40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 332 of 355  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  752   Tue Jul 29 01:03:17 2008 robConfigurationIOOMC length measurementrob, yoichi

We measured the length of the mode cleaner
  
  753   Tue Jul 29 09:12:43 2008 KojiConfigurationIOOMC length measurementI found that the prev modulation freq had
been determined with a same kind of measurement
by Osamu, which also looked accurate.
  
  767   Wed Jul 30 13:09:40 2008 josephb, EricConfigurationPSLPMC scan experimentWe turned the PSL power down by a factor of
4, blocked one half of the Mach Zehnder and
scanned the PMC by applying a ramp signal
  
  773   Wed Jul 30 18:45:01 2008 ranaConfigurationSUSNew SUS Drift TechnologyI updated the SUS DRIFT screen again, this
time with a new feature.
  
  777   Thu Jul 31 16:11:22 2008 josephbConfigurationComputersMatlab on MegatronMatlab now works on megatron.

I did a few things:
  
  778   Fri Aug 1 01:13:32 2008 ranaConfigurationPSLPSL Quad change and new scriptKoji and I changed a few optics so that now
~60% of the beam that went to the PSL POS
QPD
  
  779   Fri Aug 1 10:45:46 2008 josephbConfigurationComputersMegatron now running tcshAt Rana's request, I've remotely switched
Megatron over to using tcsh.  I had to ssh
-X in order ot use the "/sbin/system-config-users"
  
  781   Fri Aug 1 16:33:52 2008 ranaConfigurationPSLPSL Quad change and new scriptHere's the sensor ringdown trend from the
kick.
 Untitled.png 
  783   Sat Aug 2 13:07:23 2008 KojiConfigurationGeneralThe AP table cleanedDuring the construction of the independent
PLL I cleaned up some of the unused optics
from the AP table. Essentially this should
  
  784   Sat Aug 2 16:05:38 2008 ranaConfigurationComputer Scripts / ProgramsmDV updateI did an [B]svn update on our mDV[/B] directory.
Justin has improved it so that the NDS client
binaries
  
  786   Sun Aug 3 20:53:54 2008 ranaConfigurationPEMGuralpWe got our repaired Guralp back in the mail
from England (s/n T4157). I plugged it in
to Ben's 3-Guralp breakout box (http://www.ligo.caltech.edu/docs/D/D060506-00.pdf)
  
  790   Mon Aug 4 12:12:20 2008 steveConfigurationVACthe ifo is at atmThe 40m vac envelope was vented this morning.
P1 is at 760 Torr
 vent3h.jpgUntitled.png 
  792   Mon Aug 4 16:20:20 2008 DmassConfigurationPhotosITMX magnet position relative to OSEMSWe have vented, and taken the following pics
of the magnets to document their position
before we ruin everything.
 DSC_0151.JPGDSC_0150.JPG 
  796   Tue Aug 5 02:39:55 2008 KojiConfigurationGeneralAbs. Len. Meas. ~ Optical Layout on the AP / PSL table 2008-Aug-05Here are the PDF and the PNG of the AP and
PSL table layouts.
After this photo, the squeezing setup at
 optical_layout_ap_table3.pngoptical_layout_ap_table3.pdfoptical_layout_PSL_table1.pngoptical_layout_PSL_table1.pdf 
  798   Tue Aug 5 10:56:05 2008 AlbertoConfigurationGeneralITMX chamber opened and mirror releasedD-Mass, Steve, Rana, Koji, Yoichi, Alberto,
We opened the ITMX chamber to check the optics
after last week earthquake. In particular,
  
  800   Tue Aug 5 17:56:23 2008 AlbertoConfigurationGeneralSRM and PRM inspectionYoichi, Koji, Rana, Steve, Alberto

Today we opened the [B]BSC[/B] to inspect
 IMG_1434.JPGIMG_1456.JPG 
  809   Thu Aug 7 11:54:26 2008 josephbConfigurationCamerasNew code + gstreamer allows for easy saving and compression of imagesModified the CamSnap code to output the image
data stream to standard out.  This can then
be piped into a gstreamer plugin and then
 testVideo.ogm 
  813   Fri Aug 8 10:58:05 2008 josephbConfigurationCamerasCameras and gstreamerIn regards to camera failure:
1) I forgot to reconnect that particular
camera to the network (my fault) so thats
  
  815   Fri Aug 8 12:21:57 2008 josephbConfigurationComputersSwitched X end ethernet connections over to new switchIn 1X4, I've switched the ethernet connections
from c1iscex and c1auxex over to the new
Prosafe 24 port switches.  They also use
  
  822   Mon Aug 11 11:36:11 2008 josephb, SteveConfigurationComputersc1susvme1 minor problemsAround 11 am c1susvme1 start having issues.
 Namely C1:SUS-PRM_FE_SYNC was railing at
some large value like 16384 (2^14).  I presume
  
  823   Mon Aug 11 12:42:04 2008 josephbConfigurationComputersContinuing saga of c1susvme1Coming back after lunch around 12:30pm, c1susvme1's
status was again red.  After switching off
watchdogs, a reboot (ssh, su, reboot) and
  
  824   Mon Aug 11 13:59:23 2008 josephbConfigurationComputers While poking around the crate, I noticed an
error light on one of the c1susvme2 related
boards was lit, while the corresponding light
  
  825   Mon Aug 11 15:07:49 2008 josephbConfigurationComputersProcyon aka fb40m switched to new switchI've connected Procyon to the Prosafe 24 port
switch with a new, labeled Cat6 cable.  Quick
tests with dataviewer shows that its working.
  
  828   Tue Aug 12 12:21:13 2008 josephbConfigurationCamerasVariation in fit over 140 images for GC650 and GC750Used matlab to calculate Gaussian fits on
145 GC650 images and 142 GC750 images.  These
were individual images (no averaging) looking
  
  831   Wed Aug 13 17:00:59 2008 steveConfigurationSUSBS sat amp removedThe PRM sat amp is broken. Ben is working
on it.
The BS sat amp was removed from the BS sus
  
  836   Thu Aug 14 19:08:14 2008 YoichiConfigurationSUSFree swing measurement going onI started free swinging spectra measurement
of all the suspensions now Aug 14 19:05 (PDT).
The watch dogs are all shutdown. Please do
  
  839   Fri Aug 15 11:52:32 2008 josephbConfigurationCamerasMulti-computer display and recording of digital camera outputThrough the magic of gstreamer, I've been
able to live play on one machine, compress
the image, send it to another machine via
  
  843   Fri Aug 15 19:32:49 2008 steveConfigurationVACpumpdown completeI have just reached vacuum normal. The maglev
peaked at 49.8C body temp with aux fan on
at 3.2 Torr
 pdprm.jpg 
  844   Mon Aug 18 08:07:10 2008 YoichiConfigurationSUSSuspension free swingingI've started a free swinging measurement of
OSEM spectra now. Please leave the watchdogs
untouched.
  
  847   Mon Aug 18 15:32:18 2008 josephbConfigurationCamerasHow to multicast with gstreamer and Gige CamerasIn order to get multicasting to work, one
simply needs to understand the address scheme.
  
  852   Tue Aug 19 13:34:58 2008 josephbConfigurationComputersSwitched c1pem1, c0daqawg, c0daqctrl over to new switchesMoved the Ethernet connections for c1pem1,
c0daqawg, and c0daqctrl over to the Netgear
Prosafe switch in 1Y6, using new cat6 cables.
  
  857   Tue Aug 19 19:14:17 2008 YoichiConfigurationDAQFixed C1:IOO-MC_RFAMPDDCYoichi, Rob

C1:IOO-MC_RFAMPDDC, which is a PD at the
  
  865   Thu Aug 21 10:24:20 2008 steveConfigurationSAFETYlaser safe mode conditionThe MOPA and PSL shutters are closed.
Manual beam blocks are in place.
Enclosure interlock is enabled.
  
  866   Thu Aug 21 16:28:59 2008 steveConfigurationSAFETYsafety glasses required I just opened the MOPA shutter so PA is warming
up.
  
  880   Mon Aug 25 14:42:09 2008 EricConfigurationCamerasETMX Digital CameraI changed the lens on the camera looking at
the ETMX to a 16mm, 1:1.4 zoom lens.  This
is in preparation to measure a couple parameters
  
  883   Mon Aug 25 21:15:23 2008 ranaConfigurationLSCaux NPRO off[FONT=Comic Sans MS][COLOR=purple]Looks like
no one has used the Lightwave NPRO on the
AS table after Koji left, so I turned it
  
  884   Tue Aug 26 09:04:59 2008 ranaConfigurationPSLPMC Servo Board: Out for RepairsI've started modifying our PMC board to bring
it up to the 21st century - [B][COLOR=blue]leave
the screen alone[/COLOR][/B] or else you
  
  887   Tue Aug 26 15:06:16 2008 steveConfigurationVACrga scanPumpdown 66 PRM-maglev vac normal -day 11
short form: pd66PRM-m-d11
 RGA-0808260125.png 
  893   Thu Aug 28 18:56:14 2008 ranaConfigurationPSLbeam block distortedThere was a beam block after the Mach Zender.
Who or what put this there?
  
  896   Fri Aug 29 10:20:32 2008 YoichiConfigurationPSLbeam block distorted[quote]There was a beam block after the Mach
Zender. Who or what put this there?
  
  897   Fri Aug 29 11:01:49 2008 josephbConfigurationComputersAttempt to change a channel gain in ICS-110BAs noted earlier by Rana, I was playing around
with the /cvs/cds/caltech/chans/daq/C1IOOF.ini
file with help from Rob.  I had made a backup
  
  899   Fri Aug 29 12:41:26 2008 josephb, EricConfigurationComputersMore front ends moved to new networkUsed Cat6 cables to finish moving all the
front ends in 1Y4 and 1Y5 over to the new
GigE network switches, specifically to the
  
  902   Fri Aug 29 16:35:18 2008 YoichiConfigurationPSLbeam block distorted[quote]There was a beam block after the Mach
Zender. Who or what put this there?
  
  903   Fri Aug 29 17:39:25 2008 ranaConfigurationPSLPMC: ADC ChannelsThe attached PNG shows the PMC error and controls
signals with no calibration.
 mcf.png 
  906   Sat Aug 30 13:28:01 2008 ranaConfigurationPSLPMC: List of changesThis is a list of changes made to the PMC
board while we had it out for modifying the
notch:
  
  908   Mon Sep 1 19:23:17 2008 YoichiConfigurationPSLFSS on an auxiliary loopSummary: The FSS is now temporarily disabled.
Naturally, the MC won't lock. I will fix
it tomorrow morning.
  
  910   Tue Sep 2 09:58:42 2008 YoichiConfigurationPSLFSS on an auxiliary loop[quote]Summary: The FSS is now temporarily
disabled. Naturally, the MC won't lock. I
will fix it tomorrow morning.
  
  913   Tue Sep 2 22:43:16 2008 YoichiConfigurationPSLUpdated FSS open loop TFSince the LO level of the FSS servo was too
low, I replaced the RF oscillator board with
a combination of
 OPLTF.png 
  915   Wed Sep 3 18:43:19 2008 YoichiConfigurationElectronicsTwo more active probesI found two active probes, an HP41800A and
a Tektronix P6201.
Thanks John for telling me you saw them before.
 Tektronix-P6201-active-probe.pdf 
  916   Wed Sep 3 18:45:01 2008 AlbertoConfiguration PD3 gainAlberto, Yoichi,

We found that the PD3 servo was unstable
  
ELOG V3.1.3-