40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 339  Not logged in ELOG logo
Entry  Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models LockinRoll.png
Entry  Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned 
    Reply  Thu Feb 21 19:55:46 2008, rana, Update, Electronics, 2 BNC Cables, 1 Tee 
Entry  Thu Oct 25 21:02:34 2012, Den, Update, PEM, 1x7 dc power DSC_4779.JPG
Entry  Tue Dec 6 02:57:44 2011, kiwamu, Update, Green Locking, 1st trial of handing off YarmALS.png
Entry  Mon Apr 29 18:53:03 2013, Jenne, Update, Electronics, 1pps timing fiber to OMC rack may be bent 
Entry  Sun Jun 29 18:58:43 2008, rana, Summary, Computers, 1e20 is too big for AWG and/or IOVME 
Entry  Tue Nov 3 12:47:01 2009, Koji, Configuration, CDS, 1Y9 Rack configuration update 
Entry  Mon Sep 15 14:00:52 2008, josephb, Configuration, Computers, 1Y9 Hub and C1asc 
    Reply  Fri Aug 16 16:40:04 2019, gautam, Update, CDS, 1Y3 work newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png
Entry  Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered 
    Reply  Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed 1Y2_5V_Fuse.JPG
    Reply  Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed 
    Reply  Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed 40m_BHD.png
    Reply  Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras 
    Reply  Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3 
    Reply  Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work 
    Reply  Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work 
Entry  Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE. RemovedStuff.jpeg1Y1.jpeg1Y3.jpeg
    Reply  Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4 
Entry  Tue Dec 14 19:29:42 2021, Paco, Update, BHD, 1Y0 rack work for LO1 
    Reply  Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered 
    Reply  Thu Nov 24 01:28:09 2011, kiwamu, Update, General, 1X8 sorensen came back 
    Reply  Fri May 3 12:48:40 2019, gautam, Update, SUS, 1X4/1X5 cable admin D38CC485-1EB6-4B34-9EB1-2CB1E809A21A.jpeg
Entry  Thu Jul 17 17:08:58 2014, Harry, Update, General, 1X2 Rack Changes 1X2Changes.png
    Reply  Thu Jul 17 21:01:28 2014, Manasa, Update, General, 1X2 Rack Changes 
    Reply  Thu Jul 17 22:08:14 2014, Koji, Update, General, 1X2 Rack Changes 
    Reply  Mon Sep 24 17:03:39 2012, Jenne, Update, PEM, 1X1 rack power 
Entry  Tue Nov 10 12:41:23 2020, gautam, Update, IOO, 1W > IMC CD93A725-FB5C-4F67-BB2E-D122205114B0.jpeg
Entry  Sat Apr 17 18:30:12 2010, Zach, Update, Green Locking, 1W NPRO output profile profile_fit_4_17_10.png
    Reply  Mon Apr 19 11:31:04 2010, Aidan, Update, Green Locking, 1W NPRO output profile 
Entry  Tue Apr 20 13:02:14 2010, Zach, Update, Green Locking, 1W NPRO output profile profile_fit_4_19_10.png
    Reply  Tue Apr 20 13:37:36 2010, Jenne, Update, Green Locking, 1W NPRO output profile 
    Reply  Tue Apr 20 19:37:02 2010, Koji, Update, Green Locking, 1W NPRO output profile 
    Reply  Mon Apr 11 17:03:41 2016, Steve, Update, Calibration-Repair, 1W Innolight repair completed 
    Reply  Mon Mar 21 14:29:32 2016, Steve, Update, Calibration-Repair, 1W Innolight laser repair diagnoses 
Entry  Thu Oct 21 10:44:56 2010, steve, Metaphysics, Treasure, 1987 supernova tapes plus....? P1060932.JPG
Entry  Mon May 24 08:38:26 2021, Chub, Update, Electronics, 18-bit AI, 16-bit AI and 16-bit AA 
Entry  Tue Nov 17 14:31:25 2015, ericq, Update, CDS, 16Hz frame writing temporarily disabled 
    Reply  Tue Nov 17 20:57:43 2015, ericq, Update, CDS, 16Hz frame writing running again 
Entry  Thu Apr 30 05:49:06 2009, Yoichi, Update, Locking, 166MHz LO phase changed 
Entry  Fri May 1 01:32:43 2009, Yoichi, Update, Locking, 166MHz LO phase adjustment 
    Reply  Fri May 1 10:04:10 2009, rob, Update, Locking, 166MHz LO phase adjustment 
Entry  Thu Jan 28 09:17:32 2010, Alberto, Update, LSC, 166 Modulation turned off 
Entry  Mon Jan 25 16:30:37 2010, Alberto, Update, ABSL, 166 MHz sideband turned off 
    Reply  Mon Jan 25 16:46:33 2010, Alberto, Update, ABSL, 166 MHz sideband turned off 
    Reply  Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off 
Entry  Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired 
Entry  Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
    Reply  Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
ELOG V3.1.3-