpec.pdfDACOnPowerSpec.pdfDAC2kPowerSpectrum.pdf
    Reply  Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum 
    Reply  Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units DACOffPSD.pdfDAC500PSD.pdfDAC2000PSD.pdf
Entry  Mon Jul 15 16:51:37 2013, Alex, Configuration, , Planned AS Table addition AS_Table_Ref_PD_Addition.pdf
    Reply  Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units 
    Reply  Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth DAC-6.4_kHz_BW_PSD.pdf
    Reply  Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches D000186_Frequency_Response.pdf
Entry  Tue Jul 16 17:02:41 2013, Alex Cole, Configuration, Electronics, AS Table Additions photo_1_(1).JPGphoto_2_(2).JPG
    Reply  Wed Jul 17 11:13:36 2013, Alex Cole, Configuration, Electronics, AS Table Additions photo_(1).JPG
    Reply  Wed Jul 17 16:15:42 2013, Alex Cole, Configuration, Electronics, AS Table Additions photo_1_(3).JPGphoto_2_(3).JPGphoto_3.JPG
    Reply  Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration QPD-XCalib.pdfQPD-YCalib.pdfError_Function_Fitting.zip
    Reply  Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts Piezo-mirror.jpg
ELOG V3.1.3-