Entry  Tue Jun 26 20:59:36 2018, aaron, Update, OMC, prep for vent in a couple weeks 
I checked out the elog from the vent in October 2016 when the OMC was removed from the path. In the vent in a couple weeks, we'd like to get the
beam going through the OMC again. I wasn't really there for this last vent and don't have a great sense for how things go at the 40m, but this
is how I think the procedure for this work should approximately go. The main points are that we'll need to slightly translate and rotate OM5, rotate
Entry  Wed Apr 27 18:14:48 2011, kiwamu, Update, LSC, preparation for DRMI locking : RF status RF_Work_Status.png

POX11 (see this entry) is now listed as REFL11 (on the very top row).
Entry  Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off ventd3.jpg
There is a planned power outage tomorrow, Saturday from 7am till midnight.
I vented all annulies and switched to ALL OFF configuration. The small region of the RGA is still under vacuum.
The vac-rack: gauges, c1vac1 and UPS turned off.
    Reply  Wed May 2 10:03:58 2018, Steve, HowTo, SEI, preparation of load cell measurement at ETMX 6x
Gautam and Steve,

We have calibrated the load  cells. The support beams height monitoring is almost ready.

The danger of this measurment that  the beams height changes can put shear
    Reply  Thu May 3 09:56:42 2018, Steve, HowTo, SEI, preparation of load cell measurement at ETMX 
[ Dennis Coyne'  precision answer ]



Differential Height between Isolators
    Reply  Mon May 14 08:55:40 2018, Dennis Coyne, HowTo, SEI, preparation of load cell measurement at ETMX 
follow up email from Dennis 5-13-2018.
The last line agrees with the numbers in elog13821.


Hi Steve & Gautam,
Entry  Tue Aug 2 02:35:23 2011, kiwamu, Update, General, preparation of the vent : status and plan 
The vent will take place on Wednesday.
Plan for Tuesday :
  (Morning) Preparation of necessary items for the low power MC (Steve / Jamie)
    Reply  Sun Jul 31 22:48:35 2011, kiwamu, Summary, General, preparation of the vent : status update 
Status update for the vent preparation:
The punchline is : We can not open the chamber on Monday ! 
 
Entry  Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent pztsteering.pngvac1Aug2011.pngPEM200d.jpg
Both arms locked easely around 1V transmited.  We should recenter oplevs.
Entry  Wed Apr 7 09:00:01 2010, steve, HowTo, PEM, prepare to open chamber 0.5micron.jpg
In order to minimize the diffusion of more dust particles into the vented IFO vacuum envelope
BEFORE opening chamber:
-Have a  known plan,
Entry  Fri Nov 18 16:37:14 2011, steve, Update, VAC, preparing for ac power interruption planednopower.png
The vacuum is ready for no AC power for 1 hr on Sunday morning at 10am
 
I did the follwing:
Entry  Mon Sep 8 08:24:49 2014, Steve, Update, Computer Scripts / Programs, preparing vac system to reboot 
Q and Steve will follow elog 10028 entry to prepare the vacuum system for safe reboot
    Reply  Mon Sep 8 11:10:26 2014, ericq, Update, Computer Scripts / Programs, preparing vac system to reboot 


    
        
            Quote:
        
        
            

           Q and Steve will follow elog 10028 entry to prepare the vacuum system for safe
    Reply  Mon Sep 8 11:34:47 2014, rana, Update, Computer Scripts / Programs, preparing vac system to reboot 
FYI: in that rack, the +15V pulls ~0.5 A more than -15V usually. I think this is due to some RF amplifiers which are powered by this (e.g. the AOM that
Manasa set up). The Sorensen's can source ~30A in principle, so we should make sure to set the current limit appropriately so as to not overheat them when
there is a short.
    Reply  Mon Sep 8 12:11:36 2014, manasa, Update, Computer Scripts / Programs, preparing vac system to reboot 


    
        
            Quote:
        
        
            

           FYI: in that rack, the +15V pulls ~0.5 A more than -15V usually. I think this is due to some RF amplifiers which are powered by this (e.g.
    Reply  Tue Sep 9 14:18:40 2014, Steve, Update, Computer Scripts / Programs, preparing vac system to reboot v1closedfor1h.png


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Tue Jun 30 11:33:00 2015, Jamie, Summary, CDS, prepping for CDS upgrade 
This is going to be a big one.  We're at version 2.5 and we're going to go to 2.9.3.


elog for last upgrade to RCG 2.5 (6540)
DAQ
setup/install (T1500227)
RCG 2.6 release notes (awiki)
RCG
Entry  Mon Apr 25 22:38:49 2011, kiwamu, Update, LSC, prepration for DRMI : Y arm flashing 
This week is going to be a recycled Michelson week.
As
a preparation I did several things today :
 1. Alignment of the Y arm
 2. Alignment of PRM
 3. Checking
of all the pick-off ports
 
    Reply  Fri Oct 12 17:37:03 2018, Steve, Update, VAC, pressure gauge choices  
We want to measure the pressure gradient in the 40m IFO

Our old MKS cold cathodes are out of order. The existing working gauge at the pumpspool
is InstruTech CCM501
Entry  Fri Jul 22 10:24:34 2011, steve, Update, VAC, pressure plot at day 213 p.jpg
Dec 21, 2010 we pumped down the MARK4 rebuilt 40m-IFO and the malev has been pumping on it since than
    Reply  Mon Oct 31 08:55:19 2011, steve, Update, VAC, pressure plot at day 53 pd71-m-d53.png


    
        
            Quote:
        
        
            
            I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply
Entry  Thu Aug 10 14:14:17 2017, Kira, Update, PEM, previously built temp sensor IMG_20170810_112315.jpg
I decided to see what was inside the sensor that had been previously made. According to elog 1102, the temperature sensor is LM34, the specs of which
can be found here:

http://www.ti.com/lit/ds/symlink/lm34.pdf
Entry  Mon Nov 14 21:22:48 2011, rana, Configuration, Computers, primetime RSYNC slowing down NODUS 
nodus:elog>w; who ; date
  9:20pm  up 44 day(s),  5:14,  5 users,  load average: 0.29, 1.04, 1.35
User     tty           login@  idle   JCPU   PCPU 
Entry  Thu Nov 4 17:53:29 2010, yuta, Update, CDS, primitive python script for A2L measurement a2ltest.png
Summary:
  I wrote a python script for A2L measurement.
 Currently it is really primitive, but I tested the basic functionality of the script.
Entry  Wed Aug 24 11:40:21 2011, jamie, jenne, kiwamu, suresh, steve, Update, SUS, problem with ITMX 
ITMX was drag wiped, and the suspension was put back into place.  However, after removing all of the earthquake stops we found that the suspension
was hanging in a very strange way.
The optic appears to heavily pitched forward in the suspension.  All of the rear face magnets are high in their OSEMs, while the SIDE OSEM
Entry  Thu Dec 20 12:14:19 2012, Jamie, Update, General, problem with in-vac wiring for TTs 
Nic and I discovered a problem with the in-vac wiring from the feed-thru to the top of the table.  Pin 13 at the top of the stack, which is one
of the coil pins on the tip-tilt quadrapus cables, is *the* shield braid on the cable that goes to the feed-thru.  This effectively shorts one of
our coil signals.
    Reply  Tue Sep 4 20:20:47 2012, jamie, Update, General, problematic tip-tilts 


    
        
            Quote:
        
        
            

           We clearly need a better plan for adjusting the tip tilts in pitch, because utilizing their hysteresis
Entry  Mon Sep 28 17:39:34 2009, rob, Update, PSL, problems problems.pngproblems2.png
The PSL/IOO combo has not been behaving responsibly recently. 
The first attachment is a 15 day trend of the MZ REFL, ISS INMON, and MC REFL power.  These show two separate problems--recurring MZ flakiness,
which may actually be a loose cable somewhere which makes the servo disengage.  Such disengagement is not as obvious with the MZ as it is with other
Entry  Tue May 29 00:53:57 2012, Den, Update, CDS, problems 
I've noticed several CDS problems:

    Communication sign on C1SUS model turns to red once in a while. I press diag reset and it is gone. But after some time comes back.

   On C1LSC machine red "U" lamp shines with a period ~5 sec.
    I was not able to read data from the SR785 using netgpibdata.py.
Entry  Sun Apr 26 00:56:21 2015, rana, Summary, Computer Scripts / Programs, problems with new restart procedures for elogd and apache 
Since the nodus upgrade, Eric/Diego changed the old csh restart procedures to be more UNIX standard. The instructions are in the wiki.

After doing some software updates on nodus today, apache and elogd didn't come back OK. Maybe because of some race condition, elog tried
to start but didn't get apache. Apache couldn't start because it found that someone was already binding the ELOGD port. So I killed ELOGD several
    Reply  Fri May 1 20:33:31 2015, rana, Summary, Computer Scripts / Programs, problems with new restart procedures for elogd and apache 
Same thing again today. So I renamed the /etc/init/elog.conf so that it doesn't keep respawning bootlessly. Until then restart elog using the start script in /cvs/cds/caltech/elog/
as usual.
Entry  Tue Jul 12 13:59:12 2022, rana, Summary, Computers, process monitoring: Monit 
I've installed Monit on megatron and nodus just now, and will set it up to monitor some of our common processes.
I'm hoping that it can give us a nice web view of what's running where in the Martian network.
    Reply  Tue Mar 3 11:38:11 2015, Steve, Update, safety, professional crane inspection 450lbs2015.jpg
 




Quote:



Safety glasses were measured
    Reply  Wed Mar 2 10:09:28 2016, Steve, Update, safety, professional crane inspection 
The crane inspection is scheduled for this coming Friday from 8-12

 
Entry  Tue Jul 22 16:50:09 2008, steve, Metaphysics, Environment, professorial clean up of work bench ranaclup.pngcleanup2.png
Atm1: is showing the spiritual satisfaction after work bench clean up by the professor himself.

Atm2: some items are still waiting to be placed back to their location 
Entry  Fri Feb 8 23:22:48 2013, Den, Summary, Modern Control, progress report LQG.pdf
 I wrote a small document on the application of LQG method to a Fabry-Perot cavity control.
Entry  Wed Oct 31 17:11:40 2012, jamie, Update, Alignment, progress, then setback 
jamie, nic, jenne, den, raji, manasa
We were doing pretty well with alignment, until I apparently fucked things up.
We were approaching the arm alignment on two fronts, looking for retro-reflection from both the ITMs and the ETMs.
    Reply  Wed Oct 31 17:18:34 2012, Jenne, Update, Alignment, progress, then setback - trend of BS table shift PRM_BS_table_bumped_ITMY_MC1_no_big_change_2hoursBack.png
Here is a two hour set of second trends of 2 sensors per mirror, for BS, PRM, ITMY and MC1.  You can see about an hour ago there was a big change
in the BS and PRM suspensions, but not in the ITMY and MC1 suspensions.  This corresponds as best we can tell with the time that Jamie was figuring
out and then fixing PZT2's mount.  You can see that the table takes some time to relax back to it's original position.  Also, interestingly,
    Reply  Wed Oct 31 17:36:39 2012, jamie, Update, Alignment, progress, then setback - trend of BS table shift 


    
        
            Quote:
        
        
            

           Here is a two hour set of second trends of 2 sensors per mirror, for BS, PRM, ITMY and MC1.  You can see about an hour ago there was
    Reply  Thu Nov 1 01:51:37 2012, rana, Update, Alignment, progress, then setback - trend of BS table shift 
  But these jumps in the OSEMs are all at the level of 10-20 microns. Seems like that wouldn't be enough to account for anything; 20 microns
/ (pend length) ~ 50-60 microradians.
    Reply  Thu Nov 1 08:48:42 2012, steve, Update, Alignment, progress, then setback - trend of BS table shift alignmentstrugle2d.pngalignmentstrugle2da.pngbefpd09252012.png


    
        
            Quote:
        
        
            

             But these jumps in the OSEMs are all at the level of 10-20 microns. Seems like that wouldn't be enough to account for anything;
    Reply  Thu Nov 1 10:58:49 2012, jamie, Update, Alignment, progress, then setback - trend of BS table shift foo.png
Here's a plot of the BS, PRM, and MC1 suspension shadow sensor trends over the last 24 hours.  I tried to put everything on the same Y scale:

There definitely was some shift in the BS table that is visible in the BS and PRM that seems to be settling back now.  The MC1 is there for
    Reply  Mon Dec 10 16:28:13 2012, jamie, Omnistructure, Computers, progressive retrieval of online data now possible with the new NDS2 client 
Leo fixed an issue with the new nds2-client packages that was preventing it from retrieving online data.  It's working now from matlab, python,
and octave.
Here's an example of a dataviewer-like script in python:
Entry  Fri May 8 15:40:44 2009, pete, Update, Locking, progressively weaker locks powers_3lock.pdf
the align script was run after the third lock here.  it would have been interesting to see the arm powers in a 4th lock 
    Reply  Mon Mar 12 13:58:37 2018, gautam, Update, General, projector light bulb blown 
Bulb went out ~10am today. Looks like the lifetime of this bulb was <100 days.

Steve: bulb is arriving next week




Quote:


    Reply  Tue Aug 15 08:22:16 2017, Steve, Update, General, projector light bulb replaced 
BL-FS300C-PH-LE was replaced after 2,904 hrs  It did not explode this time.  The
4 monts life period is actually pritty good because this is a $73.  cheap bulb. The best-high priced warranty is 5 months.

 
    Reply  Wed Jan 3 15:13:55 2018, Steve, Update, General, projector light bulb replaced 
Bulb  is replaced.




Quote:



I noticed this behaviour since ~Dec 20th, before the power failure. The bulb itself seems to work fine, but the
    Reply  Wed Mar 21 10:00:35 2018, steve, Update, General, projector light bulb replaced 
Light bulb replaced.




Quote:



Bulb went out ~10am today. Looks like the lifetime of this bulb was <100 days.
    Reply  Tue Jul 10 14:20:09 2018, steve, Update, General, projector light bulb replaced 
Bulb replaced at day 110  We have now spare now.

 
    Reply  Mon Nov 26 10:22:16 2018, aaron, Update, General, projector light bulb replaced 
I replaced the projector bulb. Previous bulb was shattered.