40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 354  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tue Sep 28 14:12:14 2010, steve, Update, General, vertex crane drive is out of order 
    Reply  Thu Sep 30 09:34:58 2010, steve, Update, General, vertex crane trolly drive fixed P1060891.JPGP1060887.JPGP1060889.JPGP1060893.JPG
Entry  Thu Sep 30 13:43:29 2010, steve, Update, SAFETY, propane gas smell in control room 
Entry  Fri Oct 1 16:46:20 2010, steve, Bureaucracy, SAFETY, Yuta received 40m-101-safety training 
Entry  Tue Oct 5 09:26:04 2010, steve, Configuration, PEM, moved accelerometers 
Entry  Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed 
Entry  Thu Oct 7 08:39:39 2010, steve, Bureaucracy, SAFETY, Joonho receives safety training 
Entry  Thu Oct 7 15:21:51 2010, steve, Update, PSL, RF filter for PMC 35.5MHZ.pdf
Entry  Fri Oct 8 07:41:42 2010, steve, Configuration, SAFETY, 2W laser shutter is closed 
    Reply  Fri Oct 8 10:38:03 2010, steve, Configuration, SAFETY, 2W laser shutter is closed P1060905.JPGP1060910.JPG
Entry  Fri Oct 8 17:36:16 2010, steve, Frogs, Photos, visiting undergrads P1060916.JPGP1060921.JPGP1060922.JPGP1060915.JPG
    Reply  Mon Oct 11 10:51:36 2010, steve, Update, SUS, OSEMs, OSEMs, OSEMs...those lovely little OSEMs 40dll.jpg
Entry  Tue Oct 12 16:35:17 2010, steve, Configuration, PSL, PSL output monitor in place 
Entry  Mon Oct 18 09:01:48 2010, steve, HowTo, General, How not to  P1060926.JPG
Entry  Wed Oct 20 16:41:41 2010, steve, Omnistructure, General, laser chiller leaving for MIT P1060929.JPG
Entry  Thu Oct 21 10:44:56 2010, steve, Metaphysics, Treasure, 1987 supernova tapes plus....? P1060932.JPG
Entry  Wed Oct 27 09:02:29 2010, steve, Update, Electronics, HP4195A is NOT fixed 
Entry  Thu Oct 28 09:16:17 2010, steve, Update, PEM, welding in the vertex area 
    Reply  Thu Oct 28 13:01:34 2010, steve, Update, PEM, crane repair guys left for the day 
Entry  Mon Nov 1 10:17:55 2010, steve, Update, General, breakers relabelled P1060970.JPGP1060972.JPGP1060975.JPG
Entry  Mon Nov 1 10:28:41 2010, steve, Bureaucracy, SAFETY, Suresh received 40m safety training 
Entry  Wed Nov 3 16:49:31 2010, steve, Update, General, storage cabinet is in place P1070018.JPG
Entry  Thu Nov 4 17:24:49 2010, steve, Update, General, conflat flanges for MIT P1070020.JPG
Entry  Thu Nov 4 17:57:27 2010, steve, Update, General, BeamScanner is working again P1070024.JPG
Entry  Fri Nov 5 09:08:14 2010, steve, Update, SUS, epoxy 11081001.PDF
Entry  Thu Nov 11 11:08:26 2010, steve, Bureaucracy, PEM, AP table found open 
Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
    Reply  Mon Dec 20 16:57:58 2010, steve, Update, IOO, checking out & closing the vacuum chambers 
Entry  Tue Dec 21 16:20:09 2010, steve, Configuration, VAC, pumpdown has started 
Entry  Wed Dec 22 17:24:50 2010, steve, Configuration, VAC, slow pumpdown at 12 hours slowpd12h.jpg
    Reply  Thu Dec 23 13:30:09 2010, steve, Configuration, VAC, slow pumpdown complete slow2dpd.jpg
Entry  Fri Jan 7 15:17:37 2011, steve, Update, Cameras, ITMX video monitor has tower wide view 
Entry  Tue Jan 11 11:39:45 2011, steve, Update, VAC, RGA is turned on pd70d22.jpg
Entry  Tue Jan 18 10:25:23 2011, steve, Update, PEM, vertex crane work this week 
    Reply  Mon Jan 31 16:12:11 2011, steve, Update, VAC, Vertex crane upgrade shorth coming P1070364.JPGP1070358.JPG
Entry  Wed Feb 9 10:25:46 2011, steve, Update, SAFETY, AP table P1070395.JPG
Entry  Thu Feb 10 11:16:31 2011, steve, Update, PEM, south arm AC turned on 
Entry  Fri Feb 11 09:27:03 2011, steve, Configuration, VAC, RGA scan rgascan20110211.jpgpressurepd70.jpg
Entry  Fri Feb 11 16:43:09 2011, steve, Update, VIDEO, MC1 & 3 video monitor P1070415.JPG
Entry  Mon Feb 14 11:23:24 2011, steve, Update, SAFETY, enclosure door upgrade P1070418.JPG
Entry  Mon Feb 14 17:16:47 2011, steve, Update, General, racks, breakers labeled 
    Reply  Tue Feb 22 11:53:38 2011, steve, Update, Electronics, RF Distribution box: assembly completed 
Entry  Tue Feb 22 14:37:24 2011, steve, Update, SAFETY, Larisa received 40m safety training 
Entry  Thu Feb 24 11:18:08 2011, steve, Update, SUS, SRM sus-cables P1070428.JPG
Entry  Thu Feb 24 16:47:26 2011, steve, Configuration, PSL, shutter is back on the PSL output P1070441.JPG
Entry  Fri Feb 25 10:11:56 2011, steve, Update, SAFETY, how not to Presentation1.jpg
Entry  Wed Mar 2 16:51:53 2011, steve, Configuration, Green Locking, mech shutter in place at the south end 
Entry  Tue Mar 8 15:23:16 2011, steve, Update, PEM, clean room gloves 
Entry  Wed Mar 9 17:29:11 2011, steve, Summary, VAC, single O-ring protection so1.jpgP1070458.JPG
Entry  Fri Mar 11 16:30:42 2011, steve, Update, General, high speed servo unit is here P1070462.JPG
ELOG V3.1.3-