  11757   Thu Nov 12 10:22:33 2015 SteveUpdatePEMpossible vibration for 4days Building:        
San Pasqual walkway East to West

                 
  
  13310   Mon Sep 11 23:31:50 2017 johannesUpdateCameraspost-vent camera capture comparisonThe latest pre-unintended vent captures
of the test mass face cameras were taken
on June
 13x 
  13334   Tue Sep 26 22:11:08 2017 johannesUpdateCameraspost-vent camera capture comparisonI configured the remaining GigE-Camera
to work on the 40m network. We currently
have 3 operational Basler cameras:
 lens_distance.pdfImage__2017-09-26__18-54-29.jpgIMG_20170926_190157222_HDR.jpgIMG_20170926_185649325.jpg 
  15550   Sun Aug 30 11:29:33 2020 ranaUpdateGeneralpower blink?My power at home winked out for a second
this morning, but it looks like either nothing
happened in the 40m lab or else it rode it
  
  4448   Mon Mar 28 16:24:35 2011 kiwamuUpdateGreen Lockingpower budget on PSL table   I measured some laser powers
associated with the beat-note detection system
 RFPD.png 
  6355   Mon Mar 5 14:10:35 2012 kiwamuUpdateLSCpower budget on the AP tableI
checked the laser powers on the AP table
and confirmed that their powers are low enough
 power_budget.png 
  12593   Thu Nov 3 08:07:52 2016 SteveUpdateGeneralpower glitchBuilding:        
Campus Wide         

       
 powerGlitch.png 
  12696   Mon Jan 9 09:18:47 2017 SteveUpdatePEMpower glitchThere was a power glitch last night around
1:15am

The vacuum was not effected.
 MondayMorning.png 
  12700   Tue Jan 10 21:47:00 2017 ranaUpdateCDSpower glitchDoes "done" mean they are OK
or they are somehow damaged? Do
you mean the workstations or the front end
  
  12594   Thu Nov 3 11:33:24 2016 gautamUpdateGeneralpower glitch - recoveryI did the following:


Hard reboots for fb, megatron,
and all the frontends, in that order
Checked
  
  12702   Wed Jan 11 16:35:03 2017 gautamUpdateCDSpower glitch - recovery progress[lydia, ericq, gautam]

We set about following the instructions
linked in the previous elog. A few notes/remarks:
 powerGlitchRecoveryJan2017.png 
  12701   Tue Jan 10 22:55:43 2017 gautamUpdateCDSpower glitch - recovery stepsHere
is a link to an elog with the steps I had
to follow the last time there was a similar
  
  12699   Tue Jan 10 16:20:11 2017 SteveUpdateCDSpower glitch......Raid is rebuildingJamie started the fm40m Raid rebuilding.
It has been beeping since the power outage.

Summary pages have no reading since
 rebuilding_in_progress.png 
  5270   Fri Aug 19 15:31:53 2011 steveUpdateGeneralpower interruption rescheduled to 10-1-2011       
       
UTILITY
  
  12808   Tue Feb 7 16:23:49 2017 SteveUpdateGeneralpower interruption tomorrow                                                                                                                                  
received this note: at 4:11pm Tuesday, Feb
7, 2017
  
  3924   Mon Nov 15 15:02:00 2010 KojiSummaryPSLpower measurements around the PMC[Valera Yuta Kiwamu Koji]
Kiwamu burtrestored c1psl.  We measured
the power levels around the PMC.
  
  6156   Fri Dec 30 22:05:16 2011 kiwamuUpdateLSCpower normalization in LSCNow a power
normalization is doable for the LSC error
 POW_NORM_MTRX.png 
  6158   Tue Jan 3 15:48:39 2012 kiwamuUpdateLSCpower normalization in LSCIt
turned out that the power normalization need
a modification.
  
  6170   Wed Jan 4 16:22:30 2012 kiwamuUpdateLSCpower normalization in LSC : modification doneThe
dynamic power normalization system has been
modified such that the normalization happen
 pow_norm.png 
  4011   Sun Dec 5 22:28:39 2010 ranaSummaryall down cond.power outageLooks like there was a power outage.
The control room workstations
were all off (except for op440m). Rosalba
  
  4012   Mon Dec 6 11:53:20 2010 josephb, kiwamuSummaryall down cond.power outageThe monitors for allegra and rossa's seemed
to be in a weird state after the power outage. 
I turned allegra and rossa on, but didn't
  
  4013   Mon Dec 6 11:57:21 2010 KojiSummaryall down cond.power outageI checked the vacuum system and judged
there is no apparent issue.
The chambers and annulus had been
  
  7476   Thu Oct 4 08:39:58 2012 SteveUpdateGeneralpower outage There had to be a power outage. Laser
and air condition turned back on. The vacuum
 Oct4R2012.png 
  13492   Tue Dec 26 17:24:24 2017 SteveUpdateGeneralpower outageThere was a power outage.

The IFO pressure is 12.8 mTorr-it
and it is not pumped. V1 is still closed.
 powerOutage.png 
  13755   Mon Apr 16 22:09:53 2018 KevinUpdateGeneralpower outage - BLRM recoveryI've been looking into recovering the
seismic BLRMs for the BS Trillium seismometer.
It looks like the problem is probably
 AA.jpgADC.jpg 
  13493   Thu Dec 28 17:22:02 2017 gautamUpdateGeneralpower outage - CDS recovery
I had to manually reboot c1lsc,
c1sus and c1ioo.
I edited the
line in /etc/rt.sh (specifically, on FB /diskless/root.jessie/etc/rt.sh)
 28.png 
  13510   Sat Jan 6 18:27:37 2018 gautamUpdateGeneralpower outage - IFO recoveryMostly back to nominal operating conditions
now.


EX TransMon QPD is not
 EX_QPD_Quad1_Faulty.pdfTrillium_faulty.pdf 
  13503   Thu Jan 4 14:39:50 2018 gautamUpdateGeneralpower outage - timing errorAs mentioned in my previous elog, the CDS
overview screen "DC" indicators
are all RED (everything else is green). Opening
  
  13506   Fri Jan 5 21:54:28 2018 ranaUpdateGeneralpower outage - timing errorRolf came here in the morning, but not
sure what he did or if Jamie remotely did
something. But the screen is green.
 huh.png 
  13507   Fri Jan 5 22:19:53 2018 gautamUpdateGeneralpower outage - timing errorJust putting the relevant line from email
from Rolf which at least identifies the problem
here:
  
  3163   Wed Jul 7 00:15:29 2010 tara,RanaSummaryPSLpower spectral density from RefCav transmitted beam I measured
the RC transmitted light signals here at
the 40m. I made all connections through
 RIN_rftrans.pngtara.png 
  3164   Wed Jul 7 10:42:29 2010 KojiSummaryPSLpower spectral density from RefCav transmitted beam How do you calibrate this to Hz/rtHz?

  
  9506   Fri Dec 20 20:04:01 2013 SteveUpdateVACpower supply replaced with a short vent

    

       
            
 4hrPumpdown.pngpumpdownAfterHickup.pngPSpumpdown.png 
  9508   Fri Dec 20 23:00:41 2013 KojiUpdateVACpower supply replaced with a short ventI'm leaving the 40m now. IFO is aligned. Everything
look good.
  
  9516   Fri Jan 3 11:18:41 2014 SteveSummaryVACpower supply replaced with a short vent

    

       
            
 rebootVENT.png 
  9510   Sat Dec 21 10:53:35 2013 SteveUpdateVACpower supply replaced with a short vent-pumpdown completedThe recovery- pumpdown reached valve configuration 
vacuum normal at 20 hours, cc1 7.7e-6 Torr
 20hrsVacNormal.png 
  6860   Sat Jun 23 18:44:15 2012 steveUpdateGeneralpower surge has no effect on the labI was notified by CIT Utilities that there
was a power surge or short power outage this
after noon.
  
  7088   Mon Aug 6 09:46:31 2012 steveUpdateIOOpoweroutage turns laser off
. Power
  
  7800   Sat Dec 8 04:12:38 2012 DenUpdateLSCprcl Today I wanted to check that AS and
REFL beams are real and contain proper information
about interferometer. For this I locked YARM
 IMG_0118.JPG 
  8446   Fri Apr 12 02:56:34 2013 DenUpdateLockingprcl angular motionI compared PCRL and XARM angular motions
by misaligning the cavities and measuring
power RIN. Divergence angles for both cavities
 pointing.pngoplev_exc.pdf 
  8447   Fri Apr 12 09:20:32 2013 ranaUpdateLockingprcl angular motion How
is the cavity g-factor accounted for in this
  
  8449   Fri Apr 12 13:21:34 2013 DenUpdateLockingprcl angular motion

    

       
            
  
  8450   Sat Apr 13 03:45:51 2013 ranaUpdateLockingprcl angular motion 
 Maybe its equivalent, but I
would have assumed that the input beam is
  
  8451   Sat Apr 13 23:11:04 2013 DenUpdateLockingprcl angular motion

    

       
            
 pointing.pdf 
  8454   Sun Apr 14 17:56:03 2013 ranaUpdateLockingprcl angular motion

    

       
            
  
  8564   Mon May 13 18:44:04 2013 JenneUpdateLockingprcl angular motionI want to redo this estimate of where RIN
comes from, since Den did this measurement
before I put the lens in front of the POP
 TT_Q_measurements.pdf 
  14437   Wed Feb 6 10:07:23 2019 ChubUpdate pre-construction inspectionThe Central Plant building will be undergoing
seismic upgrades in the near future. 
The adjoining north wall along the Y arm
  
  5591   Fri Sep 30 19:12:56 2011 KojiUpdateGeneralprep for poweroutage 
 [Koji Jenne]
The lasers were shutdown
  
  13383   Tue Oct 17 17:53:25 2017 jamieSummaryLSCprep for tests of Gabriele's neural network cavity length reconstructionI've been preparing for testing Gabriele's
deep
neural network MICH/PRCL reconstruction.
 c1dnn.png 
  13390   Wed Oct 18 12:14:08 2017 jamieSummaryLSCprep for tests of Gabriele's neural network cavity length reconstruction


  
ELOG V3.1.3-