  6359   Mon Mar 5 20:31:33 2012 KojiUpdateLSC22/110MHz path for POPThis a kind of self record...
We need an RF setup at POP to extract
22 and 110 MHz components separately.
  
  6366   Tue Mar 6 22:23:04 2012 KojiUpdateLSC22/110MHz path for POP 
 As par Kiwamu's request, RF
filters for POP22 and POP110 were installed.
  
  6374   Wed Mar 7 15:56:36 2012 KojiUpdateLSC22/110MHz path for POPThe RF separator installed comprises of
the Minicircuits filters cascaded as in the
figure below. 
 RFseparator.pngimpedance.pdftransmission.pdf 
  8192   Wed Feb 27 20:50:41 2013 ManasaUpdateLSC22/110MHz path for POP[Yuta, Manasa]

Modified POP path.
 POP.png 
  8397   Tue Apr 2 23:14:02 2013 ranaUpdateLSC22/110MHz path for POP

    

       
            
  
  2925   Wed May 12 23:31:17 2010 AlbertoUpdate40m Upgrading216 MHz resonance in the POY11 PD killedIt turned out that the resonance at 216
MHz in the 11MHz PD that I showed in the
elog entry 2902
 POX11.png2010-05-12_POY11_CalibratedOpticalResponse0-500MHz.png 
  2926   Thu May 13 05:06:43 2010 ranaUpdate40m Upgrading216 MHz resonance in the POY11 PD killed 
 This idea was tried before
by Dale in the ~1998 generation of PDs. Its
  
  13544   Fri Jan 12 20:35:34 2018 Udit KhandelwalSummaryGeneral2018/01/12 Summary
40m Lab CAD


Worked
  
  12055   Wed Mar 30 16:40:24 2016 ericqUpdateLSC2016 vs 2010I haven't found any data files for
the DARM spectrum of the previous generation
of 40m, but with some GIMP-fu, I have plotted
 2016_vs_2010.png 
  9730   Mon Mar 17 10:50:58 2014 steveUpdatesafety2014 annual crane certification

    

       
            
 2014craneCert.jpg 
  4651   Fri May 6 10:20:00 2011 steveSummarySAFETY2011 safety auditThe emphasis of this annual safety audit 
was on  safe  electrical housekeeping
on March 3, 2011
 sa2011done1.pdfP1070448.JPG 
  1620   Fri May 22 01:27:14 2009 peteUpdateSUS200 days of MC3 side Looks like something went nuts in late
April.  We have yet to try a hard reboot.
 mc3_side_200days.png 
  547   Fri Jun 20 01:38:55 2008 ranaUpdatePEM20 day WeatherYoichi showed me that its possible to make
PNG images from PS using GS:
 test.png 
  10899   Wed Jan 14 02:11:07 2015 ranaSummaryTreasure2-loop Algebra LoopologyI show here
the matrix formalism to calculate analytically
the loop TF relationships for the IMC w/
 FSSloop.pdfFSSloop.png 
  16464   Thu Nov 11 00:11:39 2021 KojiSummarySUS2" to 3" sleeve issueYehonathan and Tega found that the new
PR3 and SR3 delivered in 2020 is in fact 3/4"
 6x 
  16296   Wed Aug 25 08:53:33 2021 JordanUpdateSUS2" Adapter Ring for SOS Arrived 8/24/218 of the 2"->3" adapter rings
(D2100377) arrived from RDL yesterday. I
have not tested the threads but dimensional
 20210824_152259.jpg20210824_152259.jpg20210824_152308.jpg 
  16364   Wed Sep 29 09:36:26 2021 JordanUpdateSUS2" Adapter Ring Parts for SOS Arrived 9/28/21The remaining machined parts for the SOS
adapter ring have arrived. I will inspect
these today and get them ready for C&B.
 20210929_092418.jpg 
  820   Mon Aug 11 00:58:31 2008 ranaUpdatePEM2 years of temperature trendThe PSL RMTEMP alarmed again because it says
the room temperature is 19.5 C. Steve said
in
 Untitled.png 
  821   Mon Aug 11 09:39:29 2008 ranaUpdatePEM2 years of temperature trendSteve and I went around and inspected and
then adjusted the thermostats and [FONT=Comic
Sans MS]humidostats[/FONT].
  
  5783   Wed Nov 2 10:41:47 2011 steveUpdateGeneral2 spare heliax at the LSC rackThey were traced and labeled. One goes
to 1X2 and the other to AS-ISCT. They are
Andrew Heliax 1/4" od. made by CommScone, 
  
  16778   Thu Apr 14 10:18:35 2022 PacoSummaryBHD2 in oplev mirrors incompatible with LMR2V[Paco, JC]

We realized the 2 in oplev mirrors
(Thorlabs BB2-E02) for ITMYOL, SRMOL, and
  
  3622   Wed Sep 29 16:56:36 2010 yutaUpdateVAC2 doors opened(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday,
  
  2744   Wed Mar 31 16:55:05 2010 josephbUpdateComputers2 computers from Alex and Rolf brought to 40mI went over to Downs today and was able
to secure two 8 core machines, along with
mounting rails.  These are very thin
  
  9691   Wed Mar 5 11:33:10 2014 KojiSummaryLSC2 arm ALS->LSC transition - road mapStep by step description of transition
from 2arm ALS to Common/Differential LSC
for FPMI
  
  6851   Fri Jun 22 02:21:57 2012 JenneUpdateGreen Locking2 arm ALS - Success!!!![Yuta, Jenne]
We
 P6210140.AVIspeedy_gonzales-5257.jpg 
  6852   Fri Jun 22 03:37:42 2012 KojiUpdateGreen Locking2 arm ALS - Success!!!!Are
these correct?
1. It is a nice work.
  
  6853   Fri Jun 22 10:52:18 2012 yutaUpdateGreen Locking2 arm ALS - Success!!!!Answers to questions from Koji.
  
  3295   Mon Jul 26 20:30:35 2010 JenneUpdateSUS2 Tip Tilts suspended and balanced[Koji, Jenne]
We were on Team Cleanroom, while
Kiwamu and Alberto were on Team Chamber. 
  
  2574   Fri Feb 5 14:31:46 2010 JenneUpdateSUS2 SOS towers assembled[Jenne, Kiwamu]
The 2 SOS towers for the ITMs have
been assembled, and are on the flow bench
 DSC_1156.JPG 
  4830   Fri Jun 17 00:17:26 2011 ranaConfigurationElectronics2 RFPDs sent to LLOKoji and I found 2 RFPD boxes to
send to LLO. We've put them onto Steve's
desk to be overnighted to Valera.
 P1070895.JPG 
  1349   Tue Mar 3 11:39:50 2009 OsamuDAQComputers2 PCs in Martian Kiwamu and I brought 2 SUPER MICRO
PCs from Willson house into 40m.
Both PCs are hooked up into Martian
  
  7385   Fri Sep 14 01:18:51 2012 ranaUpdateCOC2 Layout ChangesAfter looking
at the in-vacuum layout I think we should
  
  7398   Mon Sep 17 18:04:01 2012 SteveUpdateCOC2 Layout Changes

    

       
            
 IMG_1635.JPG 
  3960   Sat Nov 20 02:25:30 2010 yutaUpdateCDS2 LOCKINs for suspension models(Suresh, Koji, Yuta)

Background:
 LockinRoll.png 
  3314   Wed Jul 28 18:24:57 2010 JenneUpdateGreen Locking2 Green Periscopes have mirrors, aligned[Koji, Jenne, Kiwamu]
This is to describe the work that
went on in the Cleanroom today.  Kiwamu's
  
  329   Thu Feb 21 19:55:46 2008 ranaUpdateElectronics2 BNC Cables, 1 TeeI'm not sure where [COLOR=purple]Ward and
Miller went to Analyzer school[/COLOR], but
it was probably uncredited.
  
  7626   Thu Oct 25 21:02:34 2012 DenUpdatePEM1x7 dc power We now stop using bench DC power
supplies for microphone preamp and PEM AA
board. DC power is wired from 1x5 rack suppliers.
 DSC_4779.JPG 
  6076   Tue Dec 6 02:57:44 2011 kiwamuUpdateGreen Locking1st trial of handing offI
succeeded in handing off the servo from that
of the ALS to IR-PDH.
 YarmALS.png 
  8507   Mon Apr 29 18:53:03 2013 JenneUpdateElectronics1pps timing fiber to OMC rack may be bentWhile helping Riju out this afternoon,
I noticed that the timing fiber that goes
to the OMC rack (near the AP table) was bent,
  
  593   Sun Jun 29 18:58:43 2008 ranaSummaryComputers1e20 is too big for AWG and/or IOVMEWhile testing out my matlab/awgstream based
McWFS diagnostic script I accidentally put
a
  
  2173   Tue Nov 3 12:47:01 2009 KojiConfigurationCDS1Y9 Rack configuration updateFor the CDS upgrade preparation I put
and moved those stuff at the rack 1Y9:
Placed 1Y9-12 ADC to DB44/37 Adapter
  
  948   Mon Sep 15 14:00:52 2008 josephbConfigurationComputers1Y9 Hub and C1ascThe 1Y9 switch is now using a labeled Cat6
cable in cable trays to connect to the main
switch in the offices.  In addition, the
  
  14848   Fri Aug 16 16:40:04 2019 gautamUpdateCDS1Y3 work[chub,
gautam]
 newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png 
  4609   Tue May 3 10:59:31 2011 josephbUpdateCDS1Y2 binary output adapter board now poweredI temporarily turned off the power to the
1Y2 rack this morning while wiring in the
binary output adapter board power (+/- 15V)
  
  4717   Sat May 14 14:50:21 2011 KojiUpdateLSC1Y2 5V Blown Fuse found -> FixedIncidentally,
a blown fuse on 5V line at 1Y2 rack was found
during the intallation of Sorensens.
 1Y2_5V_Fuse.JPG 
  16453   Mon Nov 8 10:13:52 2021 PacoSummaryBHD1Y1 rack work; Sorensens removed[Paco, Chub]

Removed all sorensen power supplies
from this rack except for 12 VDC one; that
  
  16454   Mon Nov 8 13:13:00 2021 KojiSummaryBHD1Y1 rack work; Sorensens removedUpdated the rack layout. Now there is an
issue.
We were supposed to have 1U space
 40m_BHD.png 
  16455   Mon Nov 8 15:29:05 2021 PacoSummaryBHD1Y1 rack work; New power for cameras[Paco, Anchal]

In reference to Koji's concern
(see previous elog), we have completely removed
  
  16540   Mon Jan 3 16:46:41 2022 PacoUpdateBHD1Y1 rack work for SR2, PR2, PR3[Paco, Anchal]

Continued working on 1Y1 rack.
Populated the 6 coil drivers, made all connections
  
  16444   Tue Nov 2 16:42:00 2021 PacoSummaryBHD1Y1 rack work[paco, ian]

After the new 1Y0 rack was placed
near the 1Y1 rack by Chub and Anchal, today
  