40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 316 of 341  Not logged in ELOG logo
Entry  Fri Apr 12 02:56:34 2013, Den, Update, Locking, prcl angular motion pointing.pngoplev_exc.pdf
    Reply  Fri Apr 12 09:20:32 2013, rana, Update, Locking, prcl angular motion 
    Reply  Fri Apr 12 13:21:34 2013, Den, Update, Locking, prcl angular motion 
    Reply  Sat Apr 13 03:45:51 2013, rana, Update, Locking, prcl angular motion 
    Reply  Sat Apr 13 23:11:04 2013, Den, Update, Locking, prcl angular motion pointing.pdf
    Reply  Sun Apr 14 17:56:03 2013, rana, Update, Locking, prcl angular motion 
    Reply  Mon May 13 18:44:04 2013, Jenne, Update, Locking, prcl angular motion TT_Q_measurements.pdf
Entry  Wed Feb 6 10:07:23 2019, Chub, Update, , pre-construction inspection 
    Reply  Fri Sep 30 19:12:56 2011, Koji, Update, General, prep for poweroutage 
    Reply  Tue Oct 17 17:53:25 2017, jamie, Summary, LSC, prep for tests of Gabriele's neural network cavity length reconstruction c1dnn.png
    Reply  Wed Oct 18 12:14:08 2017, jamie, Summary, LSC, prep for tests of Gabriele's neural network cavity length reconstruction 
Entry  Fri Jun 29 02:17:40 2012, yuta, Update, IOO, prep for the vent - beam attenuating 
    Reply  Fri Jun 29 03:21:32 2012, yuta, Update, General, prep for the vent - others MEDMscreenshotswithCOW_20120629.png
Entry  Tue Jun 26 20:59:36 2018, aaron, Update, OMC, prep for vent in a couple weeks 
Entry  Wed Apr 27 18:14:48 2011, kiwamu, Update, LSC, preparation for DRMI locking : RF status RF_Work_Status.png
Entry  Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off ventd3.jpg
    Reply  Wed May 2 10:03:58 2018, Steve, HowTo, SEI, preparation of load cell measurement at ETMX 6x
    Reply  Thu May 3 09:56:42 2018, Steve, HowTo, SEI, preparation of load cell measurement at ETMX 
    Reply  Mon May 14 08:55:40 2018, Dennis Coyne, HowTo, SEI, preparation of load cell measurement at ETMX 
Entry  Tue Aug 2 02:35:23 2011, kiwamu, Update, General, preparation of the vent : status and plan 
    Reply  Sun Jul 31 22:48:35 2011, kiwamu, Summary, General, preparation of the vent : status update 
Entry  Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent pztsteering.pngvac1Aug2011.pngPEM200d.jpg
Entry  Wed Apr 7 09:00:01 2010, steve, HowTo, PEM, prepare to open chamber 0.5micron.jpg
Entry  Fri Nov 18 16:37:14 2011, steve, Update, VAC, preparing for ac power interruption planednopower.png
Entry  Mon Sep 8 08:24:49 2014, Steve, Update, Computer Scripts / Programs, preparing vac system to reboot 
    Reply  Mon Sep 8 11:10:26 2014, ericq, Update, Computer Scripts / Programs, preparing vac system to reboot 
    Reply  Mon Sep 8 11:34:47 2014, rana, Update, Computer Scripts / Programs, preparing vac system to reboot 
    Reply  Mon Sep 8 12:11:36 2014, manasa, Update, Computer Scripts / Programs, preparing vac system to reboot 
    Reply  Tue Sep 9 14:18:40 2014, Steve, Update, Computer Scripts / Programs, preparing vac system to reboot v1closedfor1h.png
Entry  Tue Jun 30 11:33:00 2015, Jamie, Summary, CDS, prepping for CDS upgrade 
Entry  Mon Apr 25 22:38:49 2011, kiwamu, Update, LSC, prepration for DRMI : Y arm flashing 
    Reply  Fri Oct 12 17:37:03 2018, Steve, Update, VAC, pressure gauge choices  
Entry  Fri Jul 22 10:24:34 2011, steve, Update, VAC, pressure plot at day 213 p.jpg
    Reply  Mon Oct 31 08:55:19 2011, steve, Update, VAC, pressure plot at day 53 pd71-m-d53.png
Entry  Thu Aug 10 14:14:17 2017, Kira, Update, PEM, previously built temp sensor IMG_20170810_112315.jpg
Entry  Mon Nov 14 21:22:48 2011, rana, Configuration, Computers, primetime RSYNC slowing down NODUS 
Entry  Thu Nov 4 17:53:29 2010, yuta, Update, CDS, primitive python script for A2L measurement a2ltest.png
Entry  Wed Aug 24 11:40:21 2011, jamie, jenne, kiwamu, suresh, steve, Update, SUS, problem with ITMX 
Entry  Thu Dec 20 12:14:19 2012, Jamie, Update, General, problem with in-vac wiring for TTs 
    Reply  Tue Sep 4 20:20:47 2012, jamie, Update, General, problematic tip-tilts 
Entry  Mon Sep 28 17:39:34 2009, rob, Update, PSL, problems problems.pngproblems2.png
Entry  Tue May 29 00:53:57 2012, Den, Update, CDS, problems 
Entry  Sun Apr 26 00:56:21 2015, rana, Summary, Computer Scripts / Programs, problems with new restart procedures for elogd and apache 
    Reply  Fri May 1 20:33:31 2015, rana, Summary, Computer Scripts / Programs, problems with new restart procedures for elogd and apache 
Entry  Tue Jul 12 13:59:12 2022, rana, Summary, Computers, process monitoring: Monit 
    Reply  Tue Mar 3 11:38:11 2015, Steve, Update, safety, professional crane inspection 450lbs2015.jpg
    Reply  Wed Mar 2 10:09:28 2016, Steve, Update, safety, professional crane inspection 
Entry  Tue Jul 22 16:50:09 2008, steve, Metaphysics, Environment, professorial clean up of work bench ranaclup.pngcleanup2.png
Entry  Fri Feb 8 23:22:48 2013, Den, Summary, Modern Control, progress report LQG.pdf
Entry  Wed Oct 31 17:11:40 2012, jamie, Update, Alignment, progress, then setback 
ELOG V3.1.3-