6804
|
Tue Jun 12 16:33:32 2012 |
steve | Update | SUS | PRM oplevs servo ON for confirmation |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012 |
6805
|
Tue Jun 12 17:04:55 2012 |
steve | Update | SUS | PRM oplevs servo is still bad |
Quote: |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012
|
It is still oscillating. Gains turned down to zero. |
6814
|
Wed Jun 13 11:19:05 2012 |
steve | Update | SUS | IDC receptacles clamped |
The MC_ IDC 64 pin cables from sat. amplifiers to junction-interface-board towards whitening - dewhitening at the back of rack 1 X 5 are finally clamped with
All other sus cables of the same kind have the correct short latch arm to lock them in for reliable contact. |
6844
|
Thu Jun 21 09:01:18 2012 |
steve | Update | STACIS | the resurrection of STACIS -surf |
There is a small wood cabinet under the south end flow bench, labeled STACIS.
Unit is complete with extension cards and cables. |
6845
|
Thu Jun 21 09:10:08 2012 |
steve | Update | PEM | flow bench must be running all times |
The south end flow bench HEPA filter should be run all times. You can turn it off for a measurement or two but remember we are storing clean optics there.
The zero count bench will reach room particle count ~ 10,000 in one minute. |
6848
|
Thu Jun 21 15:00:55 2012 |
steve | Update | SAFETY | SURFs 2012 safety training |
Masha, Eric, Yaakov, Liz and Sasha received 40m specific basic safety training. |
6860
|
Sat Jun 23 18:44:15 2012 |
steve | Update | General | power surge has no effect on the lab |
I was notified by CIT Utilities that there was a power surge or short power outage this after noon.
Lab conditions are normal: c1ioo is down. The south arm AC was off......I turned it back on. |
6864
|
Mon Jun 25 08:21:40 2012 |
steve | Update | General | AC power disturbance on Sat |
Quote: |
I was notified by CIT Utilities that there was a power surge or short power outage this after noon.
Lab conditions are normal: c1ioo is down. The south arm AC was off......I turned it back on.
|
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: CAMPUS
Date: Saturday, June 23, 2012
Time: 3:46 P.M.
Interruption: Electrical Power Disturbance
Contact: Tom Brennan, x-625-395-4984
*The City of Pasadena Water & Power Department had a 34,000-volt line event on Saturday June 23 at 3:46 p.m. This caused a city wide disturbance on the power grid. The Campus did not lose electrical power. However, the disturbance may have affected sensitive electronic equipment.
(If there is a problem with this Interruption, please notify the Service Center X-4717 or the above Contact as soon as possible.
If no response is received we will proceed with the interruption.)
Jerry Thompson,
Interim Director of Campus Operations & Maintenance
|
6894
|
Fri Jun 29 11:02:00 2012 |
steve | Update | VAC | the vent is at 500 torr |
Steve, Yuta and Jamie
Jam nuts were checked and oplev servos were turned off. Sus summery is below with strain gauge values. Are the strain gauge values have any meaning when the PZT contorrels are off?????????????????? |
6895
|
Fri Jun 29 13:11:31 2012 |
steve | Update | VAC | 40m IFO at atm |
The 4 hrs vent plot at 3 torr/min rate.
Nitrogen was used from 1e-6 torr to 35 torr at intake pressure 14 PSI
The rest was filled with 5 cylinders of Instrument Grade Air at intake pressure 14 PSI
We can start opening chamber at 3 pm today
|
6898
|
Sat Jun 30 18:31:38 2012 |
steve | Update | IOO | input telescope beam clipping on Faraday |
We could set up a simple pick off after the Faraday and bring it out the north window of IOO chamber. No monitor needed, just take the cover off when you want to see it.
Most people have no idea how to get the MC through the F |
6906
|
Tue Jul 3 17:23:50 2012 |
steve | Update | VAC | pumpdown completed |
Vacuum Normal State is reached in 9 hours. CC1 = 2e-5 Torr
Aux dry pump #3 is still running. The RGA is not pumped yet. |
6927
|
Fri Jul 6 08:38:04 2012 |
steve | Update | Computers | time out |
Why do we have these timing blanks? |
6929
|
Fri Jul 6 09:27:40 2012 |
steve | Update | VAC | 4 days at atm |
I'm looking for some movement indicators of the vent-pump down events.
|
6930
|
Fri Jul 6 09:52:35 2012 |
steve | Update | VAC | pump down hick up |
I can not understand what really happened here with CC1 gauge or there was really a pressure glitch.
attachment 1, pump down day 3 with 4th of July fireworks in the lab
attachment 2, before and after vent in 9 days
|
6959
|
Wed Jul 11 11:18:21 2012 |
steve | Update | PEM | more seismic noise next week |
The fabricators of the big flume in the CES lab have begun testing the sediment feed system which is the noisiest component and plan to test off and on during the day for the next week.
Please let me know if you detect the noise or have any issues.
Brian Fuller
phone: 626-395-2465 |
6970
|
Thu Jul 12 16:27:04 2012 |
steve | Update | VAC | drypump changed |
TP2 dry_pump was changed at intake pressure 982 mTorr at 84,889 hrs This seal hold up for one year.
The rebuilt pump seal performing well at 28 mTorr |
7044
|
Fri Jul 27 14:28:36 2012 |
steve | Update | VAC | cold cathode gauges |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
7047
|
Mon Jul 30 09:00:18 2012 |
steve | Update | PSL | PMC is still not fixed |
The PMC was locking right the way, but it's transmission would not go up. Finally I get it back up by moving the "sticky" DC Gain slider up and down a few times. |
7051
|
Mon Jul 30 15:49:16 2012 |
steve | Update | VAC | cc1 switched |
Quote: |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1
This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr
The real pressure is 2e-6 torr |
7056
|
Tue Jul 31 08:01:22 2012 |
steve | Update | VAC | cc1 switched |
Quote: |
Quote: |
Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current. We should replace them at the next vent. I'm buying 4 at $317ea
|
We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1
This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr
The real pressure is 2e-6 torr
|
cc1h spikes closed VM1 last night. VM1 is opened. |
7071
|
Wed Aug 1 16:38:46 2012 |
steve | Update | SUS | spare SRMU 03 optic moved |
SOS optics prepared to be hanged are moved from the South Flow Bench to S15 Clean Cabinet.
SRMU 03 (1-25-2010) specification summery E080460-05-D, older vintage SRM 01 and PRM 02 (need more specification)
There was one NOT MARKED SOS with two broken magnets on its face. This is labeled ???
This was done to prepare clean space for TIP-TILT drive- test set up.
The existing cable from 1X5 can reach only to the south end: from whitening filter to satelite amp. This will be good for future test of suspensions.
We need to make new cable from 1 X 1 to the south end = 40m long |
7087
|
Mon Aug 6 07:59:33 2012 |
steve | Update | SUS | PRM oplevs servo is still bad |
Quote: |
Quote: |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012
|
It is still oscillating. Gains turned down to zero.
|
Earthquake test our suspensions PRM damping restored. Oplev servo gains turned to zero. |
7088
|
Mon Aug 6 09:46:31 2012 |
steve | Update | IOO | poweroutage turns laser off |
. Power outage turned off the PSL Innolight laser on Sunday afternoon. It was turned back on and locked happily right on. The green lasers were not effected.
CALIFORNIA INSTITUTE OF TECHNOLOGY
FACILITIES MANAGEMENT
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: CAMPUS WIDE
Date: SUNDAY, AUGUST 6, 2012
Time: 3:41 PM
Interruption: ELECTRICAL POWER DISTRIBUTION
Contact: MIKE ANCHONDO, X-4999, OR TOM BRENNAN, X-4984
* THIS PAST SUNDAY AFTERNOON ABOUT 3:40 PM, PASADENA WATER AND POWER
EXPERIENCED A FAULT ON THEIR POWER DISTRIBUTION SYSTEM. THIS CAUSED
A SEVERE VOLTAGE SAG WHICH AFFECTED THE CALTECH CAMPUS. THE FAULT WAS
NOT ON A CALTECH CIRCUIT.
(If there is a problem with this Interruption, please notify
the Service Center X-4717 or the above Contact as soon as possible.
If no response is received we will proceed with the interruption.)
Jerry Thompson,
Interim Director of Campus Operations & Maintenance
|
7089
|
Mon Aug 6 10:53:32 2012 |
steve | Update | VAC | status: vauum normal |
The power outage did not have any effect on the vacuum system. I had to open VM1 to the RGA because of flaky CC1 cold cathode gauge fluctuations.
We are running on the vertically positioned CC1 again.
Note: rga scans with closed VM1 are back ground scans. |
7091
|
Mon Aug 6 16:48:43 2012 |
steve | Update | SUS | SRM oplev is clipping |
The SRM oplev beam is clipping. |
7106
|
Tue Aug 7 16:11:23 2012 |
steve | Update | SUS | optical table box wall proposal |
Sanwiched wall as shown: 1" clear acrylic, 2 layers of 0.004" thick "window tint", 1 layer of 0.007" thermashield and 0.125" yellow acrylic
Visibility: 70 %, Transmission of 1064 nm 2-3 % at 0-50 degrees incident power density 0.7 W/mm2
Max power 100 mW
|
7154
|
Sun Aug 12 01:21:26 2012 |
steve | Update | SAFETY | exit door left unlocked |
Caltech security called me at 1am Sunday. Control room emergency exit door was found unlocked!
It is your responsibility to lock door if you unlocked it !
|
7160
|
Mon Aug 13 15:31:09 2012 |
steve | Update | General | larger optical tables at the ends |
I'm proposing larger optical tables at the ends to avoid the existing overcrowding. This would allow the initial pointing and optical level beams to set up correctly.
The existing table is 4 x 2 would be replaced by 4' x 3' We would lose only ~3" space toward exist door.
I'm working on the new ACRYLIC TABLE COVER for each end that will cost around $4k ea. The new cover should fit the larger table.
Let me know what you think. |
7194
|
Wed Aug 15 16:01:47 2012 |
steve | Update | General | larger optical tables at the ends ? |
The drawing of the 4' x 2' table cover can be seen at entry #6190 The new proposed wall #7106 The yellow acrylic would be ~ 0.25" thick and it will be the inside. It is not shown on the drawing.
Question remaining: should get a larger table 4' x 3' as outlined by red lines and make new cover to fit this
The oplev beam path needs larger incident angle to get in and out of the chamber: REMOVE BOTTLENECK for easy traffic
Moving the existing table closer to ETMY chamber - as Jamie suggested- would help but there is no room for this solution.
The larger table solve this issue and leave more room for initial pointing, arm transmitted and future experiments.
Other benefits: no tube to make between table and chamber. It is easier to make the the larger box air tight.
The new isolation box with feed through, cover, seals will cost $4-5K ea
|
7248
|
Wed Aug 22 11:41:20 2012 |
steve | Update | General | grout plate for optical table at the ends |
Reinforced concrete grout plate for existing carbon steel stands at the ends.
|
7458
|
Mon Oct 1 17:03:01 2012 |
steve | Update | SUS | ETMY oplev relayed |
Quote: |
Quote: |
Quote: |
The typical sign of a dying gas laser is that it glows for a few minutes only. The power supplies are fine.
Two new JDS - Uniphase 1103P lasers ( NT64-104 ) arriving on Monday, May 21
|
Yesterday I swapped in new He/Ne laser with output power 3.5 mW The return spot on qpd is large ~6mm in diameter and 20,500 counts
The spot size reduction require similar layout as ETMX oplev.
|
The oplev path is relayed and the spot size on the qpd is reduced. I still have to clean up and replace "Miki Mouse" lens holder.
There was no IP-ANG coming out of the chamber at this time!
|
I did relayed the oplev path with new f 500 mm lens |
7538
|
Fri Oct 12 16:59:26 2012 |
steve | Update | SUS | TT PITCH damping |
Quote: |
Quote: |
We can only decide the need of pitch damping when the coils are activated.
|
Could you tell us why? Are you thinking about induced current damping?
|
I was wrong The instability will be the same when the coils are actuated. |
7544
|
Mon Oct 15 08:08:33 2012 |
steve | Update | SUS | PRM damping restored |
Quote: |
Quote: |
Quote: |
Quote: |
Yuta claims he fixed the PRM oplev by centering it the other day, but no one has left it on and watched it for a long while, to make sure it's okay. We watched it now for ~2 min, and it was good, but we're leaving the oplevs off anyway for the night. Tomorrow we should restore PRM (it's currently restored), turn on the oplevs, and let it sit to make sure it doesn't go crazy.
|
PRM oplev servo was turned on with PITgain 0.5 and YAWgain -0.7
Note: gain settings were PIT 1.0 and YAW --0.5 on Jun 1, 2012 that I measured Feb 23, 2012
|
It is still oscillating. Gains turned down to zero.
|
Earthquake test our suspensions PRM damping restored. Oplev servo gains turned to zero.
|
The PRM damping restored. Oplev PIT gain 0.15 and YAW gain -0.3 turned to zero. |
7652
|
Thu Nov 1 08:48:42 2012 |
steve | Update | Alignment | progress, then setback - trend of BS table shift |
Quote: |
But these jumps in the OSEMs are all at the level of 10-20 microns. Seems like that wouldn't be enough to account for anything; 20 microns / (pend length) ~ 50-60 microradians.
|
BS table and suspensions are fine. |
7831
|
Fri Dec 14 09:05:04 2012 |
steve | Update | PEM | TT after eq 6.1 |
SRM, ITMY and MC3 moved some what, but how are the TT? It may worth looking at them before we vent. |
8240
|
Wed Mar 6 11:33:09 2013 |
steve | Update | SAFETY | safety audit 2013 |
Recommended correction list:
1, refill- upgrade first aid boxes
2, maintain 18" ceiling to bookshelf clearance so the ceiling fire sprinklers are not blocked: room 101
3, label chilled water supply & return valves in IFO room
4, calibrate bake room hoods annually
5, update safety sign at fenced storage
40m still to do list:
1, clean and measure all safety glasses
2, annual crane inspection is scheduled for 8am March 19, 1013
3, make PSL encloser shelf earthquake proof
Do you see something that is not safe? Add it to this list please.
|
8287
|
Wed Mar 13 16:04:24 2013 |
steve | Update | SAFETY | laser safety glasses checked |
All safety glasses were cleaned in soapy water by Bob. I measured their transmission at 1064 nm, 150 mW, beam diameter 1.5 mm They are in working order, no transmission.
Inventory:
10 pieces of KG-5, fit over, from Laser Safety
4 pieces of KG-5, std size, from Drever Lab, best visibility
1 piece of KG-5 coated for visible, std size, from Kentek
15 pieces of green-plastic LOTG-YAG, fit over, from UVEX
7 pieces of green-plastic B-D+S 137, std areo fit, from Sperian
3 pieces of green-plastic, old Thorlab, fit over
2 pieces of green-plastic, fit over, from Laservision
8 pieces of braun- plastic, fit over, for green & IR protection, from UVEX & Thorlabs |
8309
|
Tue Mar 19 10:30:00 2013 |
steve | Update | SAFETY | crane inspection 2013 |
Professional crane inspector: Fred Goodbar found two small leaks at the Vertex trolley as he was conducting the annual inspection of the 40m cranes. Otherwise the cranes are in safe condition. |
8661
|
Fri May 31 10:25:17 2013 |
steve | Update | safety | first aid kits refilled |
Quote: |
Recommended correction list:
1, refill- upgrade first aid boxes
2, maintain 18" ceiling to bookshelf clearance so the ceiling fire sprinklers are not blocked: room 101
3, label chilled water supply & return valves in IFO room
4, calibrate bake room hoods annually
5, update safety sign at fenced storage
40m still to do list:
1, clean and measure all safety glasses
2, annual crane inspection is scheduled for 8am March 19, 1013
3, make PSL encloser shelf earthquake proof
Do you see something that is not safe? Add it to this list please.
|
Restocked First Aid Kits Location:
Main entrance, room 100
Drill press - above N2 cylinders, room 103
Control room, next to fire extinguisher, room 102
Vertex-north wall, IFO room 104
ETMY - right on ends light switches, IFO room 104_ east end
ETMX - on vertical I-beam of crane, IFO room 104_south end
Behind 1X3 Rack, on south wall - under instrument breakers panel PC-1, IFO room 104
Last thing remaining to be fixed from 2013 Safety Audit:
replace book shelf with 83" height
|
8687
|
Thu Jun 6 16:33:19 2013 |
steve | Update | safety | updated laser inventory |
Updated laser inventory and operator list. They are posted in the 40m wiki and entry doors of the 40m IFO room.
Let me know if this list needs correction.
Lightwave M126N-1064-700 NPRO sn 337 in the PSL enclosure got connected to local emergency shut off switch. This is a LIGO operational safety requirement.
|
9090
|
Fri Aug 30 08:08:29 2013 |
steve | Update | safety | fire horns-flashers tested OK |
We had fire alarm tests and evacuation drills at 1:30pm yesterday. All flashers and horns are functioning unbearably loud and bright including clean assembly room. |
9653
|
Wed Feb 19 08:07:01 2014 |
steve | Update | safety | annual laser safety glasses check |
All 40m laser safety glasses are cleaned and measured this morning. Bring your own safety glasses if you have to enter the 40m IFO room.
Glasses were washed in 1% Liquinox water solution and their transmission measured at 165 mW, 2 mm OD beam of 1064 nm |
9672
|
Tue Feb 25 16:54:57 2014 |
steve | Update | safety | safety audit 2014 |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops. |
9681
|
Thu Feb 27 13:11:13 2014 |
steve | Update | safety | safety audit correction |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Linus-1, Nodus and others ac cords can be moved over to new blank yellow extension cord with multiple recepticals.
Remove two red extension cords going to Smart UPS |
9699
|
Thu Mar 6 11:43:17 2014 |
steve | Update | General | Guralp control unit |
CMG-40T handheld controller unit is missing its power supply. In order to zero the instrument one has to apply plus and minus DC voltage.
The wiring on this 10 pin Amphenol PT02E-12-10P is shown. |
9704
|
Fri Mar 7 16:56:17 2014 |
steve | Update | IOO | IOO qpds centered |
Quote: |
Quote: |
The IMC has not been behaving well since this morning and totally not happy when Q was finishing his measurements. The WFS servo had large offsets in pitch. Looking back at the trend and using ezcaservo to restore the suspensions did not help.
I realigned the IMC and brought TRANS SUM to ~18000 and MCREFL to < 0.5. The spot positions are not very good; nearly 2 mm off in pitch on MC1 and MC3. But after the alignment of MC, the WFS servo offsets were below +/-20.
The MC has been locked stably with WFS servo ON for the last few hours.
P.S. I did not touch the WFS pointing or reset the WFS offsets.
|
MC remained locked with WFS enabled all through last night and this morning. Koji dropped by and looked at the MC. The MC WFS servo, though stable, was at the edge of becoming unstable. This was because I did not touch the WFS pointing on the QPDs yesterday after realigning. So I recentered the WFS, reset the WFS filterbank offsets and reenabled the servo.
I measured the spot positions on MC mirrors for reference.
Spot positions in mm (MC1,2,3 pit MC1,2,3 yaw): [1.405767579680834, 0.79369009503571208, 1.3220430681427462, -1.2937873599406551, -1.1704264340968924, -1.2518046122798692]
|
|
9705
|
Mon Mar 10 09:28:48 2014 |
steve | Update | IOO | IOO pointing 2 days |
Morning seconds without adjustment.
|
9725
|
Thu Mar 13 16:05:48 2014 |
steve | Update | safety | safety audit 2014 |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1 |
9730
|
Mon Mar 17 10:50:58 2014 |
steve | Update | safety | 2014 annual crane certification |
Quote: |
Quote: |
We had our annual safety inspection today. Our SOPs are outdated. The full list of needed correction will be posted tomorrow.
The most useful found was that the ITMX-ISCT ac power is coming from 1Y1 rack. This should actually go to 1Y2 LSC rack ?
Please test this so we do not create more ground loops.
|
Annual crane inspection is scheduled for 8-11am Monday, March 17, 2014
The control room Smart UPS has two red extension cords that has to be removed: Nodus and Linux1
|