40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 328 of 344  Not logged in ELOG logo
    Reply  Tue Feb 16 15:25:00 2010, Alberto, Configuration, LSC, Arms and PRC not locking shock.jpg
 
 
Entry  Thu Feb 18 10:10:43 2010, steve, Configuration, General, 480 V AC power turned off 
Only the 40m cranes are running on 480VAC The electricians are rewiring this transformer on the mezzanine so it was shut down.
I tested all three cranes before the 480V power was turned off. The last thing to do with the cranes to wipe them down before use.
It will happen on next Tuesday morning.
Entry  Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF 
As preparation for the upcoming planned power outage we turned turbos, RGA off and closed valves.
IFO chamber is not pumped now. Small leaks and out gassing will push the pressure up slowly. At 3 mTorr of P1 the PSL output shutter
will be closed by the interlock.
Entry  Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends 
I set up instant green oplevs for ITMs.
A green laser pointer has been set on each end table. It illuminates the ITM center. The beam goea through the ETM substrate.
The reflected green beam returns to the ETM if the ITMs are aligned. Even though the reflected beam to the end is too big, this can 
Entry  Mon Feb 22 11:38:05 2010, joe, jenne and steve, Configuration, VAC, vacuum is back to normal 
Morning condition: vacuum rack power is still off, no MEDM screen reading.....meaning unknown vacuum pressure.We closed PSL shutter immediately.
Joe restored c1iscepis and Jenne powered up the vac-rack UPS. Now the rest of the vac-rack power were restored from starting at the top to bottom.
P1 was reading 15 mTorr.  We restarted pumps and  set vacuum valve positions. V1 opening required Rob's recipe of elog # 1863 to defeat
Entry  Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope 
Kiwamu and Steve have started venting the 40m vacuum envelope.
Preparation:
centered oplevs at resonating cavities,
    Reply  Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak outgleak.jpg


    
        
            Quote:
        
        
            
            As preparation for the upcoming planned power outage we turned turbos, RGA off and closed valves.
Entry  Tue Feb 23 16:42:02 2010, rana, Configuration, Computer Scripts / Programs, SVN restarted on NODUS 
I ran the start Apache script as described by Yoichi in the WIki. SVN back up.
Entry  Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished 
The vent has been finished.
Now the pressure inside the chamber is 760 torr, and it's getting equilibrium with the atmospheric pressure.
Therefore we are ready and can open the door of the chamber tomorrow.
    Reply  Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed vent2010feb23.jpg


    
        
            Quote:
        
        
            
            Kiwamu and Steve have started venting the 40m vacuum envelope.
Entry  Thu Feb 25 19:59:50 2010, Koji, Configuration, SUS, ITMX OSEMs osem_config_ITMX.png
Koji, Steve
ITMX OSEM CONFIGURATION
 
Entry  Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off ventd3.jpg
There is a planned power outage tomorrow, Saturday from 7am till midnight.
I vented all annulies and switched to ALL OFF configuration. The small region of the RGA is still under vacuum.
The vac-rack: gauges, c1vac1 and UPS turned off.
    Reply  Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal 


    
        
            Quote:
        
        
            
            There is a planned power outage tomorrow, Saturday from 7am till midnight.
Entry  Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18 bg-d18_20100312scan.png
RGA scan of rga-region only at day 18   This is the back ground of the rga with some calibration gas.
Entry  Mon Mar 22 16:57:45 2010, josephb,daisuke, alex, Configuration, Computers, Megatron test points working again 
We changed the pointer on /cvs/cds/caltech/target/gds/bin/awgtpman from
/opt/gds/awgtpman    to
/cvs/cds/caltech/target/gds/bin/awgtpman.091215.
Entry  Wed Mar 24 12:38:17 2010, Hartmut, Configuration, Green Locking, Broadband PD for green PLL SiAmpl.pngSiPhase.png
Modified one of the PD assemblies carrying a large SI-Diode (~10mm diameter).
Removed elements used for resonant operation and changed PD readout to transimpedance
configuration. The opamp is a CLC409 with 240 Ohm feedback (i.e. transimpedance) resistor.
Entry  Wed Mar 24 12:40:25 2010, daisuke, Configuration, General, Periscope for green laser delivery from the BSC to PSL table 40m_periscope.png40m_periscope_A_100329.pdf40m_periscope_A_dwg_100329.zip
The periscope design for beam elevation of the green beams is posted. The design for the 90 deg steering version is also coming.
(2010-03-29: update drawings by daisuke)
90deg version: http://nodus.ligo.caltech.edu:8080/40m/2725
Entry  Mon Mar 29 01:45:26 2010, daisuke, Configuration, General, Periscope version B for green laser ... 40m_periscope_B.png40m_periscope_B_100329.pdf40m_periscope_B_dwg_100329.zip
Here the design of the periscope for the 90 deg steering version is posted.
straight version http://nodus.ligo.caltech.edu:8080/40m/2709
Entry  Mon Mar 29 18:41:34 2010, Koji, Configuration, SUS, Started to build TTs IMG_2348.jpg
Steve and Koji
WE started to build 5 TTs. 4 of them are used in the recycling cavities. One is the spare.
We built the structure and are building the cantilever springs.
Entry  Mon Mar 29 21:43:27 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum 2010-03-29_FSS_PD_shotnoise_and_darknoise.png2010-03-29_FSS_PD_shotnoise_and_darknoise.png
[Rana, Alberto]
This evening we measured the noise spectrum of the reference cavity PD used in the FSS loop. From that we estimated the transimpedance and found
that the PD is shot-noise limited. We also found a big AM oscillation in correspondence of the FSS modulation sideband which we later attenuated at least
    Reply  Tue Mar 30 06:37:32 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum rc.png
Some more words about the RFAM: I noticed that there was an excess RFAM by unlocking the RC and just looking at the RF out with the 50 Ohm input of the
scope. It was ~100 mVp-p! In the end our method to minimize the AM was not so sensible - we aligned the waveplate before the EOM so as to minimize the
p-pol light transmitted by the PBS cube just ahead of the AOM. At first, this did not minimize the RFAM. But after I got angry at the bad plastic mounting
    Reply  Sat Apr 3 11:35:47 2010, rana, Configuration, PSL, Reference Cavity PD Noise Spectrum 
The units on this plot are completely bogus - we know that the thermal noise from the resonant part of the circuit is just V = sqrt(4*k*T*Z)
~ 3nV/rHz. Then the gain of the MAX4107 stage is 10. The output resistor is 50 Ohms, which forms a divide by 2 with the input impedance of the spectrum
analyzer and so the bump in the dark noise should only be 15 nV/rHz and not microVolts.

    Reply  Sat Apr 3 16:07:40 2010, Alberto, Configuration, PSL, Reference Cavity PD Noise Spectrum 2010-03-29_FSS_PD_shotnoise_and_darknoise.png
 I was aware of a problem on those units since I acquired the data. Then it wasn't totally clear to me which were the units of the data as downloaded
from the Agilent 4395A, and, in part, still isn't.
It's clear that the data was in units of spectrum, an not spectral density: in between the two there is a division by the bandwidth (100KHz, in
Entry  Mon Apr 12 16:20:05 2010, Alberto, Configuration, 40m Upgrading, REFL55 improved 2010-04-12_REFL55_TF_model_to_meas_comparison.png
During the commissioning of the AS55 PD, I learned how to get a much better rejection of the 11MHz modulation.
So I went back to REFL55
and I modified it using the same strategy. (Basically I added another notch to the circuit).
After a few days of continuous back and forth
between modeling, measuring, soldering, tuning I got a much better transfer function.
All the details and data will be included in the wiki page
Entry  Mon Apr 19 05:54:50 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily Untitled.png
In order to measure the transfer function of the RC cavity's foam, I've turned off the servo so that the room temperature noise can excite it.
The attached plot shows a step response test from 2 weeks ago. Servo is nominally still working fine.
Entry  Mon Apr 19 13:23:03 2010, josephb, Configuration, Computers, yum update fixed on control room machines 
I went to Ottavia, and tried running yum update.  It was having dependancy issues with mjpegtools, which was a rpmforge provided package. 
In order to get it to update, I moved the rpmforge priority above (a lower number) that of epel ( epel -> 20 from 10, rpmforge -> 10 to 20). 
This resolved the problem and the updates proceeded (all 434 of them). yum update on Ottavia now reports nothing needs to be done.
Entry  Tue Apr 27 11:16:13 2010, josephb, Configuration, CDS, Wiki page with CDS .mdl names, shared memory allocation 
I've added a new page in the wiki which describes the current naming scheme for the .mdl model files used for the real time code generator.  Note,
that these model names do not necessarily have to be the names of the channels contained within.  Its still possible to make all suspension related
channels start with C1:SUS- for example.  I'm also allocating 1024 8 byte channels for shared memory address space for each controller and each simulated
    Reply  Mon May 3 17:49:41 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily rct.png


    
        
            Quote:
        
        
            
            In order to measure the transfer function of the RC cavity's foam, I've turned off the servo so that the room temperature
    Reply  Tue May 4 02:28:38 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily 
 
 My attempt to passively measure the transfer function of the foam failed fantastically.
As it turns out, the room temperature fluctuations inside the PSL box reach the 1 mK/rHz noise floor of the  AD590 (or maybe the ADC) at ~1-2
    Reply  Tue May 4 06:32:58 2010, alberto, Configuration, PSL, RC Temperature Servo Turned OFF temporarily 


    
        
            Quote:
        
        
            
             
    Reply  Wed May 5 02:37:55 2010, rana, Configuration, PSL, RC Temperature Servo Turned OFF temporarily Picture_7.png


    
        
            Quote:
        
        
            
             more detailed instructions needed....
Entry  Sun May 9 20:02:23 2010, rana, Configuration, SUS, SUS filters deleted again to reduce CPU load on c1susvme2 again 40.png400.png
On Friday, I deleted a bunch of filters from the c1susvme2 optics' screens (MC1,2,3 + SRM) so as to reduce the CPU load and keep it from going bonkers.
This first plot shows the CPU trend over the last 40 days and 40 nights. As you can see the CPU_LOAD has dropped by 1 us since I did the deleting.
Entry  Wed May 12 12:32:04 2010, josephb, Configuration, CDS, Modified /etc/rc.d/rc.local on megatron 
I modified the /etc/rc.d/rc.local file on megatron removing a bunch of the old test module names and added the new lsc and lsp modules, as well as a
couple planned suspension models and plants, to shared memory so that they'll work.  Basically I'm trying to move forward into the era of working
on the actual model we're going to use in the long term as opposed to continually tweaking "test" models.
Entry  Wed May 12 12:58:26 2010, josephb, Configuration, CDS, Setup fb to handle lsc, lsp models on megatron 
I modified /cvs/cds/caltech/target/fb and changed the line "set controller_dcu=10" to "set controller_dcu=13" (where 13 is the lsc
dcu_id number).
I also changed the set gds_server line from having 10 and 11 to 13 and 14 (lsc and lsp).
Entry  Mon May 17 02:10:10 2010, Koji, Configuration, IOO, How to lock / align the MC 
Let me remind you how to lock and align the IMC
To lock
1. Open the doors for the IMC/OMC chambers. Open the manual shutter of the PSL just in front of the optical window
Entry  Mon May 17 10:57:16 2010, steve, Configuration, SUS, damping restored to ETMYs 
ETMY-south sus damping was restored
Entry  Tue May 18 11:54:29 2010, steve, Configuration, SAFETY, psl mechanical shutter is not working 
As we learned yesterday, the PSL laser power out put mechanical shutter is not working in the remote mode. It only works in local manual mode.
Do not rely on the MEDM screen monitor readout! The position is only changing on the monitor. The main beam must be blocked before the output periscope.
    Reply  Tue May 18 15:09:02 2010, steve, Configuration, SAFETY, PSL output shutter in order again 


    
        
            Quote:
        
        
            
            As we learned yesterday, the PSL laser power out put mechanical shutter is not working in the remote mode. It only
Entry  Thu May 20 12:34:46 2010, kiwamu, Configuration, 40m Upgrading, optical breadboards with legs leg1_small.pngleg2_small.png
Yesterday Steve and I revived two legs to mount some optical breadboards outside of the end table.
These legs had been used as oplev's mounts many years ago, but now they are served for 40m upgrading. These are really nice.

    Reply  Fri May 21 08:28:29 2010, steve, Configuration, VAC, TP3 turned off 


    
        
            Quote:
        
        
            
            [Jenne, Kiwamu, and Steve via phone]
Entry  Fri May 21 16:37:35 2010, steve, Configuration, VAC, tp3's drypump replaced 
Bob replaced the tipseal in an other drypump and I swapped it in. TP3 turbo is running again, it's foreline pressure is 40 mTorr. The RGA is still off
Entry  Mon May 24 07:53:57 2010, steve, Configuration, PEM, air cond. just turned ON acoff.jpg
IFO room temp 27.5C , Please remember to turn AC back on !
    Reply  Tue May 25 09:12:46 2010, kiwamu, Configuration, Green Locking, effect from air conditioner green_spot.png
We should completely turn off the air conditioner when working on green locking.
Even if green beams propagates inside of chambers, the air conditioner
does affect the spatial jitter of the beam. 
Entry  Wed May 26 22:22:03 2010, Alberto, Configuration, 40m Upgrading, Arm cavity length reflRFpowerVsArmLength_3658m.pngreflRFpowerVsArmLength_3750m.png
The second sideband is resonant in the arms for a cavity length of 37.9299m.
The nearest antiresonant arm lengths for f2 (55MHz) are 36.5753m and 39.2845m.
If we don't touch the ITMs, and we use the room we still have now on the end tables, we can get to 37.5m.
Entry  Sun May 30 15:33:21 2010, Alberto, Configuration, IOO, mode cleaner and air conditioning 
The mode cleaner is locked and the air conditioning is full on. So the the air conditioning doesn't seem to be so important for the lock to hold.
Entry  Sun May 30 15:36:22 2010, Alberto, Configuration, PSL, IMC periscope shutter 
Two days ago I opened the PSL shutter by switching the switch on the shutter driver. That caused the shutter's switch on the medm screen to work in reversed
mode: open meant closed and closed meant open.
I fixed that. Now the medm screen switch state is correct.
Entry  Tue Jun 1 06:30:38 2010, Koji, Configuration, 40m Upgrading, effect of the arm length  arm_cavity1.pngarm_cavity2.pngarm_cavity.nb.zip
I checked the effect of the arm length to the reflectance of the f2(=5*f1) sidebands.
Conclusion: If we choose L_arm = 38.4 [m], it looks sufficiently being away from the resonance
We may want to incorporate small change of the recycling cavity lengths so that we can compensate the phase deviation from -180deg.
Entry  Wed Jun 16 18:12:16 2010, nancy, Configuration, Computers, 40MARS 
i added my laptop's mac address to teh martian at port 13 today.
 
    Reply  Wed Jun 16 18:44:07 2010, Alberto, Configuration, Computers, 40MARS 


    
        
            Quote:
        
        
            
            i added my laptop's mac address to teh martian at port 13 today.
Entry  Wed Jun 23 18:05:00 2010, Koji, Configuration, PSL, FSS SLOWDC should be ~-4.0 C1PSL_FSS.png
FSS SLOWDC slider is at around 0.
 Please someone relock this at ~-4.0 to exploit some last juice of the fruit.
See this entry for the details of the operating point.
ELOG V3.1.3-