1980
|
Wed Sep 9 10:13:31 2009 |
steve | Bureaucracy | General | the use of FAX machine, scanner & toaster |
You said that the use of FAXST
was forbidden for phds and graduate students. |
|
6894
|
Fri Jun 29 11:02:00 2012 |
steve | Update | VAC | the vent is at 500 torr |
|
 |
8907
|
Tue Jul 23 14:00:03 2013 |
Steve | Update | VAC | the vent is completed | The 40m IFO has reached atmospher
in 5 hours. It is ready to open chamber condition.
The RGA is pumped with the maglev. |
  |
12007
|
Wed Feb 24 09:06:25 2016 |
Steve | Update | Treasure | the way it happened | Celebration
|
|
1490
|
Thu Apr 16 16:37:42 2009 |
Alberto | Update | Auxiliary locking | the zipper | It takes 18 months to double the computational
power of microprocessors but it took man
thousands of years to invent the zipper. |
|
1491
|
Thu Apr 16 17:19:44 2009 |
Alberto | Update | Auxiliary locking | the zipper |
|
 |
8828
|
Thu Jul 11 09:24:03 2013 |
Steve | Update | General | there should be nothing left on optable tops | There are 4 oscilloscopes left on the AP
optical table top.... It's only 25 lbs...
|
|
11992
|
Tue Feb 16 09:13:39 2016 |
Steve | Update | General | there was a power outage & EQ | Pasadena reported the Sunday night event
as a power transient caused by the trip of
a power transmission line. This affected |
|
933
|
Fri Sep 5 10:36:34 2008 |
steve | Update | PEM | thermostate setting changed | Some one changed the thermostat (old control
room ) setting behind 1Y6 from 73 to 79F
It should be in the elog.
|
|
934
|
Fri Sep 5 15:09:50 2008 |
rana | Update | PEM | thermostate setting changed | [quote]Some one changed the thermostat (old
control room ) setting behind 1Y6 from 73
to 79F
|
|
936
|
Mon Sep 8 13:47:35 2008 |
steve | Update | PEM | thermostate setting changed | [quote][quote]Some one changed the thermostat
(old control room ) setting behind 1Y6 from
73 to 79F
|
|
9895
|
Thu May 1 17:14:36 2014 |
steve | Update | PSL | thin window AR measured | CVI broadband AR coating was measured at
the PSL-enclosure table around 9-10am today.
The 2W Innolight first PBS S polarization |
|
9902
|
Fri May 2 10:38:29 2014 |
steve | Update | PSL | thin window AR measured |
|
|
5586
|
Fri Sep 30 16:17:10 2011 |
kiwamu | Update | Green Locking | things to be done for the Yarm green lock | Thank you for the summary.
I
think now you are getting into a phase where |
|
3787
|
Tue Oct 26 16:02:55 2010 |
yuta | HowTo | CDS | things to do after making a new Simulink model | (Joe,Yuta)
Things to do after making a new Simulink |
|
5771
|
Mon Oct 31 15:58:25 2011 |
steve | Update | SUS | thinking of black glass baffles for 40m | Shade 12 black glass-green lines: 1/8"
thick, 6" wide x 7 "
high mounted on angle bracket below. |
 |
12357
|
Fri Jul 29 20:12:54 2016 |
gautam | Update | SUS | third time - no luck | [lydia, gautam]
Summary: |
|
12359
|
Mon Aug 1 14:09:20 2016 |
Steve | Update | SUS | third time - no luck | Gautam and Steve,
The clamp's left side was jammed
onto the left guide pin. It was installed |
|
2466
|
Wed Dec 30 09:57:53 2009 |
steve | Update | PSL | thirsty water chiller | I added 600 cc of Arrowhead Distilled Water
to the chiller.
60 days plot shows that about every |
|
3
|
Thu Oct 18 15:03:14 2007 |
ajw | Routine | General | this is only a test | [IMG]elog:3/1[/IMG]
[IMG]elog:3/2[/IMG] |
 |
5166
|
Wed Aug 10 07:59:33 2011 |
steve | Update | SUS | this is too dam nice |
|
|
7510
|
Tue Oct 9 09:29:10 2012 |
Steve | Update | IOO | this is where we are |
|
|
11885
|
Wed Dec 16 10:22:14 2015 |
Steve | Update | IOO | this morning | c1sus and c1ioo were restarted. PMC locked.
|
|
9878
|
Wed Apr 30 11:16:41 2014 |
Steve | Update | IOO | this typical morning | c1sus and c1iscey were reset. The PMC needed
to be locked. MC locked instantly.
The FSS ion pump power supply was |
|
9901
|
Fri May 2 08:38:07 2014 |
Steve | Update | IOO | this typical morning |
c1sus needed reset. |
|
1898
|
Thu Aug 13 11:20:43 2009 |
janosch | HowTo | PEM | three-channel self-noise estimation | There are two new Matlab files on the svn
in /mDV/extra/C1. 'mycsd.m' is to calculate
the cross-spectral density between two channels, |
|
1129
|
Mon Nov 10 19:39:40 2008 |
steve | Update | PEM | thump noise from particle counter | The particle counter is back on the IOOC location
on a piece of FOAM
It needs this isolation, so when the pump |
|
9369
|
Tue Nov 12 23:05:06 2013 |
rana | Update | PEM | thump noise from particle counter | [quote]The particle counter is back on the
IOOC location on a piece of FOAM
It needs this isolation, so when the pump |
|
1343
|
Fri Feb 27 13:49:19 2009 |
rob | Update | Locking | thurs night | Could not get past arm power of ~11 or
so. I was suspicious of the transmon
high-gain/low-gain PD handover, so I ran |
|
3410
|
Thu Aug 12 16:18:46 2010 |
steve | Update | Environment | tiles and adhesive removed |
|
    |
14124
|
Thu Aug 2 16:30:08 2018 |
Steve | Update | Treasure | time capsule location | I 've just found this time capsule
note from Nov. 26, 2000 by Kip Thorne:
LIGO will discover gravitational waves by |
|
6927
|
Fri Jul 6 08:38:04 2012 |
steve | Update | Computers | time out | Why do we have these timing blanks? |
|
15904
|
Thu Mar 11 14:27:56 2021 |
gautam | Update | CDS | timesync issue? | I have recently been running into hitting
the 4MB/s data rate limit on testpoints -
basically, I can't run DTT TF and spectrum |
 |
3974
|
Tue Nov 23 10:53:20 2010 |
josephb | Update | CDS | timing issues | Problem:
Front ends seem
to be experiencing a timing issue. |
|
9426
|
Mon Nov 25 12:57:54 2013 |
Jamie | Update | CDS | timing problem at c1iscex IO chassis | There is definitely a timing distribution
malfunction at the c1iscex IO chassis.
There is no timing link between the "Master |
|
9427
|
Mon Nov 25 17:28:33 2013 |
Jenne | Update | CDS | timing problem at c1iscex IO chassis |
|
|
9428
|
Wed Nov 27 14:45:49 2013 |
Jenne | Update | CDS | timing problem at c1iscex IO chassis | [Koji, Jenne]
The new fiber arrived today, and
we tried it out. |
|
6911
|
Wed Jul 4 17:33:04 2012 |
Jamie | Update | CDS | timing, possibly leap second, brought down CDS | I got a call from Koji and Yuta that something
was wrong with the CDS system. I somehow
had an immediate suspicion that it had something |
|
13231
|
Mon Aug 21 09:08:54 2017 |
Steve | Update | SUS | tiny glitches | They are synchronised tiny glitches. They
are not mechanical.
|
|
7924
|
Tue Jan 22 09:18:50 2013 |
Steve | Update | Tip - Tilt | tip tilt bases ordered | The corrected drawing base for tip tilt
with coils are going to the shop. The will
be back by the end of the week. |
|
7627
|
Thu Oct 25 22:52:07 2012 |
janosch | Update | General | tip-tilt phase maps | Now that I read Koji's last elog about
phase maps, I am not sure if these are still
required, but here they are (the tilt-removed |
6x |
7628
|
Thu Oct 25 23:00:44 2012 |
Manasa | Update | General | tip-tilt phase maps | Are these maps drawn from
the data we extracted using Image SXM?? |
|
7629
|
Thu Oct 25 23:14:42 2012 |
janosch | Update | General | tip-tilt phase maps |
|
|
7638
|
Mon Oct 29 11:27:42 2012 |
Manasa | Update | General | tip-tilt phase maps | [Jan, Manasa]
Below are phasemaps for the tip-tilts
with both tilt and RoC removed. We have not |
6x |
7639
|
Mon Oct 29 14:57:41 2012 |
janosch | Update | General | tip-tilt phase maps |
|
|
4357
|
Fri Feb 25 13:28:14 2011 |
kiwamu | Summary | General | to do list | Because it maybe useful to share
this kind of information among us, I just |
|
4359
|
Fri Feb 25 14:50:16 2011 |
Koji | Summary | General | to do list | - Put priority on the list
- Put names on the items
- Where is the CDS TO DO ==> Joe |
|
4364
|
Mon Feb 28 11:22:40 2011 |
josephb | Summary | General | to do list |
|
|
4322
|
Fri Feb 18 00:35:21 2011 |
kiwamu | Summary | General | to do list for Feb. 18th | DAYTIME
- more |
|
4310
|
Thu Feb 17 00:43:13 2011 |
kiwamu | Summary | General | to do list for tomorrow | Let's
share our tasks ! |
|