ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
12807
|
Tue Feb 7 12:01:10 2017 |
Lydia | Update | IMC | 29.5 MHz stabilizer box replacement | I tested the amplifier with the Agilent
network analyzer and measured 19.5 dB
of gain between 29 and 30 mHz. The phase |
|
12809
|
Tue Feb 7 17:00:55 2017 |
Lydia | Update | IMC | 29.5 MHz stabilizer box replacement | I set everything up and connected it as
shown on the block diagram attached to the
previous entry, with the exception |
|
12816
|
Fri Feb 10 02:14:10 2017 |
gautam | Update | IMC | 29.5 MHz stabilizer box replacement | Lydia finished up installing the new RF
amplifier, and will elog the details of the
installation. |
|
12817
|
Fri Feb 10 11:41:43 2017 |
Lydia | Update | IMC | 29.5 MHz stabilizer box replacement | To install the replacement amplifier, I
did the following:
Mounted the amplifier in |
|
12819
|
Fri Feb 10 13:24:28 2017 |
rana | Update | IMC | 29.5 MHz stabilizer box replacement | To remind myself about how to put filter
caps on the mini-circuits RF Amps, I looked
at Koji's recent |
|
12755
|
Wed Jan 25 15:41:29 2017 |
Lydia | Update | IMC | 29.5 MHz modulation depth measurement plan | [Lydia, gautam]
To measure the modulation depth
of the 29.5 MHz sideband, we plan to connect |
|
12756
|
Wed Jan 25 17:30:03 2017 |
Koji | Update | IMC | 29.5 MHz modulation depth measurement plan | I'm afraid that the bidirectional coupler,
designed to be 50ohm in/out, disturbs the
resonant circuit designed for the EOM which |
|
12758
|
Wed Jan 25 19:39:07 2017 |
gautam | Update | IMC | 29.5 MHz modulation depth measurement plan | Just collecting some links from my elog
searching today here for easy reference later.
EOM datasheet: Newfocus |
|
12767
|
Fri Jan 27 21:25:11 2017 |
Lydia | Update | IMC | 29.5 MHz modulation depth | [gautam, Lydia]
We set out to measure the 29.5
MHz power going to the EOM today but decided |
|
12768
|
Sat Jan 28 01:25:51 2017 |
gautam | Update | IMC | 29.5 MHz modulation depth | Some more details of our investigation:
Here is a spectrum of the
signal to the power combiner on the PSL table, |
 |
2801
|
Thu Apr 15 14:47:28 2010 |
steve | Update | Electronics | 25MHZ oscillation of HP4195A | The 1979 vintage RF spectrum analyzer HP4195A
sn2904J01587 shipped out for repair
today to http://www.avalontest.com |
 |
16211
|
Thu Jun 17 22:19:12 2021 |
Koji | Update | Electronics | 25 HAM-A coil driver units delivered | 25 HAM-A coil driver units
were fabricated by Todd and I've transported
them to the 40m. |
|
12660
|
Fri Dec 2 16:40:29 2016 |
gautam | Update | IMC | 24V fuse pulled out | I've pulled out the 24V fuse block
which supplies power to the AOM RF driver.
The way things are set up on the PSL table, |
|
623
|
Wed Jul 2 13:56:10 2008 |
Rob, Yoichi, John | Update | Locking | 24.5 Hz resonance | Work continues on trying to reduce the CARM
offset using dc signals from PO_DC. Got up
to arm powers of
|
|
6359
|
Mon Mar 5 20:31:33 2012 |
Koji | Update | LSC | 22/110MHz path for POP | This a kind of self record...
We need an RF setup at POP to extract
22 and 110 MHz components separately. |
|
6366
|
Tue Mar 6 22:23:04 2012 |
Koji | Update | LSC | 22/110MHz path for POP |
As par Kiwamu's request, RF
filters for POP22 and POP110 were installed. |
|
6374
|
Wed Mar 7 15:56:36 2012 |
Koji | Update | LSC | 22/110MHz path for POP | The RF separator installed comprises of
the Minicircuits filters cascaded as in the
figure below. |
  |
8192
|
Wed Feb 27 20:50:41 2013 |
Manasa | Update | LSC | 22/110MHz path for POP | [Yuta, Manasa]
Modified POP path. |
|
8397
|
Tue Apr 2 23:14:02 2013 |
rana | Update | LSC | 22/110MHz path for POP |
|
|
2925
|
Wed May 12 23:31:17 2010 |
Alberto | Update | 40m Upgrading | 216 MHz resonance in the POY11 PD killed | It turned out that the resonance at 216
MHz in the 11MHz PD that I showed in the
elog entry 2902 |
 |
2926
|
Thu May 13 05:06:43 2010 |
rana | Update | 40m Upgrading | 216 MHz resonance in the POY11 PD killed |
This idea was tried before
by Dale in the ~1998 generation of PDs. Its |
|
13544
|
Fri Jan 12 20:35:34 2018 |
Udit Khandelwal | Summary | General | 2018/01/12 Summary |
40m Lab CAD
Worked |
|
12055
|
Wed Mar 30 16:40:24 2016 |
ericq | Update | LSC | 2016 vs 2010 | I haven't found any data files for
the DARM spectrum of the previous generation
of 40m, but with some GIMP-fu, I have plotted |
|
9730
|
Mon Mar 17 10:50:58 2014 |
steve | Update | safety | 2014 annual crane certification |
|
|
4651
|
Fri May 6 10:20:00 2011 |
steve | Summary | SAFETY | 2011 safety audit | The emphasis of this annual safety audit
was on safe electrical housekeeping
on March 3, 2011 |
 |
1620
|
Fri May 22 01:27:14 2009 |
pete | Update | SUS | 200 days of MC3 side | Looks like something went nuts in late
April. We have yet to try a hard reboot. |
|
547
|
Fri Jun 20 01:38:55 2008 |
rana | Update | PEM | 20 day Weather | Yoichi showed me that its possible to make
PNG images from PS using GS:
|
|
10899
|
Wed Jan 14 02:11:07 2015 |
rana | Summary | Treasure | 2-loop Algebra Loopology | I show here
the matrix formalism to calculate analytically
the loop TF relationships for the IMC w/ |
 |
16464
|
Thu Nov 11 00:11:39 2021 |
Koji | Summary | SUS | 2" to 3" sleeve issue | Yehonathan and Tega found that the new
PR3 and SR3 delivered in 2020 is in fact 3/4" |
6x |
16296
|
Wed Aug 25 08:53:33 2021 |
Jordan | Update | SUS | 2" Adapter Ring for SOS Arrived 8/24/21 | 8 of the 2"->3" adapter rings
(D2100377) arrived from RDL yesterday. I
have not tested the threads but dimensional |
  |
16364
|
Wed Sep 29 09:36:26 2021 |
Jordan | Update | SUS | 2" Adapter Ring Parts for SOS Arrived 9/28/21 | The remaining machined parts for the SOS
adapter ring have arrived. I will inspect
these today and get them ready for C&B. |
|
820
|
Mon Aug 11 00:58:31 2008 |
rana | Update | PEM | 2 years of temperature trend | The PSL RMTEMP alarmed again because it says
the room temperature is 19.5 C. Steve said
in
|
|
821
|
Mon Aug 11 09:39:29 2008 |
rana | Update | PEM | 2 years of temperature trend | Steve and I went around and inspected and
then adjusted the thermostats and [FONT=Comic
Sans MS]humidostats[/FONT].
|
|
5783
|
Wed Nov 2 10:41:47 2011 |
steve | Update | General | 2 spare heliax at the LSC rack | They were traced and labeled. One goes
to 1X2 and the other to AS-ISCT. They are
Andrew Heliax 1/4" od. made by CommScone, |
|
16778
|
Thu Apr 14 10:18:35 2022 |
Paco | Summary | BHD | 2 in oplev mirrors incompatible with LMR2V | [Paco, JC]
We realized the 2 in oplev mirrors
(Thorlabs BB2-E02) for ITMYOL, SRMOL, and |
|
3622
|
Wed Sep 29 16:56:36 2010 |
yuta | Update | VAC | 2 doors opened | (Steve, Koji, Joe, Kiwamu, Yuta)
Background:
The vent was started on Monday, |
|
2744
|
Wed Mar 31 16:55:05 2010 |
josephb | Update | Computers | 2 computers from Alex and Rolf brought to 40m | I went over to Downs today and was able
to secure two 8 core machines, along with
mounting rails. These are very thin |
|
9691
|
Wed Mar 5 11:33:10 2014 |
Koji | Summary | LSC | 2 arm ALS->LSC transition - road map | Step by step description of transition
from 2arm ALS to Common/Differential LSC
for FPMI |
|
6851
|
Fri Jun 22 02:21:57 2012 |
Jenne | Update | Green Locking | 2 arm ALS - Success!!!! | [Yuta, Jenne]
We |
 |
6852
|
Fri Jun 22 03:37:42 2012 |
Koji | Update | Green Locking | 2 arm ALS - Success!!!! | Are
these correct?
1. It is a nice work. |
|
6853
|
Fri Jun 22 10:52:18 2012 |
yuta | Update | Green Locking | 2 arm ALS - Success!!!! | Answers to questions from Koji.
|
|
3295
|
Mon Jul 26 20:30:35 2010 |
Jenne | Update | SUS | 2 Tip Tilts suspended and balanced | [Koji, Jenne]
We were on Team Cleanroom, while
Kiwamu and Alberto were on Team Chamber. |
|
2574
|
Fri Feb 5 14:31:46 2010 |
Jenne | Update | SUS | 2 SOS towers assembled | [Jenne, Kiwamu]
The 2 SOS towers for the ITMs have
been assembled, and are on the flow bench |
|
4830
|
Fri Jun 17 00:17:26 2011 |
rana | Configuration | Electronics | 2 RFPDs sent to LLO | Koji and I found 2 RFPD boxes to
send to LLO. We've put them onto Steve's
desk to be overnighted to Valera. |
|
1349
|
Tue Mar 3 11:39:50 2009 |
Osamu | DAQ | Computers | 2 PCs in Martian | Kiwamu and I brought 2 SUPER MICRO
PCs from Willson house into 40m.
Both PCs are hooked up into Martian |
|
7385
|
Fri Sep 14 01:18:51 2012 |
rana | Update | COC | 2 Layout Changes | After looking
at the in-vacuum layout I think we should |
|
7398
|
Mon Sep 17 18:04:01 2012 |
Steve | Update | COC | 2 Layout Changes |
|
|
3960
|
Sat Nov 20 02:25:30 2010 |
yuta | Update | CDS | 2 LOCKINs for suspension models | (Suresh, Koji, Yuta)
Background: |
|
3314
|
Wed Jul 28 18:24:57 2010 |
Jenne | Update | Green Locking | 2 Green Periscopes have mirrors, aligned | [Koji, Jenne, Kiwamu]
This is to describe the work that
went on in the Cleanroom today. Kiwamu's |
|
329
|
Thu Feb 21 19:55:46 2008 |
rana | Update | Electronics | 2 BNC Cables, 1 Tee | I'm not sure where [COLOR=purple]Ward and
Miller went to Analyzer school[/COLOR], but
it was probably uncredited.
|
|