40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 330 of 346  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  2472   Mon Jan 4 09:52:40 2010 ranaConfigurationCamerasITMX camera and PSL channelsI
fixed up the ITMX camera like we did for
ITMY recently (removed T's and added strain
  
  2473   Mon Jan 4 17:21:30 2010 JenneConfigurationIOOElusive Mode Matching Solution found!I think I have
finally found a Mode Matching solution for
 Awesome_MM_Solution.png 
  2481   Wed Jan 6 03:44:41 2010 KojiConfigurationIOOElusive Mode Matching Solution found!I
am in the way to get a reasonable optical
layout.
  
  2490   Fri Jan 8 20:13:49 2010 Alberto, JoBConfigurationComputersThe 40m Kaiser Permanent Reboot MarathonThis morning after Alex and Jo's tinkering
with Megatron the RFM network crashed and
it brought down also some computers. The
 pasadena_marathon.JPG 
  2518   Sun Jan 17 05:22:42 2010 ranaConfigurationComputersELOG script changeWith Dave Barker's help, I changed the
elog startup script. Instead of running as
a Daemon with the -D option,
  
  2549   Tue Jan 26 20:18:32 2010 ranaConfigurationALARMop540m: alarms and BLRMS and StripTool restoredI turned the StripTool and ALARMS and BLRMS
back on on op540m. Looks like it has been
rebooted 5 days ago and no one turned these
  
  2551   Thu Jan 28 09:14:51 2010 AlbertoConfigurationComputersc1iscey, c1iscex, c1lsc, c1asc rebootedThis morning the LSC scripts wheren't running
properly. I had to reboot c1iscey, c1iscex,
c1lsc, c1asc .
  
  2568   Wed Feb 3 11:13:15 2010 steveConfigurationGeneralplaned power outage for Sat. Feb 20The electrical shop has to connect the
new power transformer at CES. This means
we will have no AC power for ~8 hrs on Saturday,
  
  2573   Fri Feb 5 11:01:49 2010 steveConfigurationVACslow pumpdown valve I have installed a slow start throttle
valve in front of V3  This spring loaded
valve will cut down on the flow at high pressures.
 slow.JPG 
  2585   Wed Feb 10 16:27:47 2010 steveConfigurationGeneral IFO beam heightsIN
VACUUM beam heights are ALL 5.5" 
This is measured from the top of the
  
  2589   Thu Feb 11 15:53:59 2010 steveConfigurationVACPSL output shutter is closedJoe and Alex are working on the computers.
Our vacuum system is temporary "All
off" condition: meaning all valves are
  
  2592   Thu Feb 11 18:53:57 2010 steveConfigurationVACVAC NORMAL is back

    
        
  
  2605   Tue Feb 16 10:01:16 2010 AlbertoConfigurationLSCArms and PRC not lockingSince last Friday either the arms or the
PRC can't lock.
The montors show the beam flashing
  
  2607   Tue Feb 16 14:10:06 2010 josephb, rob, kojiConfigurationLSCArms and PRC not locking

    
        
  
  2608   Tue Feb 16 15:25:00 2010 AlbertoConfigurationLSCArms and PRC not locking 
 
 shock.jpg 
  2612   Thu Feb 18 10:10:43 2010 steveConfigurationGeneral480 V AC power turned offOnly the 40m cranes are running on 480VAC
The electricians are rewiring this transformer
on the mezzanine so it was shut down.
  
  2613   Thu Feb 18 15:39:16 2010 Koji and SteveConfigurationVACvalve condition: ALL OFFAs preparation for the upcoming planned
power outage we turned turbos, RGA off and
closed valves.
  
  2615   Fri Feb 19 02:38:32 2010 KojiConfigurationoplevsIntsant green oplevs for ITMs shooting from the endsI
set up instant green oplevs for ITMs.
A green laser pointer has been set
  
  2624   Mon Feb 22 11:38:05 2010 joe, jenne and steveConfigurationVACvacuum is back to normalMorning condition: vacuum rack power is
still off, no MEDM screen reading.....meaning
unknown vacuum pressure.We closed PSL shutter
  
  2631   Tue Feb 23 13:37:04 2010 kiwamu and steveConfigurationVACventing the 40m vac envelopeKiwamu and Steve have started venting
the 40m vacuum envelope.
Preparation:
  
  2633   Tue Feb 23 16:20:44 2010 steveConfigurationVACoutgassing + leak

    
        
 outgleak.jpg 
  2634   Tue Feb 23 16:42:02 2010 ranaConfigurationComputer Scripts / ProgramsSVN restarted on NODUSI ran the start Apache script as described
by Yoichi in the WIki. SVN back up.
  
  2635   Tue Feb 23 19:00:45 2010 kiwamuConfigurationVACvent finishedThe vent has been
finished.
  
  2636   Tue Feb 23 19:07:43 2010 kiwamu and steveConfigurationVACvent is completed

    
        
 vent2010feb23.jpg 
  2641   Thu Feb 25 19:59:50 2010 KojiConfigurationSUSITMX OSEMsKoji, Steve
ITMX OSEM CONFIGURATION
 
 osem_config_ITMX.png 
  2644   Fri Feb 26 15:32:13 2010 steveConfigurationVACpreparation for power outage: vacuum all offThere is a planned power outage tomorrow,
Saturday from 7am till midnight.
I vented all annulies and switched
 ventd3.jpg 
  2648   Mon Mar 1 11:21:50 2010 steveConfigurationVACvacuum contoller is back to normal


   
        
            
  
  2670   Fri Mar 12 17:08:22 2010 steveConfigurationVACbg-RGAscan at d18RGA scan of rga-region only at day 18  
This is the back ground of the rga with some
calibration gas.
 bg-d18_20100312scan.png 
  2695   Mon Mar 22 16:57:45 2010 josephb,daisuke, alexConfigurationComputersMegatron test points working againWe changed the pointer on /cvs/cds/caltech/target/gds/bin/awgtpman
from
/opt/gds/awgtpman    to
  
  2708   Wed Mar 24 12:38:17 2010 HartmutConfigurationGreen LockingBroadband PD for green PLLModified one of the PD assemblies carrying
a large SI-Diode (~10mm diameter).
Removed elements used for resonant
 SiAmpl.pngSiPhase.png 
  2709   Wed Mar 24 12:40:25 2010 daisukeConfigurationGeneralPeriscope for green laser delivery from the BSC to PSL tableThe periscope design for beam elevation
of the green beams is posted. The design
for the 90 deg steering version is also coming.
 40m_periscope.png40m_periscope_A_100329.pdf40m_periscope_A_dwg_100329.zip 
  2725   Mon Mar 29 01:45:26 2010 daisukeConfigurationGeneralPeriscope version B for green laser ...Here the design of the periscope for the
90 deg steering version is posted.
straight version http://nodus.ligo.caltech.edu:8080/40m/2709
 40m_periscope_B.png40m_periscope_B_100329.pdf40m_periscope_B_dwg_100329.zip 
  2730   Mon Mar 29 18:41:34 2010 KojiConfigurationSUSStarted to build TTsSteve and Koji
WE started to build 5 TTs. 4 of them
are used in the recycling cavities. One is
 IMG_2348.jpg 
  2732   Mon Mar 29 21:43:27 2010 AlbertoConfigurationPSLReference Cavity PD Noise Spectrum[Rana, Alberto]
This evening we measured the noise
spectrum of the reference cavity PD used
 2010-03-29_FSS_PD_shotnoise_and_darknoise.png2010-03-29_FSS_PD_shotnoise_and_darknoise.png 
  2733   Tue Mar 30 06:37:32 2010 ranaConfigurationPSLReference Cavity PD Noise SpectrumSome more words about the RFAM: I noticed
that there was an excess RFAM by unlocking
the RC and just looking at the RF out with
 rc.png 
  2759   Sat Apr 3 11:35:47 2010 ranaConfigurationPSLReference Cavity PD Noise SpectrumThe units on this
plot are completely bogus - we know that
the thermal noise from the resonant part
  
  2760   Sat Apr 3 16:07:40 2010 AlbertoConfigurationPSLReference Cavity PD Noise Spectrum I was aware of a problem on those
units since I acquired the data. Then it
wasn't totally clear to me which were the
 2010-03-29_FSS_PD_shotnoise_and_darknoise.png 
  2789   Mon Apr 12 16:20:05 2010 AlbertoConfiguration40m UpgradingREFL55 improvedDuring the commissioning of the AS55
PD, I learned how to get a much better rejection
of the 11MHz modulation.
So I
 2010-04-12_REFL55_TF_model_to_meas_comparison.png 
  2805   Mon Apr 19 05:54:50 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarilyIn order to measure the transfer function
of the RC cavity's foam, I've turned off
the servo so that the room temperature noise
 Untitled.png 
  2808   Mon Apr 19 13:23:03 2010 josephbConfigurationComputersyum update fixed on control room machinesI went to Ottavia, and tried running yum
update.  It was having dependancy issues
with mjpegtools, which was a rpmforge provided
  
  2849   Tue Apr 27 11:16:13 2010 josephbConfigurationCDSWiki page with CDS .mdl names, shared memory allocationI've added a new page in the wiki which
describes the current naming scheme for the
.mdl model files used for the real time code
  
  2873   Mon May 3 17:49:41 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarily


   
        
            
 rct.png 
  2875   Tue May 4 02:28:38 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarily 
 My attempt to passively measure
  
  2876   Tue May 4 06:32:58 2010 albertoConfigurationPSLRC Temperature Servo Turned OFF temporarily


   
        
            
  
  2881   Wed May 5 02:37:55 2010 ranaConfigurationPSLRC Temperature Servo Turned OFF temporarily


   
        
            
 Picture_7.png 
  2901   Sun May 9 20:02:23 2010 ranaConfigurationSUSSUS filters deleted again to reduce CPU load on c1susvme2 againOn Friday, I deleted a bunch of filters
from the c1susvme2 optics' screens (MC1,2,3
+ SRM) so as to reduce the CPU load and keep
 40.png400.png 
  2922   Wed May 12 12:32:04 2010 josephbConfigurationCDSModified /etc/rc.d/rc.local on megatronI modified the /etc/rc.d/rc.local file
on megatron removing a bunch of the old test
module names and added the new lsc and lsp
  
  2923   Wed May 12 12:58:26 2010 josephbConfigurationCDSSetup fb to handle lsc, lsp models on megatronI modified /cvs/cds/caltech/target/fb and
changed the line "set controller_dcu=10"
to "set controller_dcu=13" (where
  
  2938   Mon May 17 02:10:10 2010 KojiConfigurationIOOHow to lock / align the MCLet
me remind you how to lock and align the IMC
To lock
  
  2939   Mon May 17 10:57:16 2010 steveConfigurationSUSdamping restored to ETMYsETMY-south sus damping was restored   