  364   Fri Mar 7 17:10:01 2008 Max JonesUpdateComputersNoise Budget workNoise budget has been moved to the svn system.
A checked out copy is in the directory caltech.
From now on, I will try to use the work cycle
  
  363   Fri Mar 7 00:47:54 2008 ranaConfigurationPEMRanger SS-1Yesterday evening around 7:30 PM, I changed
the Ranger seismometer from a 
vertical to a horizontal seismometer. To
 ss1.pdf 
  362   Thu Mar 6 00:17:37 2008 robUpdateLockingDD handoff workingGot the DD (double demod) handoff scripts
working tonight, with just the DRMI.  So,
now acquisition with the single demod signals
  
  361   Wed Mar 5 17:35:24 2008 ranaUpdateIOORFAM during MC lockI used an ezcaservo command to adjust the
offsets for Alberto's StochMon channels.
They [B][COLOR=green]are all
 rfam.pdf 
  360   Wed Mar 5 12:51:48 2008 JohnSummaryLSCInitial Ligo Arm finesse versus lambdaI've taken the coating recipes for the initial
ligo arm cavity from Rana's web page (ligo.caltech/edu/~rana/mat/)
and plotted the finesse as a function of
 FofLambdaLIGOI.jpg 
  359   Wed Mar 5 12:35:09 2008 JohnSummaryComputer Scripts / ProgramsPlot photodiode responses in MatLabA matlab function to plot the responses of
photodiodes. There's still plenty of room
for improvement but it should work for all
 PD6DeltaT.jpgPD6.jpgPDbw.jpg 
  358   Tue Mar 4 23:22:32 2008 robDAQComputersc1susvme1&2 rebooted
I found that some channels from c1susvme1
and c1susvme2 were not being recording by
  
  357   Tue Mar 4 20:14:02 2008 ranaConfigurationIOOMC AlignmentThe MC alignment was pretty far off. We were
getting TEM01 mode locks only. 
Rather than inspect what happened I just
  
  356   Tue Mar 4 19:14:09 2008 ranaConfigurationCDSTDS & SVN[COLOR=purple][I]Matt, Rob, Rana[/I][/COLOR]

[B][COLOR=chocolate]Today we added the TDS
  
  355   Tue Mar 4 10:08:21 2008 robUpdateComputersgreen lights unreliable when c0daqctrl down
So far I've tried powering off the framebuilder,
power-cycling the RAID (it was showing an
  
  354   Tue Mar 4 00:42:51 2008 ranaUpdateComputersFB0 still down ?The framebuilder is still down. I tried restarting
the daqd task and resetting the RFM
switch like it says in the Wiki but it still
  
  353   Mon Mar 3 19:34:40 2008 ranaUpdateComputers RFM Network are down[quote]The CODAQ_RFNETWORK are down, except
C1SUSVME & AWG[/quote]
All of the FE machines were found to be down
  
  352   Mon Mar 3 13:58:10 2008 steveUpdateComputers RFM Network are downThe CODAQ_RFNETWORK are down, except C1SUSVME
& AWG
  
  351   Mon Mar 3 09:25:33 2008 steveUpdateVACrga scan logging is working now[quote][quote]The rga head and controller
are running fine, but the data logging is
not.[/quote]
 rgalogworks.jpgcc1.jpg 
  349   Sun Mar 2 23:43:45 2008 ranaHowToLSCPD6 responseJohn's PD plotting script is superior to all
of the ones we had before; lets make him
post the script so we can all use it.
  
  348   Fri Feb 29 13:51:17 2008 JohnSummaryLSCPD6 responseI checked the response of PD6 using the AM
laser. It looks happy enough.[IMG]elog:348/1[/IMG]
 PD6Attempt3.jpg 
  347   Thu Feb 28 19:49:21 2008 robUpdateElectronicsRF Monitor (StocMon)
[quote]
With Ben, we hooked up the RF Monitor box
  
  346   Thu Feb 28 19:37:41 2008 robConfigurationComputersmultiple cameras running and seisBLRMS[quote]1) Mafalda is now connected via an
orange Cat5E ethernet cord to the gigabit
ethernet switch in rack in the office space.
  
  345   Thu Feb 28 16:19:37 2008 josephbConfigurationComputersMafalda rewired and multiple cameras running1) Mafalda is now connected via an orange
Cat5E ethernet cord to the gigabit ethernet
switch in rack in the office space.    It
  
  344   Thu Feb 28 13:04:59 2008 robUpdateVACrga logging working again[quote]The rga head and controller are running
fine, but the data logging is not.[/quote]
  
  343   Thu Feb 28 12:31:33 2008 robBureaucracyComputer Scripts / ProgramsMDV library does not work at "LINUX 2"[quote]
While working on Thursday evening with Matlab
scripts "dttfft2" and "get_data", I noticed
  
  342   Wed Feb 27 22:05:03 2008 JohnUpdateLSCAuxiliary lockingA summary of the status of the auxiliary arm
locking effort.
  
  341   Tue Feb 26 20:24:04 2008 AndreySummaryTMISorrowAs for that plot of three-dimensional surface,
I indeed was wrong with the axis "Q_ETMX-Q_ITMX"
(I put there wrong string "Q_ITMX-Q_ETMX").
  
  340   Sun Feb 24 10:51:58 2008 tfFrogsEnvironment40m in phdcomics?[url=http://www.phdcomics.com/comics/archive.php?comicid=977][img]http://www.phdcomics.com/comics/archive/phd021308s.gif[/img][/url]   
  339   Fri Feb 22 21:19:38 2008 AndreyBureaucracyComputer Scripts / ProgramsMDV library does not work at "LINUX 2"
While working on Thursday evening with Matlab
scripts "dttfft2" and "get_data", I noticed
  
  338   Fri Feb 22 20:42:44 2008 AndreySummaryComputer Scripts / ProgramsIt seems I succeeded in theoretical simulations
I am pretty happy at this moment.
 RMS_peak_08Hz-Theoretical.pngRMS_peak_08Hz-QI-QE.pngRMS_peak_3Hz-Theoretical.pngRMS_peak_broad-interv-Theoretical.png 
  337   Fri Feb 22 16:47:54 2008 robUpdateElectronicsBaloneyWell I guess Rana didn't study too hard at
Professor School, either.  If he'd even bothered
to actually read John's entry, he might have
 bustedHP.mov 
  336   Fri Feb 22 15:16:33 2008 AndreyUpdatePEMITMX Accelerometer is NOT broken
As I wrote in message 330, there was a bad
signal from ITMX accelerometer. I have found
 Accelerom-ITMX-Feb23.jpgAccelerom-ETMX-Feb23.jpg 
  335   Fri Feb 22 14:45:06 2008 steveUpdateMOPAlaser power levels
At the beginning of this 1000 days plot shows
the laser that was running at 22C head temp
 lpower1000d.jpg 
  334   Fri Feb 22 11:13:15 2008 robUpdateElectronicsRF Monitor (StocMon)[quote] It took some times because the written
procedure to start the chiller is not very
precise.[/quote]
  
  333   Fri Feb 22 11:11:00 2008 robUpdateElectronicsREFLDD problem found
I used a network analyzer that actually works
to find a problem in the REFLDD electronics
  
  332   Fri Feb 22 08:33:18 2008 AlbertoUpdateElectronicsRF Monitor (StocMon)[quote]I put the amplifiers next to the monitor
on the PSL table, layed the power and the
RF SMA cables out to the rack. I'm powering
  
  331   Fri Feb 22 08:29:07 2008 AlbertoUpdateElectronicsRF Monitor (StocMon)[quote]I put the amplifiers next to the monitor
on the PSL table, layed the power and the
RF SMA cables out to the rack. I'm powering
  
  330   Fri Feb 22 02:51:20 2008 AndreyUpdatePEMAccelerometer ITMX seems to be broken
As people probably know,
 Accelerom-EYMX-Feb22.jpgAccelerom-ITMX-Feb22.jpg 
  329   Thu Feb 21 19:55:46 2008 ranaUpdateElectronics2 BNC Cables, 1 TeeI'm not sure where [COLOR=purple]Ward and
Miller went to Analyzer school[/COLOR], but
it was probably uncredited.
  
  328   Thu Feb 21 18:29:28 2008 JohnSummaryGeneralHP Network Analyser AnalyzerThe HP 4195A network analyser may be broken,
measurements below 150MHz are not reliable.
Above 150MHz everything looks normal. This
  
  327   Thu Feb 21 09:56:26 2008 steveUpdatePSLthe laser is backThe laser and the psl recovered. 
The water chiller temp is 19.98C and head
temp 18.4C
 laserisback.jpg 
  326   Wed Feb 20 16:24:37 2008 steveUpdatePSLthe laser is recovering slowlyHead temp is still 20.5C and decreasing slowly.
Power output 2.9W 
NPRO power 22 mW is increasing as head is
 laserecoverring.jpg 
  325   Wed Feb 20 11:34:17 2008 steveUpdatePSLlaser head temp is upMOPA head temp is running at 20.3C now
Nomally it is at 18.5C
 htempup.jpg 
  324   Tue Feb 19 18:28:41 2008 JohnUpdatePEMMore seismic in Baja CaliforniaSteve spotted more activity from the same
quake. 
  
  323   Tue Feb 19 15:21:47 2008 AndreyUpdateSUSEarthquake tripped watchdogs in ETMY, ITMY
According to the web-page http://earthquake.usgs.gov/eqcenter/recenteqsus/Quakes/ci14351140.php
,
  
  322   Tue Feb 19 10:14:13 2008 steveUpdateVACrga logging needs helpThe rga head and controller are running fine,
but the data logging is not.
  
  321   Mon Feb 18 12:04:39 2008 AlbertoUpdateElectronicsRF Monitor (StocMon)I put the amplifiers next to the monitor on
the PSL table, layed the power and the RF
SMA cables out to the rack. I'm powering
 DSC_0443.JPG 
  320   Fri Feb 15 22:16:04 2008 AndreyUpdateComputersMATLAB is not working: "Licence checkout failed"
For some unknown to me reason, 
  
  319   Fri Feb 15 10:28:44 2008 ranaUpdateComputersNoise budget code changes[quote]In cvs/cds/caltech/NB/matlab/utilities/LSCmodel.m
at line 146
I have hardwired in changes to struct lsc.
  
  318   Thu Feb 14 17:21:53 2008 Max JonesUpdateComputersNoise budget code changesIn cvs/cds/caltech/NB/matlab/utilities/LSCmodel.m
at line 146
I have hardwired in changes to struct lsc.
  
  317   Thu Feb 14 15:05:18 2008 robDAQDMFseisBLRMS 1.1

> Also, for reasons of aesthetics, I changed
  
  316   Thu Feb 14 15:04:53 2008 robDAQDMFDMF delay
Sometime ago I edited seisBLRMS to keep of
track of how long it was taking to write
 DMFdelay.png 
  315   Wed Feb 13 20:37:11 2008 JohnUpdateLSCFibre locking - FiberSam and I observed fringes in the light reflected
from the Y arm. These fringes are due to
the sidebands and not the carrier. To improve
  
  314   Wed Feb 13 11:41:00 2008 AlbertoUpdateElectronicsSome characterization of the RF Monitor Box (StocMon)I'm attaching a table with some measurements
and the power spectrum from the pd to help
evaluate the numbers.
 CircuitCharacterization.pngalberto.spectrum3.png 