  40m Log, Page 333 of 339  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  2925   Wed May 12 23:31:17 2010 AlbertoUpdate40m Upgrading216 MHz resonance in the POY11 PD killedIt turned out that the resonance at 216
MHz in the 11MHz PD that I showed in the
elog entry 2902
 POX11.png2010-05-12_POY11_CalibratedOpticalResponse0-500MHz.png 
  2926   Thu May 13 05:06:43 2010 ranaUpdate40m Upgrading216 MHz resonance in the POY11 PD killed 
 This idea was tried before
by Dale in the ~1998 generation of PDs. Its
  
  13544   Fri Jan 12 20:35:34 2018 Udit KhandelwalSummaryGeneral2018/01/12 Summary
40m Lab CAD


Worked
  
  12055   Wed Mar 30 16:40:24 2016 ericqUpdateLSC2016 vs 2010I haven't found any data files for
the DARM spectrum of the previous generation
of 40m, but with some GIMP-fu, I have plotted
 2016_vs_2010.png 
  9730   Mon Mar 17 10:50:58 2014 steveUpdatesafety2014 annual crane certification

    

       
            
 2014craneCert.jpg 
  4651   Fri May 6 10:20:00 2011 steveSummarySAFETY2011 safety auditThe emphasis of this annual safety audit 
was on  safe  electrical housekeeping
on March 3, 2011
 sa2011done1.pdfP1070448.JPG 
  1620   Fri May 22 01:27:14 2009 peteUpdateSUS200 days of MC3 side Looks like something went nuts in late
April.  We have yet to try a hard reboot.
 mc3_side_200days.png 
  547   Fri Jun 20 01:38:55 2008 ranaUpdatePEM20 day WeatherYoichi showed me that its possible to make
PNG images from PS using GS:
 test.png 
  10899   Wed Jan 14 02:11:07 2015 ranaSummaryTreasure2-loop Algebra LoopologyI show here
the matrix formalism to calculate analytically
the loop TF relationships for the IMC w/
 FSSloop.pdfFSSloop.png 
  16464   Thu Nov 11 00:11:39 2021 KojiSummarySUS2" to 3" sleeve issueYehonathan and Tega found that the new
PR3 and SR3 delivered in 2020 is in fact 3/4"
 6x 
  16296   Wed Aug 25 08:53:33 2021 JordanUpdateSUS2" Adapter Ring for SOS Arrived 8/24/218 of the 2"->3" adapter rings
(D2100377) arrived from RDL yesterday. I
have not tested the threads but dimensional
 20210824_152259.jpg20210824_152259.jpg20210824_152308.jpg 
  16364   Wed Sep 29 09:36:26 2021 JordanUpdateSUS2" Adapter Ring Parts for SOS Arrived 9/28/21The remaining machined parts for the SOS
adapter ring have arrived. I will inspect
these today and get them ready for C&B.
 20210929_092418.jpg 
  820   Mon Aug 11 00:58:31 2008 ranaUpdatePEM2 years of temperature trendThe PSL RMTEMP alarmed again because it says
the room temperature is 19.5 C. Steve said
in
 Untitled.png 
  821   Mon Aug 11 09:39:29 2008 ranaUpdatePEM2 years of temperature trendSteve and I went around and inspected and
then adjusted the thermostats and [FONT=Comic
Sans MS]humidostats[/FONT].
  
  5783   Wed Nov 2 10:41:47 2011 steveUpdateGeneral2 spare heliax at the LSC rackThey were traced and labeled. One goes
to 1X2 and the other to AS-ISCT. They are
Andrew Heliax 1/4" od. made by CommScone, 
  
  16778   Thu Apr 14 10:18:35 2022 PacoSummaryBHD2 in oplev mirrors incompatible with LMR2V[Paco, JC]

We realized the 2 in oplev mirrors
(Thorlabs BB2-E02) for ITMYOL, SRMOL, and
  
  3622   Wed Sep 29 16:56:36 2010 yutaUpdateVAC2 doors opened(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday,
  
  2744   Wed Mar 31 16:55:05 2010 josephbUpdateComputers2 computers from Alex and Rolf brought to 40mI went over to Downs today and was able
to secure two 8 core machines, along with
mounting rails.  These are very thin
  
  9691   Wed Mar 5 11:33:10 2014 KojiSummaryLSC2 arm ALS->LSC transition - road mapStep by step description of transition
from 2arm ALS to Common/Differential LSC
for FPMI
  
  6851   Fri Jun 22 02:21:57 2012 JenneUpdateGreen Locking2 arm ALS - Success!!!![Yuta, Jenne]
We
 P6210140.AVIspeedy_gonzales-5257.jpg 
  6852   Fri Jun 22 03:37:42 2012 KojiUpdateGreen Locking2 arm ALS - Success!!!!Are
these correct?
1. It is a nice work.
  
  6853   Fri Jun 22 10:52:18 2012 yutaUpdateGreen Locking2 arm ALS - Success!!!!Answers to questions from Koji.
  
  3295   Mon Jul 26 20:30:35 2010 JenneUpdateSUS2 Tip Tilts suspended and balanced[Koji, Jenne]
We were on Team Cleanroom, while
Kiwamu and Alberto were on Team Chamber. 
  
  2574   Fri Feb 5 14:31:46 2010 JenneUpdateSUS2 SOS towers assembled[Jenne, Kiwamu]
The 2 SOS towers for the ITMs have
been assembled, and are on the flow bench
 DSC_1156.JPG 
  4830   Fri Jun 17 00:17:26 2011 ranaConfigurationElectronics2 RFPDs sent to LLOKoji and I found 2 RFPD boxes to
send to LLO. We've put them onto Steve's
desk to be overnighted to Valera.
 P1070895.JPG 
  1349   Tue Mar 3 11:39:50 2009 OsamuDAQComputers2 PCs in Martian Kiwamu and I brought 2 SUPER MICRO
PCs from Willson house into 40m.
Both PCs are hooked up into Martian
  
  7385   Fri Sep 14 01:18:51 2012 ranaUpdateCOC2 Layout ChangesAfter looking
at the in-vacuum layout I think we should
  
  7398   Mon Sep 17 18:04:01 2012 SteveUpdateCOC2 Layout Changes

    

       
            
 IMG_1635.JPG 
  3960   Sat Nov 20 02:25:30 2010 yutaUpdateCDS2 LOCKINs for suspension models(Suresh, Koji, Yuta)

Background:
 LockinRoll.png 
  3314   Wed Jul 28 18:24:57 2010 JenneUpdateGreen Locking2 Green Periscopes have mirrors, aligned[Koji, Jenne, Kiwamu]
This is to describe the work that
went on in the Cleanroom today.  Kiwamu's
  
  329   Thu Feb 21 19:55:46 2008 ranaUpdateElectronics2 BNC Cables, 1 TeeI'm not sure where [COLOR=purple]Ward and
Miller went to Analyzer school[/COLOR], but
it was probably uncredited.
  
  7626   Thu Oct 25 21:02:34 2012 DenUpdatePEM1x7 dc power We now stop using bench DC power
supplies for microphone preamp and PEM AA
board. DC power is wired from 1x5 rack suppliers.
 DSC_4779.JPG 
  6076   Tue Dec 6 02:57:44 2011 kiwamuUpdateGreen Locking1st trial of handing offI
succeeded in handing off the servo from that
of the ALS to IR-PDH.
 YarmALS.png 
  8507   Mon Apr 29 18:53:03 2013 JenneUpdateElectronics1pps timing fiber to OMC rack may be bentWhile helping Riju out this afternoon,
I noticed that the timing fiber that goes
to the OMC rack (near the AP table) was bent,
  
  593   Sun Jun 29 18:58:43 2008 ranaSummaryComputers1e20 is too big for AWG and/or IOVMEWhile testing out my matlab/awgstream based
McWFS diagnostic script I accidentally put
a
  
  2173   Tue Nov 3 12:47:01 2009 KojiConfigurationCDS1Y9 Rack configuration updateFor the CDS upgrade preparation I put
and moved those stuff at the rack 1Y9:
Placed 1Y9-12 ADC to DB44/37 Adapter
  
  948   Mon Sep 15 14:00:52 2008 josephbConfigurationComputers1Y9 Hub and C1ascThe 1Y9 switch is now using a labeled Cat6
cable in cable trays to connect to the main
switch in the offices.  In addition, the
  
  14848   Fri Aug 16 16:40:04 2019 gautamUpdateCDS1Y3 work[chub,
gautam]
 newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png 
  4609   Tue May 3 10:59:31 2011 josephbUpdateCDS1Y2 binary output adapter board now poweredI temporarily turned off the power to the
1Y2 rack this morning while wiring in the
binary output adapter board power (+/- 15V)
  
  4717   Sat May 14 14:50:21 2011 KojiUpdateLSC1Y2 5V Blown Fuse found -> FixedIncidentally,
a blown fuse on 5V line at 1Y2 rack was found
during the intallation of Sorensens.
 1Y2_5V_Fuse.JPG 
  16453   Mon Nov 8 10:13:52 2021 PacoSummaryBHD1Y1 rack work; Sorensens removed[Paco, Chub]

Removed all sorensen power supplies
from this rack except for 12 VDC one; that
  
  16454   Mon Nov 8 13:13:00 2021 KojiSummaryBHD1Y1 rack work; Sorensens removedUpdated the rack layout. Now there is an
issue.
We were supposed to have 1U space
 40m_BHD.png 
  16455   Mon Nov 8 15:29:05 2021 PacoSummaryBHD1Y1 rack work; New power for cameras[Paco, Anchal]

In reference to Koji's concern
(see previous elog), we have completely removed
  
  16540   Mon Jan 3 16:46:41 2022 PacoUpdateBHD1Y1 rack work for SR2, PR2, PR3[Paco, Anchal]

Continued working on 1Y1 rack.
Populated the 6 coil drivers, made all connections
  
  16444   Tue Nov 2 16:42:00 2021 PacoSummaryBHD1Y1 rack work[paco, ian]

After the new 1Y0 rack was placed
near the 1Y1 rack by Chub and Anchal, today
  
  16448   Thu Nov 4 15:03:43 2021 KojiSummaryBHD1Y1 rack workI have visited the binder file for the
40m wiring file in the control room.
The 12V power supply on 1Y1 is for
  
  16440   Fri Oct 29 14:39:37 2021 AnchalSummaryBHD1Y1 cleared. IY3 ready for C1SUS2 I/O and FE.[Anchal, Paco]

We cleared 1Y1 rack today removing
the following items. This stuff is sitting
 RemovedStuff.jpeg1Y1.jpeg1Y3.jpeg 
  16539   Mon Jan 3 12:05:08 2022 PacoUpdateBHD1Y0 rack work for LO2 AS1 AS4[Paco, Anchal]

Continue working on 1Y0. Added
coil drivers for LO2, AS1, AS4. Anchal made
  
  16506   Tue Dec 14 19:29:42 2021 PacoUpdateBHD1Y0 rack work for LO1[Paco]

Two coil drivers have been installed
on 1Y0 (slots 6, 7, for LO1 SOS). All connections
  
  16463   Tue Nov 9 19:02:47 2021 AnchalSummaryBHD1Y0 Populated and 1Y1,1Y0 powered[Anchal, Paco]

Today we populated 4 Sat Amp boxes
for LO1, Lo2, AS1, and AS4, 2 BO boxes for
  
ELOG V3.1.3-