40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 333 of 339  Not logged in ELOG logo
    Reply  Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp 
New Wiha 28504 torque
wrench for SOS wire clamping. It's range 7.5  - 20 in-lb in 0.5 steps [ 0.9 - 2.2 Nm ] Audible and perceptible click when the pre-set torque has
been attained at ±6% accuracy.  
Entry  Thu Apr 23 15:40:41 2015, Steve, Update, General, torque for 1/4-20 snapon.jpgQJR117E.jpg
 

Few 1/4 -20 socket cap head screw with washers were tested for optimum torque.

QJR 117E Snap On  torque wrench was used. I found that 40 lb in was enough.
    Reply  Fri Apr 24 18:13:36 2015, rana, Update, General, torque for 1/4-20 
For 1/4-20 bolts made of 18-8 Stainless Steel, the recommended torque varies from 65-100 inch-pounds, depending upon the application,
the lubrication, how loose the bolt is, if there's a washer, etc.

For our case, where we are going into a tapped, ferromagnetic stainless table, its less clear, but it will certainly by in the 60-80 range. This
Entry  Sat Mar 28 03:21:49 2015, den, Update, LSC, towards angular ff 
Tonight I measured seismic noise coupling to beam spot on PR2. There is coherence of 0.9 from X to PIT and Y to YAW around the stack resonances. TF was
fited using vectfit and put into static matrix of oaf in the elements T240X -> PRM PIT, T240Y -> PRM YAW. I think we should actuate on the error
point of the PRM OL but I decided not to go for a model change tonight. Data from seismometers and POP QPD was obtained during the UTC time 04:06:00 -
Entry  Fri Mar 21 09:02:03 2008, steve, Update, VAC, tp 2 failed 
Small turbo #2 is the forepump of the maglev.
It failed last night, shut down the  maglev and interlock closed V1
Ifo pressure is 20 mTorr now. The Yarm was still locked at 8am this morning.
    Reply  Fri Mar 21 11:54:38 2008, rob, Update, VAC, tp 2 failed 
[quote]Small turbo #2 is the forepump of the maglev.
It failed last night, shut down the  maglev and interlock closed V1
Ifo pressure is 20 mTorr now. The Yarm was still locked at 8am this morning.
Entry  Thu Mar 20 15:28:20 2008, steve, Update, VAC, tp2 's drypump replaced 
The fore pump of tp2 was replaced at fore line pressure 998m Torr
Entry  Fri Jan 9 16:52:18 2009, steve, Update, VAC, tp3 forline pump replaced 
Alberto took 40m vacuum 101 class as we replaced the drypump at the annulus pump line.

He is still not authorized to use the monster 2 3/8" open end wrench that is 36" long.
Entry  Fri May 21 16:37:35 2010, steve, Configuration, VAC, tp3's drypump replaced 
Bob replaced the tipseal in an other drypump and I swapped it in. TP3 turbo is running again, it's foreline pressure is 40 mTorr. The RGA is still off
Entry  Fri Oct 9 01:31:56 2009, rana, Configuration, DAQ, tpchn mystery 
Does anyone know if this master file is the real thing that's in use now? Are we really using a file
called tpchn_C1_new.par? If anyone sees Alex, please get to the bottom of this.
allegra:daq>pwd
    Reply  Fri Oct 9 14:23:53 2009, Alex Ivanov, Configuration, DAQ, tpchn mystery 
"Yes. This master file is used."


    
        
            Quote:
        
        
            
Entry  Mon Nov 12 14:09:19 2007, rob, DAQ, General, tpman dead on fb40m 
The testpoint manager was dead on fb40m.  I know I re-started it sometime after the power outage, so something must have killed it.  If you get an error
from DTT like
"diagnostic kernel does not support: testpoints", then log into fb40m as root, check for the tpman with a [U][B]ps -ef | grep tpman[/B][/U].  If it's not
    Reply  Sun Mar 22 23:16:41 2009, rana, DAQ, Computer Scripts / Programs, tpman restart 
Could get testpoints but couldn't start excitations. Restarted tpman on daqawg. Works now.

[COLOR=orange] Still no log file.[/COLOR] X-(
    Reply  Wed Jan 7 14:16:27 2015, Jenne, Update, LSC, trans QPDs realigned 
Now that both end transmission QPDs have the line filters, I aligned them.
I locked and aligned the IR using the ASS, then went to each end table and put the beam in the center of the QPD.
Entry  Sun Jan 10 13:32:09 2010, Haixing, Update, SUS, transfer function measurement of the quadrant maglev circuit  6x
I have assembled the circuit and the control box for the quadrant magnetic levitation yesterday. The final setup is shown
in the figure below:
    Reply  Sun Jan 10 15:47:26 2010, Koji, Update, SUS, transfer function measurement of the quadrant maglev circuit  
1. Why do all of the BNCs have no GND connection? Each should have the individual cables to the ground. Each signal line and the corresponding ground
line should be twisted together.
2. This looks the (usual) oscillation of the V-I conversion stage but I can't tell anything as I don't have the circuit diagram of the whole circuit.
    Reply  Sun Jan 10 16:50:34 2010, Haixing, Update, SUS, transfer function measurement of the quadrant maglev circuit  


    
        
            Quote:
        
        
            
            1. Why do all of the BNCs have no GND connection? Each should have the individual cables to the ground. Each signal
    Reply  Sun Jan 10 17:15:25 2010, Koji, Update, SUS, transfer function measurement of the quadrant maglev circuit  
1. Yes. That is the bad. You should eventually replace the BNCs to the isolated ones.
2. OK. I like to emphasize again that everyone works on electronics should read data sheets more carefully
and seriously because they have many important practical instructions to exploit full performance of the components. 
Entry  Fri Feb 18 15:05:49 2011, kiwamu, Update, Green Locking, transfer function of angle to beat note (length)  a2l_TF.png
[Koji and Kiwamu]
 We took transfer functions (TF) from the angle excitations at
ETMX and ITMX to the green beat note signal (i.e. angle to length TF).
Entry  Tue May 22 00:23:45 2012, Den, Update, CDS, transmission error monitor Screenshot.png
I've started to create channels and an medm screen to monitor the errors that occur during the transmission through the RFM model. The screen will show
the amount of lost data per second for each channel.
Not all channels are ready yet. For created channels, number of errors is 0, this is good.
    Reply  Mon Sep 25 17:56:33 2017, johannes, Update, Computer Scripts / Programs, transmitted power during lossmap 
I had to do a reboot + burt restore of c1psl today. It was unresponsive and I couldn't get the PMC to lock. I also had to slightly realign the PMC,
and the IMC was too misaligned for the autolocker to catch lock. Adjusting it manually, it was predominantly MC1 PIT that was off. The YARM locked on a
10 mode and had to be aligned manually as well.
    Reply  Sat Apr 21 21:10:34 2012, Jamie, Update, CDS, trend frame issue partially resolved 


    
        
            Quote:
        
        
            

           Unfortunately it looks like there may be a problem with trend data, though.  If I try to retrieve 1 minute of "full data"
    Reply  Tue Jan 29 15:16:18 2013, Manasa, Frogs, General, trial run ErgoMatesFeatures.jpgbooties.jpg
 
 I would like to suggest a trial run on these....Ergomates and the cleanboot!
    Reply  Wed Jan 30 16:24:25 2013, Manasa, Frogs, General, trial run 


    
        
            Quote:
        
        
            

            
    Reply  Fri Nov 5 14:06:19 2010, yuta, Update, IOO, tried to align MC by A2L measurement A2LmeasurementFigures.png
(Suresh, Kiwamu, Yuta)

Summary:
Entry  Thu Oct 14 01:09:17 2010, yuta, Update, IOO, tried to lock MC but failed 
(Rana, Koji, Kiwamu, Suresh, Yuta)
 We attempted to lock the MC and finally got flashes of the MC,
but no luck. 
Entry  Wed Jun 6 02:28:02 2012, yuta, Update, Green Locking, tried to see Yarm length change with weak beat note beatycoarseringdown20120605.pngbeatysetup20120605.png
[Jenne, Yuta]

Summary:
    Reply  Mon May 9 18:54:29 2011, kiwamu, Update, LSC, triggerd locking logic : screen prepared trigger_medm.png
I made a new medm screen for the triggering logics. Have fun.
I put a button on C1LSC.adl to invoke this screen.
Entry  Tue Jul 31 00:27:52 2012, Den, Update, PEM, trillium 
We have a Trillium for several days from Vladimir. I've put seismometer inside the foam box on linolium. I was not able to level the seismometer on granite
as this Trillium does not have level screws. Does anybody know where they are?  Readout box stands on the foam box as seismometer cable is
short (~2 meters).
Entry  Fri Mar 6 13:48:17 2015, dark kiwamu, Summary, IOO, triple resonance circuit 
I was asked by Koji to point out where a schematic of the triple resonant circuit
is.
It seems that I had posted a schematic of what currently is installed (see elog 4562 from
Entry  Fri Feb 12 13:15:41 2010, kiwamu, Update, Electronics, triple resonant EOM --- liniaryity test linearity_edit.png

I have measured the linearity of our triple resonant EOM (i.e. modulation
depth versus applied voltage)
    Reply  Sat Feb 13 13:21:53 2010, Koji, Update, Electronics, triple resonant EOM --- liniaryity test 
Looks good. I just thought of the idea that we also can use Alberto's PLL setup to sense the modulation with more sensitivity.  ;-)


    
        
            Quote:
        
        
            
Entry  Wed Feb 10 17:28:02 2010, kiwamu, Update, Electronics, triple resonant EOM ---- preliminary result mod_depth.png
I have made a prototype circuit of the triple resonant EOM.
The attached is the measured optical response of the system.
The measured gains at the resonances are 8.6, 0.6 and 7.7 for 11MHz, 29.5MHz and 55MHz respectively.
    Reply  Wed Feb 10 23:15:37 2010, Koji, Update, Electronics, triple resonant EOM ---- preliminary result 
Hey, this looks nice, but can you provide us the comparison of rad/V with the resonant EOM of New Focus?


    
        
            Quote:
        
        
            
    Reply  Thu Feb 11 16:52:53 2010, kiwamu, Update, Electronics, triple resonant EOM ---- preliminary result 
The commercial resonant EOM of New Focus has the modulation efficiency of 50-150mrad/Vrms.
( This number is only true for those EOM made from KTP such as model4063
and model4463
    Reply  Sat Sep 3 14:47:50 2011, kiwamu, Update, IOO, triple resonant box : brief estimations about reflections and mode. depths 
(RF reflections)
The reflected RF power going back to the RF generation box will be :
    Power at 11MHz =  2 dBm
Entry  Fri Sep 2 13:12:08 2011, kiwamu, Update, IOO, triple resonant box : ready to install refl_eom.png
The triple resonant box was checked again. Each resonant frequency was tuned
and the box is ready to go.
Before the actual installation I want to hear opinions about RF reflections
    Reply  Fri Sep 2 15:56:32 2011, Koji, Update, IOO, triple resonant box : ready to install 
What are the reflected RF powers for those frequencies? 
Is the 29.5MHz more problem than the 55MHz, considering the required modulation depth?
 
Entry  Mon Jan 18 23:44:19 2010, kiwamu, Update, Electronics, triple resonant circuit for EOM whole_circuit.pngdesigned_circuit.png
The first design of the triple resonant EOM circuit has been done.
If only EOM has a loss of 4 Ohm, the gain of the circuit is expected
to be 11 at 55MHz 
    Reply  Tue Jan 19 00:10:44 2010, rana, Update, Electronics, triple resonant circuit for EOM 
Very cool.  
      
    Reply  Tue Jan 19 02:40:38 2010, Koji, Update, Electronics, triple resonant circuit for EOM 
The design looks very good. I have some questions.
1. As far as I remember, you've got the gain of slightly worse than 10 for a 55MHz single resonant case. Why your expectation of the gain (G=11)
for the highest resonance better than this?
    Reply  Tue Jan 19 03:04:14 2010, Koji, Update, Electronics, triple resonant circuit for EOM 
Self-follow:
I got the answer of Q3 from the follow-up entry.
For Q4, once you get the impedance of the LC network lower than n^2*50, the EOM gain will be quite low. This means that the resonance is anyway
Entry  Tue Aug 24 11:23:32 2010, steve, Update, PEM, tripod leg installation completed 7x
Bertine Robby, Bertin and Jerry completed the installation by pouring concrete yesterday and cleaning up today.
Atm1-2, steel bars, grouted feet and side forms are ready
Atm3,    bounding agent is applied for better bounding
Entry  Wed Jan 16 14:09:45 2008, rob, Update, LSC, tuesday's locking 

I got a little further with the locking (PRFPMI) last night, after discovering that the cable going from the CM board to the MC board was unplugged at
the MC side.  This explains why we weren't able to engage the AO path last night.  Tonight, I got up to the point where DARM is handed off to OMC transmission,
Entry  Thu Apr 9 12:23:49 2009, pete, Update, Locking, tuning ETM common mode FPMI-DARM-CARM-ETM-fineScan.pdf
Pete, Yoichi
Last night, we put the IFO in FP Michelson configuration.  We took transfer functions of CARM and DARM, first using CM excitations directly
on the ETMs, and then using modulations of the laser frequency via MC excitation.  We found that there was basically no coupling into DARM using the
    Reply  Tue Jul 25 14:04:06 2017, Steve, Update, VAC, turbo controller installed and we are running at vac normal TP2@75Krpm.png
Gautam and Steve,

Spare Varian turbo-V 70 controller, Model 969-9505, sn 21612 was swapped in. It is running the turbo fine @ 50Krpm but it does not allow it's
V4 valve to be opened............
Entry  Wed Mar 30 16:57:13 2011, kiwamu, Update, General, turned off c1aux  
[Steve / Kiwamu]
 As a part of the video cable session, we reconnected some power cords on 1Y1 rack.
During the work we momentarily turned off c1aux, which handles DMF, Illumintators, mechanical shutters and the old video epics.
Entry  Tue Jan 5 13:23:45 2010, Alberto, Omnistructure, Environment, turning page 
In the lab there are lots of old posters with outdated autocad drawings, or printouts with schematics of old electronics hanging on the walls.
Can we get rid of those and start giving the lab a fresh and modern look?
Entry  Mon Jan 28 21:32:38 2013, jamie, Update, Alignment, tweaking of alignment into half PRC 
[Koji, Jamie]
We tweaked up the alignment of the half PRC a bit.  Koji started by looking at the REFL and POP DC powers as a function of TT2 and PRM alignment. 
    Reply  Wed Mar 24 04:22:51 2010, kiwamu, matt, Update, Green Locking, two NPRO PLL  
Now some pedestals, mirrors and lenses are left on the PSL table, since we are on the middle way to construct a PLL setup which employs two NPROs instead
of use of PSL laser.
So Please Don't steal any of them.
ELOG V3.1.3-