1795
|
Mon Jul 27 09:34:07 2009 |
steve | Summary | IOO | Aligning the mode cleaner |
|
|
1802
|
Wed Jul 29 11:15:06 2009 |
steve | Bureaucracy | SAFETY | Kevin receives safety training | Kevin Vigue, our high school summer student
went through the 40m specific safety traning
yesterday. |
|
1831
|
Wed Aug 5 07:33:04 2009 |
steve | DAQ | Computers | fb40m is down | |
|
1838
|
Wed Aug 5 16:33:50 2009 |
steve | Configuration | PSL | new PSL output iris | I installed an improvised version of PSL
output beam iris at the output periscope
last week. |
|
1840
|
Thu Aug 6 09:05:29 2009 |
steve | Update | VAC | large O-rings of vacuum envelope | The 40m-IFO vacuum envelope doors are sealed
with dual viton O-rings and they are pumped
through the annulos lines. |
 |
1852
|
Fri Aug 7 09:50:57 2009 |
steve | Configuration | VAC | IFO pressure rose to 2.3 mTorr | IFO pressure was 2.3 mTorr this morning,
The Maglev's foreline valve
V4 was closed so P2 rose to 4 Torr. The Maglev |
|
1864
|
Fri Aug 7 19:34:40 2009 |
steve | Summary | VAC | UPS failed | The Maglev is running on single phase 220V
and that voltage was not interrupted.
TP1 was running undisturbed with V1 and V4 |
|
1865
|
Fri Aug 7 19:55:08 2009 |
steve | Summary | VAC | opening V1 when PTP1 is broken | The swapped in 307 convectron gauge controller
is very likely to have the RS232 connection
wired differently from the old one. |
|
1931
|
Thu Aug 20 09:16:32 2009 |
steve | HowTo | Photos | Control Room Workstation desks lowered to human height |
|
    |
1937
|
Mon Aug 24 16:48:57 2009 |
steve | HowTo | VAC | new UPS installed |
|
|
1943
|
Tue Aug 25 18:42:42 2009 |
steve | Update | PSL | reference cavity temp box temporarly out of order |
|
|
1948
|
Wed Aug 26 14:45:14 2009 |
steve | Update | PSL | PSL-FSS_RCTEMP of 4 years | The reference cavity vacuum chamber temp
is plotted starting Feb 22 of 2005
This plot suggest that the MINCO |
|
1952
|
Wed Aug 26 16:31:34 2009 |
steve | Update | PSL | reference cavity temp box temporarly out of order |
|
|
1958
|
Thu Aug 27 16:14:28 2009 |
steve | Summary | OMC | burned photodiode | Old -pre 6/2009 LLO DCPD 3 mm od
GTRAN photodiode |
 |
1961
|
Fri Aug 28 15:30:15 2009 |
steve | Configuration | General | POX rfpd removed | I removed POX rfpd to see how it is mounted
on its base. It is here on the work bench
just in case someone wants to use it the |
|
1962
|
Tue Sep 1 11:23:36 2009 |
steve | Update | General | electrical ground | I was told yesterday, that on Friday the
construction people accidentally ripped out
one of the 40m soil ground.....AND HOW MANY |
|
1963
|
Tue Sep 1 13:52:06 2009 |
steve | Configuration | General | POX rfpd is back & needs alignment |
|
|
1965
|
Thu Sep 3 11:20:26 2009 |
steve | Update | General | electrical ground in place |
|
 |
1974
|
Tue Sep 8 16:01:52 2009 |
steve | Configuration | VAC | RGA was separeted from IFO | The RGA isolation valve VM1 was closed
since Aug 24, 2009 I installed the
new UPS that time. |
|
1980
|
Wed Sep 9 10:13:31 2009 |
steve | Bureaucracy | General | the use of FAX machine, scanner & toaster |
You said that the use of FAXST
was forbidden for phds and graduate students. |
|
1987
|
Tue Sep 15 15:46:05 2009 |
steve | Update | PEM | PEM and VAC | FSS_RMTEMP is moving up and daily
fluctuations are less . 120 and
16 days plots are below. |
 |
1993
|
Fri Sep 18 16:26:02 2009 |
steve | Summary | PSL | Neslab chiller is OK | Rob found puddles of water very close to
the chiller during lunch time. We raised
the unit and took the side cover off. All |
|
2031
|
Thu Oct 1 08:37:43 2009 |
steve | Update | SUS | suspention damping restored and MZ HV stuck | Earthquake
of magnitude 5.0 shakes ETMY loose.
MC2 lost it's damping later. |
|
2033
|
Thu Oct 1 10:23:00 2009 |
steve | Update | PSL | MC2 damping restored again | The EQ did not change the input beam
pointing. All back to normal, except MC2
wachdogs tripped again. |
|
2097
|
Thu Oct 15 09:23:07 2009 |
steve | Summary | Locking | never had it so good | Awesome 5 hrs of locking Rob! |
|
2102
|
Fri Oct 16 10:15:02 2009 |
steve | Update | IOO | IP ang & pos recentered | Pointing stability of 4 days. Initial pointing
does not go through suspended optics. It
is launched right after the Piezo Jena |
|
2115
|
Mon Oct 19 11:00:52 2009 |
steve | HowTo | SAFETY | 40m safety training | Kiwamu, Alex and Zach are practicing mandatory
IR-safety scan at the 40m-PSL
40m specific safety indoctrination |
|
2124
|
Tue Oct 20 10:46:18 2009 |
steve | Update | IOO | clipping IP-ANG beam at ETMX chamber | Initial pointing beam is clearly clipping
on 2" pick off mirror in ETMX
vacuum chamber. |
 |
2132
|
Thu Oct 22 08:45:58 2009 |
steve | Update | IOO | IP ang & pos recentered |
|
|
2137
|
Fri Oct 23 09:13:45 2009 |
steve | Summary | VAC | RGA scan | Pump down #66 is 435 days old. RGA scan
is normal. New maglev is fine. New UPS is
in place but not hooked up to communicate. |
 |
2142
|
Mon Oct 26 15:40:01 2009 |
steve | Update | PSL | laser power is down | The laser power is down 5-6% |
|
2155
|
Wed Oct 28 09:12:18 2009 |
steve | Update | PSL | PMC power on the rise? | The PMC power is seems to be on the rise,
( MOPA_AMPMON is dropping ?) but I do not
think it is real. We have Santa Anna wind |
|
2156
|
Wed Oct 28 14:39:10 2009 |
steve | Update | PEM | after the tour of the 40m | Illuminators and PSL lights turned off.
HEPA filter speed increased from 20 to 100% |
|
2164
|
Fri Oct 30 09:24:45 2009 |
steve | HowTo | MOPA | how to squeeze more out of little |
|
|
2190
|
Fri Nov 6 07:55:59 2009 |
steve | Update | Computers | RFMnetwork is down | The RFMnetwork is down. MC2 sus damping
restored. |
|
2191
|
Fri Nov 6 09:17:53 2009 |
steve | Omnistructure | PEM | PSL HEPAs turned on | The PSL enclosure HEPAs turned on at 30% |
|
2207
|
Mon Nov 9 08:43:16 2009 |
steve | Update | SUS | MC2 damping restored | MC2 damping restored, MZ locked and
the arms are flashing now. |
|
2234
|
Wed Nov 11 09:48:04 2009 |
steve | Update | IOO | where is IOO-RFAMPD_DCMON ? | RFAMPD_DCMON disappered on Nov 5, 2009 |
|
2248
|
Thu Nov 12 09:43:29 2009 |
steve | Update | PEM | construction has started at CES | The concrete floor cutting has begun
next door at CES |
  |
2272
|
Mon Nov 16 09:37:41 2009 |
steve | Update | PEM | construction is getting noisier |
ATM1: Seismometers are saturating,
suspensions are OK |
  |
2297
|
Thu Nov 19 09:25:19 2009 |
steve | Update | MOPA | water was added to the laser chiller | I added ~500 cc of distilled water to the
laser chiller yesterday. |
|
2298
|
Thu Nov 19 09:48:54 2009 |
steve | Update | PEM | construction effect | 8 days plot: Thurdsay, Friday, Sat and
Sun without construction |
|
2312
|
Mon Nov 23 10:11:03 2009 |
steve | Update | PEM | long term temp fluctuation of the 40m lab |
|
|
2313
|
Mon Nov 23 11:03:00 2009 |
steve | Update | SUS | jackhammer special well under control |
|
 |
2314
|
Mon Nov 23 16:28:12 2009 |
steve | Summary | Cameras | Video swicher options |
|
|
2370
|
Wed Dec 9 09:07:32 2009 |
steve | Update | PEM | high seismic activity | The construction activity is shaking the
tables in the control room. The compactor-
large remote controlled jackhammer is in |
   |
2377
|
Thu Dec 10 08:43:25 2009 |
steve | Frogs | Environment | diesel fumes are less |
|
|
2388
|
Thu Dec 10 16:51:35 2009 |
steve | Update | VAC | pumpdown will start tomorrow morning | The vacuum system is at 760 torr
All chambers with doors on and their annuloses
are pumped down. |
|
2394
|
Fri Dec 11 08:35:04 2009 |
steve | Configuration | VAC | pumpdown has started | Oplev positions before and after drag wiped
arm TMs as of yesterday. Slow-mode pumpdown
has started with 3/4 turn opened RV1 |
|
2400
|
Fri Dec 11 15:21:40 2009 |
steve | Configuration | VAC | pumpdown#67 is completed |
|
 |