40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 329 of 348  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  4552   Thu Apr 21 15:03:29 2011 steveUpdateComputersjuction board finds homeThe anti aliasing box was opened up at
the back to accommodate the junction board
and the SCSI cable towards the ADC. Aluminum
 P1070570.JPGP1070568.JPG 
  4553   Thu Apr 21 15:20:46 2011 steveUpdatePEMPSL enclosure work today

    

       
            
 P1070558.JPGP1070560.JPG 
  4597   Mon May 2 13:43:05 2011 steveFrogsPhotosbirthday boys.....Happy.... Birthday.... to.... Joseph...
and... Jamie...Happy....Birthday..... to....
You............sing with us........Happy
 P1070622.JPG 
  4599   Mon May 2 17:10:55 2011 steveUpdateSUSPRM oplevThe returning spot diameter on the qpd
~10 mm. In order to reduce the spot size
I moved the f 1145 mm lens toward the PRM
  
  4615   Tue May 3 15:59:22 2011 steveFrogsPhotosX-mas comes earlyThe little red all terrain cargo wagon
40" x 18"  has just arrived
on pneumatic wheels.
 P1070634.JPG 
  4616   Tue May 3 16:20:13 2011 steveUpdateSUSPRM & BS oplevs are ready

    

       
            
 P1070630.JPGP1070632.JPG 
  4633   Thu May 5 10:19:22 2011 steveUpdatePSLPSL-FSS_RMTEMP is backValera and I installed the the temp sensor
and the interface box that Rana fixed. This
may help with diagnosing the PSL drift.
 P1070637.JPG 
  4641   Thu May 5 15:05:06 2011 steveUpdatePSLPSL-FSS_RMTEMP is not back

    
        
 rtnfxd.jpg 
  4644   Thu May 5 15:33:37 2011 steveConfigurationRF SystemLSC rackNew right angle PVC front panel with SMA
bulkhead connectors are in place. The connections
are still lose. It is ready for Suresh to
 P1070641.JPGP1070639.JPG 
  4651   Fri May 6 10:20:00 2011 steveSummarySAFETY2011 safety auditThe emphasis of this annual safety audit 
was on  safe  electrical housekeeping
on March 3, 2011
 sa2011done1.pdfP1070448.JPG 
  4654   Fri May 6 15:59:40 2011 steveUpdateVACTP3 fore pump replacedDry fore pump of TP3 replaced by brand
new Varian SH-110  at  1.1 Torr_75,208
hrs
  
  4655   Fri May 6 17:11:55 2011 steveUpdateSUSSRM-oplev cable The SRM qpd cable was removed from the
BS-table. It's path was changed from 1x4
to ITMY-table following the inner cable tray.
  
  4678   Tue May 10 11:14:44 2011 steveUpdatePSLPSL-QPD_ANG qpd optimizedValera and I placed F 572.7 mm lens ~15
cm away  from the ang  qpd (in
the same mount with ND filter) so that two
 qpdangl.jpg 
  4686   Wed May 11 11:05:45 2011 steveUpdateSUSETMX_OPLEV : He-Ne replaced

    

       
            
 P1070672.JPG 
  4687   Wed May 11 11:24:59 2011 steveUpdateSUSSRM-oplev qpd is back

    

       
            
 srm-prm_oplevs.jpg 
  4689   Wed May 11 13:54:32 2011 steveUpdateLSCLSC power suppliesAux- rack _1Y2 is just behind 1Y3 
It contains Kepco Analoge DC power supplies
for +- 5, 15 and 24V
 P1070679.JPG 
  4700   Thu May 12 08:54:11 2011 steveUpdateIOOIP_POS cable found

    

       
            
  
  4701   Thu May 12 09:00:23 2011 steveUpdateGeneraloptical table covers must be usedI found ITMX-ISCT and BS-ISCT ( IFO sensing-control
table)  not covered this morning. Please
do not leave tables open.
  
  4728   Mon May 16 17:11:28 2011 steveUpdateElectronicsstrain relieved 1X11X1 is strain relieved in the back. I will
use similar approach on the rest of the racks
.
 P1070724.JPG 
  4750   Thu May 19 17:53:03 2011 steveUpdateCDSAA filter box modified at 1X5

    

       
            
 P1070727.JPG 
  4768   Fri May 27 17:52:53 2011 steveUpdateLSCLSC rack cables strain relieved & labeledLSC rack 1Y2 cables are strain relieved
and labeled. Spare and/or obsolete cables
are laid out on the top of the beam tube
  
  4771   Tue May 31 11:34:13 2011 steveSummarySAFETYsafety glasses checked  1064 nm transmison were measured
of 40m safety glasses as shown . Their performance
did not degrade. They are as good as their
 P1070823.JPG 
  4775   Tue May 31 17:30:42 2011 steveUpdateSUSETMY damping restoredETMY's watch dogs were found tripped. They
were restored.
  
  4784   Fri Jun 3 18:12:03 2011 steveUpdateComputersno PEM channelsAA filter box was removed and modified
at 1Y7 today. The -5V power supply was current
limited when I plugged it back in. It was
  
  4789   Mon Jun 6 17:28:31 2011 steveUpdateComputersstill, no PEM channels

    

       
            
 P1070846.JPG 
  4794   Tue Jun 7 16:11:09 2011 steveUpdateCamerasITM camera lenses changedComputar  75-12.5 zooms were installed
for closer look at the resonant spots. 
Their alignment and focus needs more loving
 P1070865.JPGP1070860.JPG 
  4798   Thu Jun 9 10:38:30 2011 steveUpdatePSLPMC needs helpThe PMC is losing power.  pmcnothp.jpg 
  4814   Tue Jun 14 09:24:36 2011 steveConfigurationPhotosSUS binary IO chassis 2 and 3 moved from 1X5 to 1X4

    

       
            
 P1070891.JPGP1070893.JPG 
  4828   Thu Jun 16 08:45:14 2011 steveUpdateSUSVertex SUS Binary Output Boxes removed

    

       
            
 P1070894.JPG 
  4831   Fri Jun 17 08:03:48 2011 steveUpdateSUSITMY sus damping restoredITMY sus damping restored.
 
  
  4836   Mon Jun 20 09:04:13 2011 steveUpdateSUSETMX damping restoredETMX sus damping restored   
  4842   Mon Jun 20 16:44:02 2011 steveUpdateABSLI-P curve of LightWave M126-1064-700 
 Put the serial numbers into
the elog. So we can identify the laser and
  
  4847   Tue Jun 21 16:11:13 2011 steveUpdateSAFETYsurf safety training40m surfs:  Nicole Ing, Iswita Saikia
and Sonali Mohapatra received 40m specific
safety training  today.
 P1070902.JPG 
  4865   Thu Jun 23 10:17:49 2011 steveUpdatePSLAP table is open to PSL againAccess to the north side of the PSL table
is blocked by the    8" beam
guard. This opens the beam pathways between
 P1070911.JPGP1070910.JPG 
  4866   Thu Jun 23 10:35:12 2011 steveUpdateComputersold computers leaving the labRod Luna picked up these computers for
Larry Wallace yesterday: Dell Inspiron 530,
Dell Dimension 4600 and SunBlade 1000
 P1070905.JPGP1070904.JPGblade1000.JPG 
  4876   Fri Jun 24 07:40:23 2011 steveUpdateSUSPRM damping restoredThe PRM sus damping restored. C1:SUS-PRM_SDPD_VAR
is still 20-30mV and going up.  Side
gain  turned on. This pulled it down
  
  4877   Fri Jun 24 07:49:23 2011 steveUpdateABSLI-P curve of LWE with serial numbers

    

       
            
  
  4878   Fri Jun 24 10:38:01 2011 steveUpdateCamerasITMY camera gets fixedITMY gets new Tamron M118FM50 that has
improved close focusing. It is a small fixed
focal length camera so the video tube cover
  
  4891   Mon Jun 27 16:57:06 2011 steveUpdatePhotosHaixing is backHe has moved the levitation stuff for his
surf student to Jan's lab in W-Bridge.
 P1070914.JPG 
  4896   Tue Jun 28 10:11:13 2011 steveUpdateIOOPower incident on REFL11 and REFL55


   
        
            
  
  4900   Tue Jun 28 15:23:21 2011 steveUpdateElectronicsCoilcraft RF-design kits are restockedOur design kits are full again. They are
waiting for a new brilliant PD design.
 P1070917.JPGP1070915.JPG 
  4909   Wed Jun 29 11:45:54 2011 steveUpdateGeneralwhere are we storing PDs ?Photo diodes stored in the east arm cabinet
E4:  ALL PDs  meet here, fast 
or slow......
 P1070921.JPG 
  4924   Thu Jun 30 17:24:46 2011 steveUpdateSAFETYsafety interlocks Lightwave M126-1064-700 lasers  sn415 
at east end of the Y arm and  sn201
at the AP table  are connected individually 
 P1070949.JPGP1070948.JPG 
  4937   Tue Jul 5 08:32:38 2011 steveUpdatePEMbad air quality in the labThe fireworks of yesterday showing up in
the lab. Pasadena out side air 6.6 million 
cfm for 0.3 micron particles  and 1.5
 badaq.jpgjuly4pem.jpg 
  4938   Tue Jul 5 13:35:56 2011 steveUpdateSUSPRM damping restoredThe PRM sus damping was restored. It's
side rms motion came down from 35 to 4 mV
immediately.     
  
  4952   Thu Jul 7 10:25:34 2011 steveHowToGeneralcleaning out refregeratorPlease ask the owner unless  it is
rotten. Do not put food into garbage can
inside. Take them outside so you are not
  
  4953   Thu Jul 7 13:57:28 2011 steveHowToSAFETYhow not toI found baked allen keys on the top of
the clean optics cabinet.  Somewhat
heavy box that can come down in an earthquake
  
  4960   Mon Jul 11 14:03:37 2011 steveHowTolorehow to visit your old labAlberto is visiting us from Australia.
He brought some terrific presents. It is
going to be very demanding task to wait for
 P1080069.JPG 
  4976   Fri Jul 15 16:14:00 2011 steveUpdateSUSBS oplev error signal spectra   BS_opl_ersig.pdf 
  4981   Mon Jul 18 10:24:48 2011 steveHowToGeneralsolvent bottles for cleaning opticsEach bottle has matched seals. They are
not interchangeable.
It is critical that the solvent do
 P1080090.JPG 
ELOG V3.1.3-