Thu Jan 22 08:34:10 2009, steve, Bureaucracy, SAFETY, safety training
|
Kakeru received 40m safety training yesterday.
He has no authorization to work alone in the high power beam path yet. |
Thu Feb 5 09:12:29 2009, steve, Bureaucracy, SAFETY, safety updates & fire alarm test
|
The fire alarm test was completed at 13:30 yesterday.
I updated the 40M Emergency Calling List by replacing Rob by Yoichy. The calling order: Vass, Aso and Taylor. |
Tue Feb 10 10:48:48 2009, steve, Bureaucracy, SAFETY, safety glasses scanned 
|
All 40m safety glasses are absorbent.
They were scanned by 180 mW 2mm spot size of 1064 nm beam and
their transmissions were measured
They showed no degradation.
UVEX 's LOTG-YAG/CO2 glasses (fits
over personal glasses) 11 pieces,
Glendale-XC by Bacou-Dalloz, #1166218VLT68% , aerodynamic style, 7 pieces, (4 missing )
KG5- |
Wed Feb 18 15:31:38 2009, steve, Bureaucracy, SAFETY, emergency back-up lights checked
|
All 13 exit and emergency back-up lights and their batteries were checked.
Two of the batteries were replaced. |
Mon Feb 23 11:07:01 2009, steve, Bureaucracy, SAFETY, Kiwamu receives safety training
|
Osamu and Kiwamu received 40m safety training on Thursday, Feb 19, 2009
Kiwamu needs Osamu's close supervision at PSL enclosure and AP table
I hope they already read, understood and signed the laser SOP |
Wed Jun 24 17:08:16 2009, steve, Bureaucracy, SAFETY, surf student safety
|
The 40m lab specific safety training is done. The participants were
Stephanie Erickson, Clara Bennett, Chris Zimmerman, Zach Commings, Michelle Stephen surfs and Drew Cappel postock.
They have already went through the Caltech Safety Office laser and general safety training. |
Wed Jul 29 11:15:06 2009, steve, Bureaucracy, SAFETY, Kevin receives safety training
|
Kevin Vigue, our high school summer student went through the 40m specific safety traning yesterday. |
Wed Sep 9 10:13:31 2009, steve, Bureaucracy, General, the use of FAX machine, scanner & toaster
|
You said that the use of FAXST was forbidden for phds and graduate students. I had to swear on the promise of not ever buying an other FAXST |
Wed Jan 6 16:48:52 2010, steve, Bureaucracy, SAFETY, copied NPRO key
|
We lost our key to the Lightwave 125/6-OPN-PS The key shop just made one look a like that works. |
Mon Mar 1 08:49:37 2010, steve, Bureaucracy, SAFETY, safety audit
|
The 40m safety audit will be at Wednesday afternoon, March 3
Please participate getting our lab to inspection grade safety level. |
Tue Apr 20 10:55:10 2010, steve, Bureaucracy, SAFETY, Kevin Kuns received safety training
|
The 40m's new undergrad Kevin Kuns was introduced to 40m safety hazards. He is new and needs guidance as specially with 2W laser work.
Peter King will train him on Friday to LIGO-laser standard.
|
Wed Jul 14 20:15:04 2010, Dmass, Bureaucracy, Cameras, IR Olympus
|
I borrowed the Olympus and forgot to leave a note - I should have it for at most a day. dmassey@ligo if you need it urgently |
Mon Sep 20 10:33:21 2010, josephb, Bureaucracy, Computers, Larry stopped by - GC machine had conflicting IP
|
Larry stopped by today and had to disconnect the m25 machine (this is the 1st GC machine on the left as you walk into the control room) because its IP
was conflicting with a machine over in Downs. Do not use 131.215.115.125 as the IP on this machine as this is already assigned to someone else.
They couldn't figure out the root password to change it which is why it is not currently plugged into the network, and is not to be until an appropriate |
Fri Oct 1 16:46:20 2010, steve, Bureaucracy, SAFETY, Yuta received 40m-101-safety training
|
Our visiting graduate student Yuta Michimura received 40m specific basic safety training today. |
Thu Oct 7 08:39:39 2010, steve, Bureaucracy, SAFETY, Joonho receives safety training
|
Our new undergrad Joonho Lee received 40m specific basic safety training yesterday.
Yuta and Joonho are scheduled to participate in the LIGO-laser safety tutelage with Peter K on Oct 12 |
Tue Oct 12 15:51:18 2010, yuta, Bureaucracy, SAFETY, the 40m squad received safety training from Peter
|
Yuta, Joonho, and Suresh received the Basic Laser Safety Training from Peter King today.
Now, we got homework. |
Mon Nov 1 10:28:41 2010, steve, Bureaucracy, SAFETY, Suresh received 40m safety training
|
Our new postdoc Suresh Doravari received 40m specific safety training last week. |
Thu Nov 11 11:08:26 2010, steve, Bureaucracy, PEM, AP table found open
|
Please remember to cover the optical tables ! |
Mon Apr 25 11:23:41 2011, Alastair, Bureaucracy, Computers, wiki?
|
40m wiki seems to have been down for quite a while now but I can't see any info in the elog about it. Is there some ongoing problem?
|
Mon Apr 25 11:58:37 2011, Jamie, Bureaucracy, Computers, wiki?
|
Quote:
40m wiki seems to have been down for quite a while now but I can't see any info in the elog about it. Is there |
Mon Apr 25 12:55:19 2011, Jenne, Bureaucracy, Computers, wiki?
|
Quote:
|
Mon Apr 25 12:55:35 2011, Alastair, Bureaucracy, Computers, wiki?
|
Quote:
|
Mon May 9 16:58:23 2011, Jamie, Bureaucracy, CDS, !!!!REMEMBER TO COMMIT YOUR MODIFICATIONS!!!!
|
Whenever you modify any of the front-end code in /opt/rtds/caltech/c1/userapps, such as models, scripts or medm screens, REMEMBER TO COMMIT YOUR
CHANGES, WITH A LOG MESSAGE!!!
cd /opt/rtcds/caltech/c1/userapps/trunk
svn commit path/to/modified/file
If you forget to commit things, |
Mon May 9 17:21:13 2011, Jamie, Bureaucracy, CDS, !!!!REMEMBER TO COMMIT YOUR MODIFICATIONS!!!!
|
Also, remember to update the svn working copy before you begin doing any work, to make sure you're working on the most recent version:
cd /opt/rtcds/caltech/c1/userapps/trunk
svn update
|
Tue Jun 28 11:25:56 2011, Alastair, Bureaucracy, Computers, restarted elog
|
The manual instructions on the 40m wiki for restarting wouldn't work. I killed the process okay, but then I got an error saying it "couldn't
bind to port 8080, please try again using -p to select port". The automated script worked though. |
Sun Sep 18 16:42:00 2011, Koji, Bureaucracy, Environment, Clean up your mess
|
Mess in the lab is increasing. Kiwamu and I had to clean up some stuffs to continue our work.
(i.e. some components were disturbing to open the lid of the tables.)
Basically the tools/equipments/component/cables/digital cameras/lens caps/IR viewers |
Tue Oct 25 21:23:17 2011, Dmass, Bureaucracy, elog, Elog Restarted
|
Elog went nonreponsive. SSH'ed into nodus to run restart script. Elog came back ~15 minutes later. |
Tue Jan 24 13:36:05 2012, Zach, Bureaucracy, General, If I'm Peter Pan...
|
JA - MIE - RO! |
Wed Jan 25 15:04:41 2012, Jenne, Bureaucracy, SAFETY, 40m SOS supplies moved off of cleanroom flow bench
|
Bob, Callum and Daphen noted that our keeping a JDSU HeNe (max power <4mW) is against somebody's SOP. So I cleared everything that relates to
40m SOS suspending to the bottom shelf of the 2nd cabinet in the cleanroom (the back set of cabinets nearest the flow benches). The door has a nifty
label. Things that are in there include: |
Wed Apr 11 16:33:16 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items
|
Action Items from Last Week:
(non-existant)
----------------------------------------------------------------------- |
Thu May 3 13:07:05 2012, Koji, Bureaucracy, General, Interferometer check-up session
|
From 2PM, Jenne/Den/Koji. Finished at 10:30PM
General
More LCD screens! Wider screens!
Allegra - only can handle single
head right now, but should prepare for the eventual upgrade of that videocard/whole computer and get 2 monitors.
Every workstation |
Thu May 3 13:35:56 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items
|
Action Items:
IFO:
Arm cavity sweeps, mode scan - JENNE |
Wed May 9 15:50:13 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items
|
I'm combining the IFO check-up list (elog 6595) and last week's action items list (elog
6597). I thought about making it a wiki page, but this way everyone has to at least scroll past the list ~1/week.
Feel free to cross things out as you complete them, but don't delete them. Also, if there's |
Wed May 23 13:57:11 2012, Jenne, Bureaucracy, General, 40m Meeting Action Items
|
PRIORITY ITEMS:
Align Ygreen beam - JENNE, YUTA
|
Wed May 23 20:41:37 2012, Suresh, Bureaucracy, General, 40m Meeting Action Items: Tip-tilts : cabling and electronics
|
Quote:
..........
Tip Tilts
Prepare electronics for TTs (coil drivers) |
Wed May 30 22:04:13 2012, Jenne, Bureaucracy, General, 40m Action Items
|
.....including:
fix Q of Vio2 filter in SUS. - JENNE
Switch power source for beatnote PD's amplifiers from temporary power supplies under PSL table to permanent taking the power from a rack. |
Thu Jun 21 02:57:16 2012, Jenne, Bureaucracy, General, 40m Action Items
|
PRIORITY ITEMS:
ASS doesn't run on Ubuntu! |
Thu Jun 28 20:59:28 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW!
|
Koji, Jamie and I talked together and I decided to VENT TOMORROW MORNING.
Main purpose of this vent is to see if PRM is flipped or not.
|
Thu Jun 28 22:08:57 2012, Jenne, Bureaucracy, Locking, vent for PRC check, TOMORROW!
|
Quote:
Check List: |
Fri Jun 29 01:49:36 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW!
|
Quote:
What do you mean by PR2, PR3 flipping? They are (supposed to be) flat mirrors, so obviously they should be installed correctly, |
Wed Jul 4 20:13:46 2012, yuta, Bureaucracy, Locking, PRC commissioning plan
|
Issues in PRC:
1. Power recycling gain is too low (~ 15 instead of 40, according to Kiwamu).
2. Mode matching to both arms are ~90%(see #6859), but PRC has terrible mode. |
Fri Jul 13 15:49:38 2012, yuta, Bureaucracy, General, 40m Priority Action Items
|
These are all priority action items need to be done before I come back (in mid-September).
BE PREPARED FOR THE FULL LOCK!
|
Mon Feb 18 18:28:01 2013, yuta, Bureaucracy, Alignment, we are going to pump down
|
We will start preparing for pumping down. Main goal for this is to demonstrate PRFPMI using ALS.
Here are to-dos before we pump down.
|
Tue Feb 19 02:23:40 2013, yuta, Bureaucracy, General, action items for PRFPMI
|
These are things need to be done for demonstrating PRFPMI using ALS.
All of these should be done before March 8!
|
Mon Feb 25 22:30:40 2013, Jenne, Bureaucracy, General, action items for PRFPMI
|
CDS:
- Check out ASS and A2L working -JENNE |
Mon Mar 4 17:32:26 2013, yuta, Bureaucracy, General, flowchart for PRMI g-factor measurement
|
I made a very useful flowchart for the week. Our goal for the week is to measure g-factor of PRC in PRMI.
|
Fri Mar 8 16:05:56 2013, yuta, Bureaucracy, General, action items for PRMI / ALS-FPMI
|
We should focus our work both on PRMI and ALS-FPMI (elog #8250).
CDS: |
Fri Mar 15 16:46:52 2013, Jenne, Bureaucracy, Auxiliary locking, Yend table upgrade - fast track?
|
In light of the Yend auxiliary laser's ill health, I think we should reconsider the possibility of changing out the Yend laser table next week.
My thinking here is that if whatever the new mode matching solution is for a replacement laser (Tara has borrowed our spare NPRO that used to sit
on top of the fridge, or we could take Annalisa's) requires a rework of the table layout, we might as well put the new layout onto the new table. |
Mon Mar 18 12:23:25 2013, Jenne, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF
|
Zach has just replied, and said that we should feel free to take the laser
from his iodine setup in the West Bridge subbasement, in the ATF lab.
Annalisa, please ask Koji or Tara to show you where it is, and help you bring it to the 40m. |
Mon Mar 18 12:35:29 2013, Annalisa, Bureaucracy, Auxiliary locking, Yend table upgrade - go fetch NPRO from ATF
|
Quote:
Zach has just replied, and said that we should feel free to take |