12557
|
Thu Oct 13 09:30:38 2016 |
Steve | Update | General | vent 79 is happening |
Quote: |
I have completed the following non-Steve portions of the pre-vent checklist [wiki-40m.ligo.caltech.edu]
- Center all oplevs, transom QPDs (and IPPOS + IPANG if they are set up)
- Align the arm cavities for IR and align the green lasers to the arms.
- Update the SUS Driftmon values
- Reconcile all SDF differences
- Reduce input power to no more than 100mW (measured at the PSL shutter) by adjusting wave plate+PBS setup on the PSL table BEFORE the PMC. (Using the WP + PBS that already exist after the laser.)
- Replace 10% BS before MC REFL PD with Y1 mirror and lock MC at low power.
- Close shutter of PSL-IR and green shutters at the ends
All shutters are closed. Ready for Steve to check nuts and begin venting!
|
- checked all jam nuts
- checked all viewports are covered
- turned oplev servos off
- took pictures of medm screens: sus summs, aligned oplev centering, IFO& MC alignment biases and vac configuration
- checked particle counts
- checked crane operational safety
- closed V1, VM1, annuloses
- opened VV1 and vented with Airgas brand, Industrial Grade Nitrogen [ 99.99% ] to 25 Torr
- switched over to Airgas brand compressed air, Alphagas " AI UZ300 " with Total Hydro Carbon 0.1 PPM |
Attachment 1: vent79precond.png
|
|
Attachment 2: venting.png
|
|
10536
|
Thu Sep 25 08:21:15 2014 |
Steve | Update | VAC | vent day 1 |
Quote: |
[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off, light doors are on. Q is aligning the IFO.
|
|
Attachment 1: ventDay1.png
|
|
10542
|
Fri Sep 26 09:13:17 2014 |
Steve | Update | SUS | vent day 2 |
ITMY in vac table needs leveling. |
Attachment 1: ventDay2.png
|
|
Attachment 2: ITMY.png
|
|
7594
|
Tue Oct 23 08:45:00 2012 |
Steve | Update | VAC | vent day 3 |
Quote: |
Quote: |
Quote: |
PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now. Jenne is taking over here.
|
Valves closed, 500 torr. Steve will finish off Monday morning, then we'll take off doors and get to work.
|
We are almost at atm. P1 750 Torr, We are slowly reaching equilibrium.
|
The access connector was removed, BS and ITMY chambers were opened yesterday.
New one piece aluminum shell access connector installed. Jenne lowered the PSL out put into MC to ~100mW |
Attachment 1: ventd4.png
|
|
Attachment 2: IMG_1743.JPG
|
|
10547
|
Mon Sep 29 09:11:25 2014 |
Steve | Update | VAC | vent day 5 RGA scan |
|
Attachment 1: v77_bg-mag-d5.png
|
|
2635
|
Tue Feb 23 19:00:45 2010 |
kiwamu | Configuration | VAC | vent finished |
The vent has been finished.
Now the pressure inside the chamber is 760 torr, and it's getting equilibrium with the atmospheric pressure.
Therefore we are ready and can open the door of the chamber tomorrow. |
3259
|
Wed Jul 21 12:41:31 2010 |
kiwamu | Update | VAC | vent finished |
The vent has been finished successfully in this morning.
The vent was finished successfully this morning. |
3266
|
Thu Jul 22 08:07:27 2010 |
steve | Update | VAC | vent finished |
Quote: |
The vent has been finished successfully in this morning.
The vent was finished successfully this morning.
|
Thanks to Kiwamu, Alberto and Koji |
Attachment 1: 30hvent.jpg
|
|
6889
|
Thu Jun 28 20:59:28 2012 |
yuta | Bureaucracy | Locking | vent for PRC check, TOMORROW! |
Koji, Jamie and I talked together and I decided to VENT TOMORROW MORNING. Main purpose of this vent is to see if PRM is flipped or not.
Vent schedule:
June 28 (Thu)
Prepare for the vent tonight
June 29 (Fri)
Start vent in the morning
Look into PRC in the evening. If PRM was flipped, we will correct them. We'll use REFL to align the PRM. If PRM was not flipped, look into PR2,PR3 and other related optics.
June 30 (Sat)
July 1 (Sun)
Thinking time. I can work if needed.
July 2 (Mon)
If we need something else to do, do it.
If not, start pumping.
July 4th is the Independence Day. So, I need IFO working before July 4th.
Check List:
We will just open the BS chamber.
- PRM flipping
- PR2, PR3 flipping
- PRC suspensions
- Cipping check in PRC |
6890
|
Thu Jun 28 22:08:57 2012 |
Jenne | Bureaucracy | Locking | vent for PRC check, TOMORROW! |
Quote: |
Check List:
We will just open the BS chamber.
- PRM flipping
- PR2, PR3 flipping
- PRC suspensions
- Cipping check in PRC
|
What do you mean by PR2, PR3 flipping? They are (supposed to be) flat mirrors, so obviously they should be installed correctly, but they won't change the mode matching in a huge way if they're backwards, right?
For the PRM, I recommend checking (a) the arrow inscribed on the thinner side of the optic and (b) that the arrow *actually* points to the HR side. I'm pretty sure I installed all the optics with the arrow pointing away from the OSEMs, but I never did a thorough check that the arrow always actually pointed to the HR coated side. I don't remember any optics where I said "hmmm, that's funny, the arrow is pointing backwards", but nor did I write down that I had checked.
Also, hopefully the PRM is correct. If however it's not, that means that all of the magnets are glued onto the HR side, and we'll have to redo all of the magnet gluing. The guiderods should be fine, but all 6 magnets would need redoing. If we were very, very careful and didn't break any of the magnets off of the dumbbells, it's a 24 hour turnaround due to drying time. Since inevitably we break magnets away from dumbbells, conservatively we should think about a 48 hour turnaround. |
6891
|
Fri Jun 29 01:49:36 2012 |
yuta | Bureaucracy | Locking | vent for PRC check, TOMORROW! |
Quote: |
What do you mean by PR2, PR3 flipping? They are (supposed to be) flat mirrors, so obviously they should be installed correctly, but they won't change the mode matching in a huge way if they're backwards, right?
|
We see some ghost beam spots at POP. This may come from the back of PR2 and PR3. Also, they may change mode matching because of thermal lensing, mirror deformation, and other unexpected reasons. I thought we should check every mirrors in PRC, if PRM is not flipped.
We are going to check PRM just because we spent so much time for the PRC problem, and still don't have the solution or evidence.
PRM flipping is kind of the only idea for the root of all evil -- terrible beam shape, low PR gain, unstable PRMI lock.
So, I want to check with my eye during the stay.
I don't think we have to redo magnet gluing. It's okay to leave them on HR side. |
7849
|
Tue Dec 18 10:43:20 2012 |
Steve | Update | VAC | vent has completed |
The 40m vacuum envelope is at atm It took 4.5 hours at ~3 Torr/min speed. Atm1
What I did:
Turned PZT voltages off: 84.1V at OMC-rack location
- 99V at 1Y3 location as PZT_pitch,
56.6V KEPCO at 1Y3 location as PZT_yaw
Took screen shuts of SUS_SUMMARY, yesterday, Atm3
Turned off OPLEV _SERVOs, today , Atm2
Closed PSL_SHUTTER and green shutters at the ends
Set vacuum valves for vent position and opened VM2 for the RGA
|
Attachment 1: vent74.png
|
|
Attachment 2: bvent.png
|
|
Attachment 3: befVent.png
|
|
7582
|
Fri Oct 19 16:45:39 2012 |
Steve | Update | VAC | vent has started |
Quote: |
VENT NOW and FIX ALIGNMENT!
|
PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now. Jenne is taking over here. |
7584
|
Fri Oct 19 19:26:42 2012 |
Jenne | Update | VAC | vent has started |
Quote: |
PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now. Jenne is taking over here.
|
Valves closed, 500 torr. Steve will finish off Monday morning, then we'll take off doors and get to work. |
5111
|
Wed Aug 3 16:18:30 2011 |
steve | Update | VAC | vent is almost finished |
P1 at 750 Torr, Vent valve VV1 is left open to atm. It will reach equilibrium in an hour. The PSL power is not turned down yet. The beam path is blocked at two places inside the enclosure.
The low power 20 mW input MC can be locked tonight.
Next day's - Thursday notes:
We reached 760 Torr of atm in 8 hrs at 1.7 Torr/ min with 5 cylinders of instrument grade air.
Used 500 PSI of nitrogen to get to 20 Torr at first. This flow and the first cylinder of N2 has to be slower next time.
We did the following:
1, oplevs were centered on locked caveties 2 days ago
2, just before vent we rechecked arms pointing, they wre still locking
3,eloged strain gages and turned HVs off at PZT-steering at 1Y3 rack and OMC-PZT ps at 1X2 aux rack. They were actually off.
4,,checked jam nuts 6 places x 3
5, turned oplev servos off
6, eloged SUS summery page
7, checked particle counts at ITMY: 1 micron 300, 0.5 micron 3K, 0.3 micron 30K particles / cft-min. All three cranes were wiped 2 days ago.
8, blocked laser into IFO: main 1064 in 1.25W were blocked by manual 2 blocks on PSL table. The PSL output shutter was left open to be triggered by interlock at P1 3 mTorr. It did!
Aux NPRO-AP and green light input at both ends were blocked. |
Attachment 1: vent8h.jpg
|
|
2636
|
Tue Feb 23 19:07:43 2010 |
kiwamu and steve | Configuration | VAC | vent is completed |
Quote: |
Kiwamu and Steve have started venting the 40m vacuum envelope.
Preparation:
centered oplevs at resonating cavities,
ITM references were set by green pointer from the ends by Koji,
closed PSL shutter and placed manual block into beam path,
checked jamnuts in locked positions on bellows,
turned HV off at PZT-Jena "steering mirror" power supply and OMC HV ps
checked particle counts,
switched oplev servos off,
set up N2 cylinder to start vent from 1e-6 Torr to 25 Torr,
have ~ 6 cylinders of instrument grade compressed air to bring envelope from 25 Torr to 760 Torr
All three cranes were wiped off today.
|
Kiwamu has completed the vent. |
Attachment 1: vent2010feb23.jpg
|
|
10532
|
Wed Sep 24 13:28:48 2014 |
Steve | Update | VAC | vent is completed |
The vent is completed. ITMX was kicked up accidentally. Valve configuration: chamber open, RGA is pumped through VM2 Maglev |
Attachment 1: ventiscompleted.png
|
|
Attachment 2: atAtm.png
|
|
10533
|
Wed Sep 24 16:02:58 2014 |
Jenne | Update | VAC | vent is completed |
[Steve, EricQ, Jenne]
ITMY and BS heavy doors are off, light doors are on. Q is aligning the IFO. |
5698
|
Wed Oct 19 14:03:41 2011 |
kiwamu | Update | General | vent prep : dichroic mirrors |
Status update on dichroic mirror:
I got the specification sheet of an aLIGO 2" dichroic mirror from Lisa.
https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=25232
This is the one from ATF. It has low loss, a high R for 1064 nm and high T for 532 nm. So it matches our needs.
Based on this sheet we may reset some of the parameters in the specification (e.g. incident angle and etc.,) and will get a quote from ATF.
We will buy 3 of them, including 1 spare. First I need to review the specification. |
7249
|
Wed Aug 22 15:47:34 2012 |
jamie | Summary | General | vent prepartion for fast-track vent |
We are discussing venting first thing next week, with the goal of
diagnosing what's going on in the PRC.
Reminder of the overall vent plan:
https://wiki-40m.ligo.caltech.edu/vent
Since we won't be prepared for tip-tilt installation (item 2), we should
focus most of the effort on diagnosing what's going on in the PRC. Of
the other planned activities:
(1) dichroic mirror replacement for PR3 and SR3
Given that we'll be working on the PRC, we might consider going ahead
with this replacement, especially if the folding mirror becomes
suspect for whatever reason. In any case we should have the new
mirrors ready to install, which means we should get the phase map
measurements asap.
(3) black glass beam dumps:
Install as time and manpower permits. We need to make sure all needed
components are baked and ready to install.
(4) OSEM mount screws:
Delay until next vent.
(5) new periscope plate:
Delay until next vent.
(6) cavity scattering measurement setup
Delay until next vent. |
7255
|
Thu Aug 23 10:38:12 2012 |
Steve | Update | General | vent prepartion for fast-track vent |
Quote: |
We are discussing venting first thing next week, with the goal of
diagnosing what's going on in the PRC.
Reminder of the overall vent plan:
https://wiki-40m.ligo.caltech.edu/vent
Since we won't be prepared for tip-tilt installation (item 2), we should
focus most of the effort on diagnosing what's going on in the PRC. Of
the other planned activities:
(1) dichroic mirror replacement for PR3 and SR3
Given that we'll be working on the PRC, we might consider going ahead
with this replacement, especially if the folding mirror becomes
suspect for whatever reason. In any case we should have the new
mirrors ready to install, which means we should get the phase map
measurements asap.
(3) black glass beam dumps:
Install as time and manpower permits. We need to make sure all needed
components are baked and ready to install.
(4) OSEM mount screws:
Delay until next vent.
(5) new periscope plate:
Delay until next vent.
(6) cavity scattering measurement setup
Delay until next vent.
|
Bob is back. Cleaning and baking all our posts and clamps. They will be ready for use Tuesday next week. Therefore beam dumps will be available for installation. |
7558
|
Tue Oct 16 16:46:20 2012 |
Vent Czar and Czarina | Summary | General | vent stuff |
We're discussing the plan for the next vent. Now that we have all the tip-tilt stuff in hand, we should get ready for the big TT installation vent ASAP. The question is what remains to be done, and when can we be ready
Stuff that needs doing:
* characterize TTs, check electrical connection of quadrupus cables, bake cables and base plates - a week or so (not including baking)
* phase map of LaserOptik mirrors (decide on needed resolution) - a week or so?
* get ready to swap G&H mirrors with LaserOptik mirrors (PR2, PR3, SR2, SR3)
* assembly of black glass beam dumps - one afternoon
* green periscope moving - day or so to make sure greens are resonant in arms, so we have something to align to
* redraw of REFL path?? (rotate 2nd refl mirror to reflect beam to the east, then add mirror to get beam out of IOO chamber viewport), cut hole in BS oplev table's box, install black beam tube
* FI camera mount - make sure it's here, baked
* active TT pitch damping plan
* passive TT weight addition and pitch alignment plan
* camera plan for taking in-chamber photos without touching the tables
* look at layout of ITMY table. POY pick-off too close to main beam. Can we move POY pick-off to BS table?
* remount black glass baffles on SOS cages.
Stuff to bake:
* Quadrupus cables
* TT base plates
* FI mirror mount for FI camera
* stuff to add to active TTs
* stuff to add to passive TTs
|
7560
|
Tue Oct 16 17:13:23 2012 |
Czarina | Summary | General | vent stuff - 4 paths |
I see 4+ possible paths for us to take, in terms of a possible vent in the next few weeks:
No Vent - Just do FPPRMI, using AS55
Mini Vent - Fix REFL path, nothing else. ~1 day at atmosphere
Medium Vent - Fix REFL path, swap G&H mirrors for LaserOptik mirrors (so also resuspend passive TTs, maybe add pitch adjustment option). ~1 week or so at atmosphere - do this rather than Mini if Jan's Finesse calc says the G&H mirrors are too rough
Mega Vent - Fix all the things, do all the things. Long time at atmosphere
The "+" is to take into account all the possible variations on "medium vent". The No, Mini and Medium options assume we'll do the Mega option later, just not immediately. |
66
|
Tue Nov 6 09:45:22 2007 |
steve | Summary | SUS | vent sus trend |
The mc optics dragwippings were done by locking optics by eq stops and rotating-moving
cages so access were good. This technic worked well with mc1 & mc2
MC3 osems were reoriented only. |
Attachment 1: ventsustrend.jpg
|
|
2631
|
Tue Feb 23 13:37:04 2010 |
kiwamu and steve | Configuration | VAC | venting the 40m vac envelope |
Kiwamu and Steve have started venting the 40m vacuum envelope.
Preparation:
centered oplevs at resonating cavities,
ITM references were set by green pointer from the ends by Koji,
closed PSL shutter and placed manual block into beam path,
checked jamnuts in locked positions on bellows,
turned HV off at PZT-Jena "steering mirror" power supply and OMC HV ps
checked particle counts,
switched oplev servos off,
set up N2 cylinder to start vent from 1e-6 Torr to 25 Torr,
have ~ 6 cylinders of instrument grade compressed air to bring envelope from 25 Torr to 760 Torr
All three cranes were wiped off today.
|
3616
|
Tue Sep 28 14:12:14 2010 |
steve | Update | General | vertex crane drive is out of order |
The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.
I crane was just turned on for for may be about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.
The crane is tagged out again and the controller box is cooling down. |
9146
|
Fri Sep 20 16:37:30 2013 |
Steve | Update | VAC | vertex crane folding arm is back on |
Quote: |
The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
see elog #9111
|
Atm1, The folding arm is back on with 0.1" misalignment at no load in the trolly's way. The other side of the I beam is 0.02" higher than the main beam.. New bushing and pin were greased up with Krytox before installation.
The axial Zerk 1/8" pipe in the pin upper end can not take any fitting. There is no room. It is taped off.
This gap comes down to ~ 1/16" at fully extended arm with 225 lbs load at the end of it.
The present plan is to grind down the the misalignment of 0.1" for a slow-loaded trolly.
Steve Baker of Konacranes will be back to grind down this ridge and load test at 500 lbs on Tuesday, OCT 1, 2013
|
Attachment 1: bushingBottom.jpg
|
|
Attachment 2: foldingI.jpg
|
|
Attachment 3: noLoadGap.jpg
|
|
Attachment 4: trollyway.jpg
|
|
Attachment 5: trollySee.jpg
|
|
9139
|
Wed Sep 18 14:57:12 2013 |
Steve | Update | VAC | vertex crane folding arm removed |
The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
see elog #9111 |
Attachment 1: manPower.jpg
|
|
Attachment 2: rotatingHinge.jpg
|
|
Attachment 3: supportingHinge.jpg
|
|
Attachment 4: gullingPin.jpg
|
|
9111
|
Thu Sep 5 10:47:58 2013 |
Steve | Update | VAC | vertex crane folding issue |
[Fred Goldbar, Mike Gerfen, Dennis Coyne and Steve]
We inspected the hinge, 1.25" cross pin and I-beams. It is hard to explain what is causing the folding I-beam corner to jam against the main I-beam.
To limit the motion of the folding I-beam cross pin bushing will be added. This will take a week to complete.
|
Attachment 1: 5mmLess.jpg
|
|
9185
|
Wed Oct 2 14:25:39 2013 |
Steve | Update | VAC | vertex crane is still out of order |
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
Load bearing cable moved into correct position. New folding spring installed.
Crane calibration was done at 500 lbs at the end of the fully extended jib.
Than we realized that the rotating wheel limit switch stopped working.
This means that the crane is still out of order. 
|
Attachment 1: grindingIbeam.jpg
|
|
Attachment 2: cableMoved.jpg
|
|
Attachment 3: 500lbs@end.jpg
|
|
9372
|
Wed Nov 13 08:46:03 2013 |
Steve | Update | VAC | vertex crane repair completed |
nullQuote: |
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
Load bearing cable moved into correct position. New folding spring installed.
Crane calibration was done at 500 lbs at the end of the fully extended jib.
Than we realized that the rotating wheel limit switch stopped working.
This means that the crane is still out of order. 
|
New limit switch installed and tested. The crane is back in full operational mode. Two spare limit switches on hand. |
9117
|
Mon Sep 9 15:33:06 2013 |
Steve | Update | VAC | vertex crane repair is scheduled |
Quote: |
[Fred Goldbar, Mike Gerfen, Dennis Coyne and Steve]
We inspected the hinge, 1.25" cross pin and I-beams. It is hard to explain what is causing the folding I-beam corner to jam against the main I-beam.
To limit the motion of the folding I-beam cross pin bushing will be added. This will take a week to complete.
|
KoneCrane contact John McDaniel (562) 903 - 1371,
Wednesday, September 18, folding I-beam will be removed. KoneCrane will start working at 7:30am and they should be out by 12:30pm
Friday, September 20, reinstalling machined hinge on the I-beam. Same timing schedule as Wednesday. |
9173
|
Mon Sep 30 08:53:22 2013 |
Steve | Update | VAC | vertex crane repair schedule has changed |
Quote: |
Quote: |
The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
see elog #9111
|
Atm1, The folding arm is back on with 0.1" misalignment at no load in the trolly's way. The other side of the I beam is 0.02" higher than the main beam.. New bushing and pin were greased up with Krytox before installation.
The axial Zerk 1/8" pipe in the pin upper end can not take any fitting. There is no room. It is taped off.
This gap comes down to ~ 1/16" at fully extended arm with 225 lbs load at the end of it.
The present plan is to grind down the the misalignment of 0.1" for a slow-loaded trolly.
Steve Baker of Konecranes will be back to grind down this ridge and load test at 500 lbs on Tuesday, OCT 1, 2013
|
Konecranes rescheduled the completion of the Vertex crane to Wednesday, Oct. 2 |
3624
|
Thu Sep 30 09:34:58 2010 |
steve | Update | General | vertex crane trolly drive fixed |
Quote: |
The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.
I crane was just turned on for for may be about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.
The crane is tagged out again and the controller box is cooling down.
|
Atm1, Vertex crane controller unit on horizontal I-beam.
Module CCES-407 1HP 2.3A 460V/3 phase on the right was replaced. Speed was increased to 30 Hz
Atm2, See burned insulation on black wire that was shorting to the large suppressor resistor on Atm3 One can see the pit marks on the right end of it.
This large power dissipater resistor got hot as the malfunctioning controller 407 broke down. Touching black power wire insulation melted and made a short.
So the heat was created and finally the fuses were blown. The unnecessary large fuses were replaced by small ones.
Fortunately we had one spare controller on hand that made this repair to be done fast.
We used the new Crane Safety Check list from LIGO-E1000379-v1 the first time yesterday before doors were removed. |
Attachment 1: P1060891.JPG
|
|
Attachment 2: P1060887.JPG
|
|
Attachment 3: P1060889.JPG
|
|
Attachment 4: P1060893.JPG
|
|
4165
|
Tue Jan 18 10:25:23 2011 |
steve | Update | PEM | vertex crane work this week |
The crane people are here. The Vertex chambers are covered with plastic. The PSL HEPAs will be running on high during the day.
It is going to be disturbingly noisy and dirty during the day. Please try start working in the evening if it can not wait till next week. |
3492
|
Tue Aug 31 02:50:45 2010 |
kiwamu | Update | CDS | vertex suspensions controlled by the new CDS |
I plugged the new CDS to the vertex suspensions.
Now PRM, SRM, ITMs, MCs and BS are under the control of the new CDS.
From now on we will never go back to the old system.
Though, the watchdogs are still running on the old system.
So if you need to turn on/off the watchdogs, you can simply enable/disable them from the usual medm screens. |
3699
|
Tue Oct 12 17:42:57 2010 |
yuta | Update | SUS | very first measurement of Q-values for MC1 |
Background:
Data aquisition system is fixed, and now we can use the Dataviewer to measure Q-values of the ringdowns for each DOF, each optics.
First of all, I measured MC1 suspention damping servo for a test.
What I did:
1. Used DAQ channels activated in this entry(#3690) to see and compare the ringdowns when the damping servo is on and off with the Dataviewer.
2. Plotted the data and fitted the ringdown using this formula;
p[0]*exp(-p[1]*t)*sin(p[2]*t+p[3])+p[4]
I used python's scipy.optimize.leastsq for the fitting.
3. Calculated the resonant frequency f0 and Q-value using following formulas;
f0=2*pi*sqrt(p[1]**2+p[2]**2)
Q=f0/(2*pi)/(2*p[1])
4. For plotting, I subtracted the offset(=p[4]).
All parameters I used for this measurement are automatically saved here;
/cvs/cds/caltech/burt/autoburt/snapshots/2010/Oct/12/13:07/c1mcs.epics
(-1,0,1 for all matrix elements, GAIN=3,3,3,150 for POS,PIT,YAW,SIDE)
Result:
Attached is the plot of each 4 DOF ringdown when servo is off and on.
"servo off" means off for that DOF. Servo for the other 3 DOFs are on.
As you can see clearly, the damping servo is working.
The resonant frequencies and Q-values calculated from the fitting are as follows;
|
servo off |
servo on |
f0 (Hz) |
Q |
f0 (Hz) |
Q |
POS |
0.97 |
large |
0.97 |
16 |
PIT |
0.71 |
96 |
0.73 |
6.9 |
YAW |
0.80 |
100 |
0.82 |
8.9 |
SIDE |
0.99 |
large |
0.99 |
27 |
Resonant frequencies and Q-values have about 1% and 10% error respectively.
I estimated it from my 2-time measurement of the POS ringdown.
Next work:
- Find and modify some scripts to optimize the matrix elements
- Calibrate the displacement
- Do the same thing for other optics
|
Attachment 1: MC1ringdown.png
|
|
3347
|
Mon Aug 2 10:26:15 2010 |
steve | Configuration | VAC | very slow pumpdown completed |
Quote: |
Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was closed and manual block was placed in the beam path. High voltage power supplies were checked to be off.
Pumping speed ~ 1 Torr/min was achieved at 1/8 of a turn opened roughing valve RV1
|
3 days pump down #69 completed. Thanks to Koji and Kiwamu who did more roughing on Saturday and Sunday. |
Attachment 1: veryslowpd.jpg
|
|
7232
|
Mon Aug 20 09:49:01 2012 |
Steve | Update | Cameras | video cameras in the DARK |
Quote: |
The problem with the glow on the ETMY face is due to the red light being scattered off of the optical table from the HeNe laser for the OL. Why is the red light hitting the table?
One way to fix the problem for the camera image is to insert a long pass filter (if Steve can find one).
Edmund Optics: NT62-874
Edmund Optics: NT65-731
Edmund Optics: NT32-759
|
Atm1, condition: all oplev lasers are off or blocked, green shutters are closed at the ends, PSL out put shutter is closed, all outside LED illuminating are off, all room lights are off
Only the OSEMs are on. ETMY and ITMX are still look like illuminated.
Atm2, condition: open PSL shutter. ETMY at 11 o'clock and ETMX 1 o'clock bright scattered spot of 1064 nm are visible
Atm3, condition: closed PSL shutter and restored all oplev He/Ne lasers, it is visible at ETMY
Next: I will disconnect power to OSEMs at ETMY |
Attachment 1: onlyOSEMs.jpg
|
|
Attachment 2: OSEMsand_IR.jpg
|
|
Attachment 3: OSEMsandOplev633.jpg
|
|
7215
|
Fri Aug 17 08:33:46 2012 |
Steve | Update | Cameras | video cameras in the dark |
Quote: |
I optimized the TM views with illuminator light on quad1 It actually looks better there.
I'll post a dark- OSEM light only in jpg tomorrow. ETMY camera is malfunctioning in dark condition now.
|
ALL illuminator lighting are off. ITMX and ETMY looks back lighted. I will check on their apertures.
In order to focus on 1064 resonant spots I tried to restore and align the arms by script. I only got flashes. |
Attachment 1: dark.jpg
|
|
7216
|
Fri Aug 17 09:34:27 2012 |
Koji | Update | Cameras | video cameras in the dark |
I used the LED illuminations at ETMX and BS yesterday for a tour.
I am afraid that I left them on. |
7217
|
Fri Aug 17 10:38:15 2012 |
Steve | Update | Cameras | video cameras in the dark |
> I used the LED illuminations at ETMX and BS yesterday for a tour.
> I am afraid that I left them on.
It was turned off before the picture was taken.
All LED illuminations were turned off. I checked them a few times. |
7219
|
Fri Aug 17 14:45:51 2012 |
rana | Update | Cameras | video cameras in the dark |
The problem with the glow on the ETMY face is due to the red light being scattered off of the optical table from the HeNe laser for the OL. Why is the red light hitting the table?
One way to fix the problem for the camera image is to insert a long pass filter (if Steve can find one).
Edmund Optics: NT62-874
Edmund Optics: NT65-731
Edmund Optics: NT32-759 |
7236
|
Mon Aug 20 18:10:44 2012 |
Jenne | Update | Cameras | video capture script copied over to real scripts directory |
The videocapture.py script is now in ...../scripts/general/ , along with the videoswitch.
Also, there's a button gui on the VIDEO medm screen to capture different camera views. |
10259
|
Wed Jul 23 10:39:18 2014 |
Steve | Update | Cameras | video quad processors replaced |
Quad processor 2 & 3 were replaced. |
2120
|
Mon Oct 19 18:14:28 2009 |
rob | Update | Cameras | video switch broken |
The Chameleon HB (by Knox) video switch that we use for routing video signals into the control room monitors is broken. Well, either it's broken, or something is wrong with the mv162 EPICS IOC which communicates with it via RS-232. Multiple reboots/resets of both machines has not yet worked. The CHHB has two RS-232 inputs--I switched to the second one, and there is now one signal coming through to a monitor but no switching yet. I've been unable to further debug it because we don't have anything in the lab (other than the omega iserver formerly used for the RGA logger) which can communicate with RS-232 ports. I've been trying to get this thing (the iserver) working again, but can't communicate with it yet. For now I'm just going to bypass the video switch entirely and use up all the BNC barrel connectors in the lab, so we can at least have the useful video displays back. |
8036
|
Fri Feb 8 12:43:26 2013 |
yuta | Update | Computers | videocapture.py now supports movie capturing |
I updated /opt/rtcds/caltech/c1/scripts/general/videoscripts.py so that it supports movie capturing. It saves captured images (bmp) and movies (mp4) in /users/sensoray/SensorayCaptures/ directory.
I also updated /opt/rtcds/caltech/c1/scripts/pylibs/pyndslib.py because /usr/bin/lalapps_tconvert is not working and now /usr/bin/tconvert works.
However, tconvert doesn't run on ottavia, so I need Jamie to fix it.
videocapture.py -h:
Usage:
videocapture.py [cameraname] [options]
Example usage:
videocapture.py MC2F -s 320x240 -t off
(Camptures image of MC2F with the size of 320x240, without timestamp on the image. MUST RUN ON PIANOSA!)
videocapture.py AS -m 10
(Camptures 10 sec movie of AS with the size of 720x480. MUST RUN ON PIANOSA!)
Options:
-h, --help show this help message and exit
-s SIZE specify image size [default: 720x480]
-t TIMESTAMP_ONOFF timestamp on or off [default: on]
-m MOVLENGTH specity movie length (in sec; takes movie if specified) [default: 0] |
8612
|
Wed May 22 00:42:13 2013 |
Koji | Summary | SUS | violin Q |
While looking at the decay of the violin mode of the PRM, I made a simple measurement of the decay rate.
Error signal: REFL33I
The peak @628Hz became 0.372 to 0.303 in 60 sec.
-> Half life of the amplitude T_{1/2} is 203sec.
Q = 4.53 f0 T_{1/2} = 5.8 x10^5 |
1611
|
Wed May 20 01:53:48 2009 |
rob, pete | Update | Locking | violin mode filters in drstep_bang |
Recently the watch script was having difficulty grabbing a lock for more than a few seconds. Rob discovered that the violin notch filters which were activated in the script were causing the instability. We're not sure why yet. The script seems significantly more stable with that step commented out. |
3875
|
Sat Nov 6 01:54:15 2010 |
Frank | Summary | Computers | virus definition file update on laptop for dinocam |
i took some pictures with the dinocam this afternoon. I used the laptop computer next to it using wireless lan connection to the caltech network to send the pictures to me.
The installed anti virus software was bitching about the old database and wanted to update that. As the installed virus definition database was from mid last year i agreed and started downloading the update. As the file was huge (~100MB) it wasn't finished when i left. computer is still running and probably waiting for instructions.
Will come back on the weekend to finalize the new virus definition file database installation. |