40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 333 of 354  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  2970   Fri May 21 16:37:35 2010 steveConfigurationVACtp3's drypump replacedBob replaced the tipseal in an other drypump
and I swapped it in. TP3 turbo is running
again, it's foreline pressure is 40 mTorr.
  
  2972   Mon May 24 07:53:57 2010 steveConfigurationPEMair cond. just turned ONIFO room temp 27.5C , Please remember to
turn AC back on !
 acoff.jpg 
  3024   Tue Jun 1 11:47:14 2010 steveUpdatePEMlead balls on concrete


   
        
            
 P1060269.JPG 
  3025   Tue Jun 1 15:51:42 2010 steveUpdatePEMfoam box for good thermal stabilityThis box was made  to provide good
thermal stability for seismometer calibration.
There is an inner solid shell of 0.064"
 albx2.PDF 
  3033   Wed Jun 2 07:54:55 2010 steveUpdateMOPAlaser headtemp is upIs the cooling line clogged? The chiller
temp is 21C See 1 and 20 days plots
 htemp.jpghtemp20d.jpg 
  3037   Wed Jun 2 18:09:32 2010 steveUpdatePEMseismometers off of linoleum floorSteve for Nancy,
Seismometer interface box ac power
was turned off, Guralps disconnected and
  
  3039   Wed Jun 2 21:21:43 2010 steveUpdatePEMseismometers off of linoleum floor
  
  3058   Wed Jun 9 10:31:13 2010 steveUpdateSAFETYsafety trainingNancy and Sharmila received introductory
early bird surf safety training for the 40m
lab.
  
  3108   Wed Jun 23 17:48:16 2010 steveUpdateMOPAlaser head tempThe laser chiller temp is fluctuating and
the power output is decreasing. See 120 days
plot.
 htemp120d.jpg 
  3130   Tue Jun 29 08:41:06 2010 steveUpdateMOPAMOPA is deadI found the laser dead this morning.
The crane people are here to unjam
it.
 laserisdead.jpg 
  3150   Wed Jun 30 18:16:55 2010 steveUpdateSAFETYSURF safety training 201040m SURFs Razib Obaid, Nancy Aggarwal,
Unknown Bearded SMURF, Megan
 DSC_1902.JPG 
  3152   Thu Jul 1 10:26:34 2010 steveConfigurationVACpd68 at vacuum normal stateSlow pump down _pd68 has reached the vacuum
normal state.  CC4_Rga region is pumped
now. The RGA is still off.
 pd68slow2d.jpgpem134d.jpg 
  3192   Mon Jul 12 10:23:51 2010 steveUpdatePEMair condition maintenance is todayThe AC filters will be checked and/or replaced
today. This means the AC will be off for
sort periods of time. Temperature and particle
 pem2y.jpg 
  3202   Tue Jul 13 10:02:30 2010 steveUpdateMOPAlaser power is dropping slowlyI have just removed an other 400 cc of
water from the chiller.  I have been
doing this since the HTEMP started fluctuating.
 power100d.jpg 
  3248   Tue Jul 20 08:04:31 2010 steveConfigurationVACslow vent has startedThe PSL shutter was closed. The beam path 
blocked two places. High voltage power supplies
to IOO and OMC PZT were checked to be off.
  
  3266   Thu Jul 22 08:07:27 2010 steveUpdateVACvent finished

    
        
 30hvent.jpg 
  3272   Fri Jul 23 08:15:59 2010 steveUpdatePSLref cavity ion pumpThe ref cavity ion pump was running at
7.7kV instead of 5kV
This Digitel SPC-1 20 l/s ion pump
  
  3277   Fri Jul 23 15:32:02 2010 steveUpdatePEMcontrol room AC set point changedThe control room temp is warmer than usual.
The heat exchanger Office Pro 18 set point
was lowered from 70 to 68F yesterday.
  
  3279   Fri Jul 23 16:00:35 2010 steveUpdateSAFETYcrane load test tomorrowAll 3 cranes will be load tested at 1 ton
tomorrow morning between 9am and 2pm
Do not come to the 40m lab during
  
  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

    
        
 htempRTemp.jpg 
  3297   Tue Jul 27 11:43:24 2010 steveUpdatePEMair quality is bad todayThe lab is at 30,000 and Pasadena air is
at 1.1 e+6 particles /cf min of 0.5 micron.
 pemtoday.jpg 
  3311   Wed Jul 28 14:54:56 2010 steveUpdateSAFETYevacuation drill at the 40mHead count at the evacuation drill today.
I checked  alarms and flashers 
at room 104,102,101, 103, 105 and 107. They
 P1060520.JPG 
  3331   Fri Jul 30 09:55:34 2010 steveConfigurationVACslow pumpdown has startedBob and Steve closed BS chamber with the
help of the manual Genie lift and the pump
down started. The PSL shutter was closed
 slowpd5hr.jpg 
  3333   Fri Jul 30 14:53:09 2010 steveUpdateGeneralPSL table leg upgrade


   
        
            
 psllegs.PDF 
  3336   Fri Jul 30 17:54:55 2010 steveHowToVACHow to stop and start slow pumpdown


   
        
            
  
  3347   Mon Aug 2 10:26:15 2010 steveConfigurationVACvery slow pumpdown completed


   
        
            
 veryslowpd.jpg 
  3371   Fri Aug 6 08:09:15 2010 steveUpdatePSLPSL preparation work


   
        
            
  
  3394   Tue Aug 10 17:21:48 2010 steveUpdateGeneralPSL optical table is at 30" heightMike Gerfen, Koji and Steve,
 
Our old ( 6 x 10 x 1 ) ft Newport
 P1060586.JPGP1060583.JPGP1060591.JPGP1060593.JPGP1060597.JPG 
  3404   Thu Aug 12 10:56:31 2010 steveUpdateEnvironment dusty floor work in progresI powered down 1Y1 and 1Y2 instrument racks
of MC and RF-systems this morning.
Both racks, SP table, clean tools-parts
  
  3410   Thu Aug 12 16:18:46 2010 steveUpdateEnvironmenttiles and adhesive removed


   
        
            
 P1060604.JPGP1060606.JPGP1060603.JPGP1060610.JPGDSC_2388.JPG 
  3422   Fri Aug 13 18:32:48 2010 steveUpdatePEM new legs attached to optical tableKoji, Rana and Steve
 
The floor preparation continued today.
 P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG 
  3430   Tue Aug 17 14:09:15 2010 steveUpdatePEMPSL optical table schedule Tuesday, 17 August : fill tunnel, set table
height, level table and balance load
Wednesday : grout tripod legs and
  
  3435   Wed Aug 18 16:42:14 2010 steveUpdatePEMPSL optical table legs load balanced 
 Rana, Koji, Alberto and Steve,
Tuesday afternoon
 P1060671.JPGP1060674.JPGP1060670.JPGP1060676.JPG 
  3444   Thu Aug 19 16:03:59 2010 steveUpdatePEMgrouting of PSL tripod legsThe 10' x 6' optical table is seating on
6 tripods. Each tripod leg has 3 feet. They
are supported by jack screws against copper
 P1060687.JPGP1060681.JPGP1060686.JPGP1060696.JPG 
  3448   Fri Aug 20 15:49:14 2010 steveUpdatePEMgrouting is doneThe preparation for pouring concrete is
continuing. The grout forms were removed.
Half inch ribbed steel bars were epoxied
 P1060699.JPGP1060700.JPGP1060704.JPG 
  3449   Fri Aug 20 16:17:35 2010 steveUpdatePEMPEM-count channels are not workingC1: PEM-count channels are dead since August
12, 2010
  
  3455   Mon Aug 23 08:28:27 2010 steveUpdateSUSETMY sus damping restored    
  3462   Tue Aug 24 11:23:32 2010 steveUpdatePEMtripod leg installation completedBertine Robby, Bertin and Jerry completed
the installation by pouring concrete yesterday
and cleaning up today.
 7x 
  3472   Wed Aug 25 16:13:32 2010 steveSummaryPEMPSL optical table is back into operation at 32.75" levelThe tile work was done yesterday after
noon.
This morning Mike Gerfen and me lowered
 P1060764.JPGP1060768.JPGP1060777.JPGP1060776.JPGP1060780.JPG 
  3477   Fri Aug 27 11:27:33 2010 steveUpdatePEMcrane safety documentI posted the crane safety document on the
40m wiki, vacuum page as 26 August 2010
Please add your comments and corrections.
  
  3493   Tue Aug 31 10:44:17 2010 steveUpdatePEMconcrete sealedThe PSL -leg concrete was sealed with a
single coat of SCOFIELD Cureseal-S to minimize
shedding of particles.
 P1060787.JPG 
  3495   Tue Aug 31 13:31:00 2010 steveUpdatePEMroom temp loweredI lowered room 101 thermostat setting from
74F to 72F
  
  3496   Tue Aug 31 14:47:53 2010 steveConfigurationPEMtoilet upgradeOur toilets were replaced by a green Gerber
1.6 gpf ( 6 lpf ) last week.
 toil-n.JPG 
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing Crane balancing at the south end is continuing
today.
  
  3513   Thu Sep 2 14:11:17 2010 steveSummaryPEMsouth end crane balancing is completedThe crane I -beam now leveled at all degrees
of rotation.  The lower hinge was moved
southward  about 1/4 of an inch. 
 P1060798.JPGP1060800.JPGP1060804.JPG 
  3514   Thu Sep 2 16:41:32 2010 steveConfigurationSAFETYlaser is ON: safety glasses required!I hooked up interlock to the Innolight
2W 1064 nm in the enclosure. The manual shutter 
is closed on this unit.
  
  3547   Wed Sep 8 16:17:58 2010 steveUpdatePEMparticle counter problemI played with the particle counter this
morning. Now it's running and reading the
correct numbers on the old COCHECKLIST.adl
  
  3549   Thu Sep 9 08:23:45 2010 steveUpdateSAFETYmain laser turned offInnolight 2W 1064nm main laser was turned
off for more enclosure related work.
The electrician re rooting the power-
  
  3550   Thu Sep 9 11:17:15 2010 steveUpdateSAFETYmain laser is back ON


   
        
            
 P1060813.JPGP1060814.JPGP1060816.JPG 
  3551   Thu Sep 9 11:31:54 2010 steveUpdatePEMaccelerometer cable connectionI turned off/on the power to the accelerometers
in order to re rout their connections. I
found cable connector body-nut  #3 loose
  
ELOG V3.1.3-