  4233   Mon Jan 31 16:12:11 2011 steveUpdateVACVertex crane upgrade shorth coming


   
        
            
 P1070364.JPGP1070358.JPG 
  4273   Fri Feb 11 09:27:03 2011 steveConfigurationVACRGA scanThe RGA scan is normal at day 52 of this
pump down.
Light power BS 1064nm ~25mW, ETMX
 rgascan20110211.jpgpressurepd70.jpg 
  4391   Wed Mar 9 17:29:11 2011 steveSummaryVACsingle O-ring protectionWe have one single O-ring on the 40m vacuum
envelope. It is on the OOC west side, facing
the AP table. This O-ring has to be protected
 so1.jpgP1070458.JPG 
  4654   Fri May 6 15:59:40 2011 steveUpdateVACTP3 fore pump replacedDry fore pump of TP3 replaced by brand
new Varian SH-110  at  1.1 Torr_75,208
hrs
  
  5016   Fri Jul 22 10:13:41 2011 steveUpdateVACRGA scan at day 213   pd70m213scan.jpg 
  5017   Fri Jul 22 10:24:34 2011 steveUpdateVACpressure plot at day 213Dec 21, 2010 we pumped down the MARK4 rebuilt
40m-IFO and the malev has been pumping on
it since than
 p.jpg 
  5047   Wed Jul 27 15:38:01 2011 steveUpdateVACbeam traps for vacuumWe have cleaned, baked, rga scaned traps
for vacuum. Thorlabs LB1 on 1" OD ss
posts and forks. The effective surface area
 P1080095.JPG 
  5080   Mon Aug 1 08:52:37 2011 steveUpdateVACpreparation to ventBoth arms locked easely around 1V transmited. 
We should recenter oplevs.
 pztsteering.pngvac1Aug2011.pngPEM200d.jpg 
  5104   Wed Aug 3 09:40:13 2011 steveUpdateVACventThe vacuum system is coming up to atm.
The vent was started with slow N2 flow. The
PSL output is blocked 2 places on the table.
 pzt2011Aug3.png 
  5105   Wed Aug 3 11:34:59 2011 kiwamuUpdateVACRe: ventAn
important rule during the in-vac work :
  
  5111   Wed Aug 3 16:18:30 2011 steveUpdateVACvent is almost finishedP1 at 750 Torr,  Vent valve VV1 is
left open to atm. It will reach equilibrium
in an hour. The PSL power is not turned down
 vent8h.jpg 
  5142   Mon Aug 8 15:52:39 2011 steveUpdateVACback ground rga scanThe RGA region is beeing monitored during
the vent. This will tell us how clean the
RGA itself is.
 bg-d5.jpgpresBg-d5.jpg 
  5159   Tue Aug 9 16:54:47 2011 steveUpdateVACscratch on vac doorJenne found a big scratch on the north
vac door of ITMY. Fortunately it does not
reach the inner annulos 0 -ring seal.
 P1080152.JPG 
  5180   Wed Aug 10 22:47:22 2011 ranaSummaryVACVacuum Workstation (linux3) re-activatedFor some reason the workstation at the
vac rack was off and unplugged. Nicole and
I plugged its power back in to the EX rack.
  
  5276   Mon Aug 22 11:40:08 2011 steveUpdateVACcranes checkedCranes are  checked and they are ready
for lifting. At the east end will use the
manual Genei-lift to put door on.
  
  5289   Tue Aug 23 16:23:33 2011 JenneUpdateVACAccess connector in place[Steve, Bob, Jamie, Kiwamu, Valera, Jenne]
The access connector is now in place,
in preparation for pump-down.  Tomorrow
  
  5303   Thu Aug 25 17:14:49 2011 steveUpdateVACclean room fashion changesJamie is modeling our next generation 
in-vac
& clean room bonny suit  that Jenne
 P1080185.JPGP1080183.JPG 
  5331   Thu Sep 1 11:03:22 2011 steveUpdateVACback ground rga scanThe RGA back ground at day 29 of this vent.  v70-bg-d29scan.jpgvent70tempres.jpg 
  5354   Wed Sep 7 00:47:51 2011 JenneUpdateVACPUMP is a GO!Steve and Jamie:  After Jamie checks
the ITM free swingings, 
  
  5357   Wed Sep 7 12:03:49 2011 steveUpdateVACPump down has startedJamie and Steve
We closed ITMX and ITMY chambers
and started pumping around 11am
  
  5361   Wed Sep 7 18:19:37 2011 steveHowToVACstop pump down for overnight


   
        
            
  
  5363   Wed Sep 7 21:45:16 2011 kiwamuUpdateVACpump stopped. Pressure is at 450 mtorrI stopped puming at 9:30 PM and the pressure
in P1 is at 450 mtorr.
I followed exactly he procedure that
 vacuum.png 
  5365   Thu Sep 8 10:50:44 2011 steveUpdateVACpumpdown #71 comletedVacuum status:  " vacuum normal"  
CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve
 pd#71.jpgmaglevpd.jpg 
  5497   Wed Sep 21 11:35:07 2011 steveUpdateVACRGA scanRGA scan with maglev pumping speed at day
14 of the pump down.
The larger inserted box contains
 rgascanpd71m14d.jpg 
  5529   Fri Sep 23 16:25:01 2011 steveUpdateVACvac rack UPS battery replacedAPC Smart -UPS 2200   model: SUA2200RM2U
  batteries were replaced by compatible
RBC43, 8x  12V5A
 P1080252.JPGP1080254.JPG 
  5590   Fri Sep 30 18:35:42 2011 steve, kiwamuUpdateVACvacuum set for poweroutageWe did the following:
1, closed V1, VM1,  annuloses:
VASE, VASV, VABS, VAEV,  VAEE and VA6
 prepforpoweroutage.png 
  5599   Mon Oct 3 08:38:21 2011 steveSummaryVACRecovery from the power shutdown is completed 
I failed to start Rana's favorit
anciant desktop computer at the vac rack.
 poweroutage.jpg 
  5662   Thu Oct 13 21:40:59 2011 ranaSummaryVACRecovery from the power shutdown is completed As it turns out Steve is not crazy
in this particular instance: the vacuum computer,
linux3 , has some issues. I can login just
  
  5759   Fri Oct 28 18:33:59 2011 steveUpdateVACleaking nitrogen line fixedI was lucky to notice that the nitrogen
supply line to the vacuum valves was leaking.
Closed ALL valves. Open supply line to atm.
 allvalvesclosed.png 
  5767   Mon Oct 31 08:55:19 2011 steveUpdateVACpressure plot at day 53


   
        
            
 pd71-m-d53.png 
  5887   Mon Nov 14 15:46:14 2011 steveUpdateVACTP2's forepump changedThe foreline pressure of TP2 was 1.4 Torr
this morning. This drypump worked well for
ten months.
 drypump.png 
  5950   Fri Nov 18 16:37:14 2011 steveUpdateVACpreparing for ac power interruptionThe vacuum is ready for no AC power for
1 hr on Sunday morning at 10am
 
 planednopower.png 
  5962   Sun Nov 20 13:51:54 2011 steveUpdateVACvacuum is back up after ac interruptionState condition: Vac Normal,         
CC1 ~8e-6 Torr
The IFO pressure peaked at 
 notpumping.png 
  6790   Fri Jun 8 15:24:08 2012 steveUpdateVACRGA scan at day 276 and pressure plots

    

       
            
 40m71pdM276d.pngpd71m276d.pngpd71d276.png 
  6894   Fri Jun 29 11:02:00 2012 steveUpdateVACthe vent is at 500 torr

    

       
            
 sussum.pngpzt.png 
  6895   Fri Jun 29 13:11:31 2012 steveUpdateVAC40m IFO at atm The 4 hrs vent plot at 3 torr/min
rate.
Nitrogen was used from 1e-6 torr
 vent06292012.png40m@ATM.png 
  6897   Fri Jun 29 22:56:35 2012 JamieUpdateVACinput telescope beam clipping on Faraday[Yuta, Koji, Jamie]
We went into ITMX chamber to inspect
the situation there.  We looked for
  
  6906   Tue Jul 3 17:23:50 2012 steveUpdateVACpumpdown completedVacuum Normal State is reached in 9 hours. 
CC1 =  2e-5 Torr
Aux dry pump #3 is still running. 
 pd72.pngpd72vacnormal.pngpd72at9hrs.png 
  6929   Fri Jul 6 09:27:40 2012 steveUpdateVAC4 days at atm I'm looking for some movement indicators
of the vent-pump down events.
 
 vent_moves.png 
  6930   Fri Jul 6 09:52:35 2012 steveUpdateVACpump down hick up I can not understand what really
happened here with CC1 gauge or there was
really a pressure glitch.
 d3wFireworks.pngpdhickup.png 
  6970   Thu Jul 12 16:27:04 2012 steveUpdateVACdrypump changedTP2  dry_pump was changed at intake
pressure 982 mTorr at 84,889 hrs  This
seal hold up for one year.
  
  7044   Fri Jul 27 14:28:36 2012 steveUpdateVACcold cathode gaugesOur cold
cathode 423 gauges are 10 years old.
They get insulated by age and show no ionization
 cc_gauges.png 
  7051   Mon Jul 30 15:49:16 2012 steveUpdateVACcc1 switched

    

       
            
 cc1changedfVtH.png 
  7056   Tue Jul 31 08:01:22 2012 steveUpdateVACcc1 switched

    

       
            
 cc1h1d.png 
  7089   Mon Aug 6 10:53:32 2012 steveUpdateVACstatus: vauum normal 
 The power outage did not have
any effect on the vacuum system.  I
 CCgauges.png 
  7272   Fri Aug 24 16:03:39 2012 SteveUpdateVACVacuum related work at atmVacuum related work at atmosphere:
Atm1,  Check all chamber dog
clamps tightness with torque wrench,
 IMG_1563.JPGIMG_1565.JPGIMG_1566.JPG 
  7278   Sun Aug 26 20:58:21 2012 JenneUpdateVACDon't vent!!!![Koji, Jenne]
Steve, do not vent tomorrow morning! 
We are still not prepared, and will not finish
  
  7293   Tue Aug 28 09:37:33 2012 SteveUpdateVACRGA scan at day 56RGA scan,  Maglev pumping speed at
day 56
CC1 is dying. CC4 is real.
 pd72m56d.pngpd72m56dpr.png 
  7300   Tue Aug 28 17:59:03 2012 JenneUpdateVACVENT: GO!I have turned of the high voltage supplies
for PZT1 and PZT2.  The OMC PZT high
voltage supplies were already off, since
  
  7306   Wed Aug 29 11:47:21 2012 ericqUpdateVACVenting [Steve, Eric]
I've been helping Steve vent this
morning. The following things were done (from
  
ELOG V3.1.3-