    Reply  Mon Apr 22 17:43:09 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics more2.jpg


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Wed Jun 29 08:20:04 2016, Steve, Update, SUS, First Contact shelf life 

We'll follow LIGO policy:
Our policy is to use first contact within 1 year of purchase for use in the interferometers.
 For inspection use I am comfortable with out-of-date use.


GaryLinn offered their indate First Contact for use.

 
Entry  Fri Jun 6 16:47:04 2008, josephb, Configuration, Cameras, GC650 scatter images of 1064nm light GC650_scatter_200.pdfGC650_scatter_100a.pdfGC650_scatter_100b.pdf
Took images similar to the scattered light images from earlier, except with the CCD GC650 camera.  The first three attached plots are an average of all
200 images, an average of the first 100 and then an average of the last 100 images.
Entry  Fri Jul 12 09:00:10 2013, Steve, Update, General, Halogen illumination cables disconnected 1Y1oldilluminatersDisconnected.jpg
Alex and Steve,
Old halogen chamber illuminator cabling disconnected and potenciometer board removed at 1Y1 in order to give room for pd calibration fibre set
up.
    Reply  Fri Jul 12 12:30:47 2013, manasa, Update, General, Halogen illumination cables disconnected 


    
        
            Quote:
        
        
            

           Alex and Steve,
Entry  Wed Feb 10 16:27:47 2010, steve, Configuration, General, IFO beam heights 
IN VACUUM beam heights are ALL 5.5"  This is measured from the top of the optical table to the
center of all TMs, mirrors and other optical components. This beam is ~36" above the floor.
PSL (inside of enclosure) main-output  beam: PMC, MZ, RC and ISS  are at 3" heights.
    Reply  Mon Aug 25 09:56:21 2014, Steve, Update, IMC, IMC WFSs upgrade eq6Mnapa.png
 
 The Napa earth quake magnitude 6 did not have any effect on the suspensions.
 The Goy phase upgrade was done nicely. The IOO pointing did not change. Credit owned to Nick and Andres.
    Reply  Wed Oct 3 07:41:23 2012, Steve, Update, SUS, MC2 sus damping restored 
This is the third morning in a row that the MC2 was tripped.  Would you look at it Koji?
    Reply  Wed Oct 3 23:24:05 2012, Koji, Update, SUS, MC2 sus damping restored 


    
        
            Quote:
        
        
            

           This is the third morning in a row that the MC2 was tripped.  Would you look at it Koji?
    Reply  Sun Oct 7 15:05:42 2012, Den, Update, SUS, MC2 sus damping restored mc2.png


    
        
            Quote:
        
        
            

           This is the third morning in a row that the MC2 was tripped. 
Entry  Tue Oct 2 07:45:49 2012, Steve, Update, SUS, MC2 & PRM sus damping restored 
 
    Reply  Mon Aug 8 13:24:00 2011, steve, Metaphysics, Treasure, Monday morning P1080147.JPG


    
        
            Quote:
        
        
            

           Just a reminder that a film crew will be here Monday morning, filming Christian Ott for some Discovery channel show.
    Reply  Wed Oct 17 11:15:05 2012, Den, Update, SUS, PITCH damping needed pitch_damping.png


    
        
            Quote:
        
        
            

            
    Reply  Thu Oct 18 02:42:38 2012, Den, Update, SUS, PITCH damping needed 7x


    
        
            Quote:
        
        
            

            
    Reply  Fri Oct 19 18:30:07 2012, Den, Update, SUS, PITCH damping needed damp.pngpitch.png


    
        
            CQuote:
        
        
            

            
    Reply  Sat Oct 20 01:23:56 2012, Den, Update, SUS, PITCH damping needed P1010059.jpgP1010058.jpgP1010060.jpg


    
        
            Quote:
        
        
            

           Measurements confirm that damping using small actuation magnets reduces pitch Q by a factor of 4 and is not enough.
    Reply  Sat Oct 20 20:37:55 2012, Den, Update, SUS, PITCH damping needed DSC_4778.JPGpitch.JPGyaw.JPGDSC_4776.JPG


    
        
            Quote:
        
        
            

            
    Reply  Mon Oct 22 11:26:12 2012, rana, Update, SUS, PITCH damping needed 
 
Too bad - I thought it would at least give a little damping. Since we want the viscous-like energy loss to be ~49x larger, we need to have the
field modulation in the damper (not dumper) increase by ~7.
    Reply  Tue Oct 23 01:46:53 2012, Den, Update, SUS, PITCH damping needed Mirror_Holder_ECD_NEW_DRAWING.PDFTT_DAMPING_DRAWING.PDF


    
        
            Quote:
        
        
            

            
    Reply  Tue Oct 23 17:12:30 2012, Den, Update, SUS, PITCH damping needed simple_drawing.PDF
 Koji and Steve pointed out that previous design  of a damping bracket was a bit complicated to manufacture. So I made it simpler and
also added a tap hole for original yaw damping. We'll give drawing to Mike in the machine shop tomorrow morning.
I've purchased K&J magnets for eddy current damping, they should be here in 2 days. 
    Reply  Tue Oct 23 18:18:29 2012, Jenne, Update, SUS, PITCH damping needed 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Wed Oct 24 01:02:10 2012, Koji, Update, SUS, PITCH damping needed 
Wow... This is even more complicated than the original "Y" design...
    Reply  Mon Oct 29 18:14:55 2012, Den, Update, SUS, PITCH damping needed DSC_4787.JPGDSC_4791.JPG
 
 We've received all parts that we need for eddy current damping. I've made an estimate of Q with dirty tip-tilt. It looks fine (Q~1)
We need to check ring magnets for vacuum compatibility. Bob start baking on Friday.
    Reply  Wed Feb 22 08:54:17 2017, steve, Update, PEM, PSL enclousure particle count dusty__PSL.png
ETMX sus damping recovered.  PSL enclousure is dusty at 20V rotation speed. Rainy days as outside condition.




Quote:



The MET#1 particle counter
    Reply  Tue Jan 16 11:05:51 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted 
While moving the RefCav to facilitate the PSL shelf install, I bumped the power cable to the AOM driver. I will re-solder
it in the evening after the shelf installation. PMC and IMC have been re-locked. Judging by the PMC refl camera image, I may also have bumped the camera
as the REFL spot is now a little shifted. The fact that the IMC re-locked readily suggests that the input pointing can't have changed significantly
    Reply  Tue Jan 16 21:46:02 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted 
Johannes informed me that he touched up the PMC REFL camera alignment. I am holding off on re-soldering the AOM driver power as I could use another pair
of hands getting the power cable disentangled and removed from the 1X2 rack rails, so that I can bring it out to the lab and solder it back on.

Is anyone aware of a more robust connector solution for the type of power pins we have on the AOM driver?
    Reply  Fri Jan 12 10:26:24 2018, Steve, Update, PSL, PSL shelf work schedule 
Measurements for good fit were made. The new shelf will be installed on next Tuesday at 2pm

The reference cavity ion pump is in the way  so the cavity will be moved 5" westward. The shelf height space will be 10" 
Under shelf working height 18" to optical table.
    Reply  Wed Oct 17 08:30:49 2012, Steve, Update, SUS, PTICH damping needed 


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Mon Mar 3 13:58:10 2008, steve, Update, Computers, RFM Network are down 
The CODAQ_RFNETWORK are down, except C1SUSVME & AWG
    Reply  Mon Mar 3 19:34:40 2008, rana, Update, Computers, RFM Network are down 
[quote]The CODAQ_RFNETWORK are down, except C1SUSVME & AWG[/quote]
All of the FE machines were found to be down this afternoon. I called Alex and he suggested several
things which didn't work (restart EPICS tasks, power cycle RFM switch, etc.).
    Reply  Thu Jun 6 15:46:10 2013, Max Horton, Summary, General, Smart UPS 2200 Batteries Replaced 
Replaced the batteries successfully in the control room.  We just had to switch the clips from the old batteries to the new one, which we didn't
know was possible until now.
    Reply  Wed Mar 23 11:55:47 2016, Steve, Update, General, Smart UPS 2200 Battery Replaced 
Batteries replaced in control room UPS after 3 years from replaceUPSbattery.com

 

 
Entry  Thu Apr 27 16:41:13 2017, Eric Gustafson, Update, LSC, Status of the 40 m PD Frequency Response Fiber System 
There two reports in the DCC describing the state of the system as of October 2014 including: (1)  Alex Cole’s “T1300618 Automated
photodiode Frequency Response Measurement System” and a Wiki  created by Alex Cole where there are some instructions on the Master Script at https://wiki.ligo.caltech.edu/ajw?AlexanderCole    


And (2)
    Reply  Tue Apr 9 21:27:48 2013, Jenne, Update, 40m Upgrading, TRY temporarily in place 


    
        
            Quote:
        
        
            

           I've used a Y1 mirror to steer the Y transmission to an R98% BS. The reflected beam falls on PDA520 and the transmitted beam is steered to
    Reply  Thu Feb 2 12:17:48 2017, Steve, Update, General, USB microscope 
This AmScope microscope
would have 3.5x-180x magnification, calibratable measurement function, 5MP picture and good working distance to work on printed circuit boards.

 
    Reply  Thu Feb 9 08:03:08 2017, Steve, Update, General, USB microscope ordered 
http://www.amscope.com/3-5x-180x-boom-stand-trinocular-zoom-stereo-microscope-with-144-led-ring-light-and-10mp-camera.html
will be ordered today.

The actual unit we are getting has lockable zoom for better repeatability after calibration: SM-3NTPZZ-144
    Reply  Thu Feb 23 14:50:26 2017, Steve, Update, General, USB microscope returned 
The microscope shipped back to the vendor for credit yesterday.




Quote:



http://www.amscope.com/3-5x-180x-boom-stand-trinocular-zoom-stereo
Entry  Wed Oct 19 14:43:15 2016, Steve, Update, General, Viewports & coating of 2001 vacViewp2001.PDFtiltedViewport.PDF
Tilted viewports installed in horizontal position. Atm2
    Reply  Thu Jul 26 15:11:18 2018, Steve, Update, General, Viewports & coating of 2001 BK7window_Coatings.PDF
New optical quality BK-7 windows in 2001 [4 substrates ] AR coated R<0.75 % for 630-1064nm "
Azury BLue" broadband : TRX, TRY, ITMY-Oplev &  ITMX-Oplev viewports.

The BS-Oplev and PRM-Oplev 10" CF with 5.38" diameter view was coated the same way. The window here is
    Reply  Wed Oct 19 17:02:34 2016, rana, Update, General, Viewports & coating of 2016 
These old specs are not so bad. But we now want to get replacements for the TRX and TRY and PSL viewports that are R <0.1% at 532 and 1064 nm.

I don't know of any issues with keeping BK-7 as the substrate.
    Reply  Wed Jun 11 08:57:49 2014, Steve, Update, PEM, air cond maintenance tomorrow morning 


    
        
            Quote:
        
        
            

             The 4th week of no wet mopping of the floor  and no wet wiping  the vacuum envelope.
    Reply  Fri Aug 26 10:45:17 2011, steve, Update, General, crane at ETMY is fixed P1080190.JPGP1080188.JPG


    
        
            Quote:
        
        
            

           The horizontal trolley drive stopped working  at the east end this morning. It is working intermittently. In the worst case we can take
    Reply  Mon Mar 6 09:12:59 2017, Steve, Update, safety, crane inspection 2017 inspection_2017.jpg
All 3 cranes inspected by professional Fred Goodbar of Konecranes and load tested with 450 lbs at max reach on Friday, March 3, 2017

 

 
    Reply  Mon Feb 12 14:56:00 2018, Steve, Update, safety, crane inspection 2018 ETMY.jpgVetex.jpgETMX.jpg
Our 3 cranes passed  professional  inspection. Fred Goodbar of Konacrane with 450 lbs load at full extension.

Certificates will be posted in 40m wiki as they arrive.

 
    Reply  Fri Mar 4 11:07:10 2016, Steve, Update, safety, crane inspection completes 2016 safey audit craneInsp2016.jpg
All 3 cranes inspected by professional and load tested with 450 lbs at max reach.

 
    Reply  Fri Dec 2 10:57:08 2016, steve, Update, PEM, door seal replaced 1_year_PEM.png
The south end door leaky weather seals replaced.

The aim is here to get some overpressure inside / outside so the lab partical count would not depend on outside condition.

 
Entry  Thu Aug 12 10:56:31 2010, steve, Update, Environment, dusty floor work in progres 
I powered down 1Y1 and 1Y2 instrument racks of MC and RF-systems this morning.
Both racks, SP table, clean tools-parts boxes and MC2 area are also covered with plastics.
Bertin Bros. Construction, Inc is working on the floor preparation. Their head man is Robby Bertin, cell 626. 831.2264
    Reply  Thu Feb 4 10:14:52 2016, Steve, Update, SUS, earthquake 3.5M  EQ3.5m_Simmier.Ca.png
 

 
    Reply  Thu Jan 14 13:44:05 2016, Steve, Update, SUS, earthquake 3.6M  3.6M_JohannesburgCA.pngETMX_3.6_M.png
No obvious sign of damage.

 
    Reply  Tue Sep 3 14:23:21 2013, Steve, Update, PEM, earthquakes EQm6&5.png
 ~Vancuver, Canada earthquakes: magnitude 6,  5  and more shaking
 