40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 299 of 341  Not logged in ELOG logo
IDup Date Author Type Category Subject Text Attachments
  15025   Thu Nov 14 12:11:04 2019 ranaUpdatePEMFollow-up on seismometer discussionat 1 Hz' this effect is not large so
that's real translation. at lower frequencies
a ground tilt couples to the horizontal sensors
  
  15026   Thu Nov 14 23:56:18 2019 ranaUpdateLSCoff the bad Violin filtersWe turned off many excessive violin mode
bandstop filters in the LSC.

Due to some feedforward work by
 out.pdf 
  15027   Fri Nov 15 00:18:41 2019 ranaUpdatePEMFollow-up on seismometer discussionThe large ground motion at 1 Hz started
up again tonight at around 23:30. I walked
around the lab and nearby buildings with
 MCshake.pdf 
  15028   Fri Nov 15 11:58:12 2019 gautamUpdateLSCoff the bad Violin filtersThe clue was that the loop X arm POX loop looked
to have low (<3dB)) gain margin around
600 Hz (and again at 700 Hz). 
 violinFix.pdfnewViolinConfig.png 
  15029   Fri Nov 15 12:08:04 2019 gautamUpdateLSCPOPDC whitening boardThe DC port of the Bias-Tee is routed to
(a modified
version of) the iLIGO whitening board.
  
  15030   Fri Nov 15 12:16:48 2019 gautamUpdatePEMFollow-up on seismometer discussionAttachment
#1 is a spectrogram
 BS_ZspecGram.pdf.zip 
  15031   Fri Nov 15 18:59:08 2019 ranaUpdateComputersZITA: started upgrade from Ubuntu 14 LTS to 18 LTSand so it begins...until this is finished
I have turned off the projector and moved
the striptools to the big TV (time to look
  
  15032   Mon Nov 18 14:32:53 2019 gautamUpdatePEMFollow-up on seismometer discussionThe nightly seismic activity enhancement
continued during the weekend. It always shows
up around 10pm local time, persists for ~1
  
  15033   Mon Nov 18 16:32:15 2019 gautamUpdateComputersZITA: started upgrade from Ubuntu 14 LTS to 18 LTSthe upgrade seems to have been successfully
executed - the machine was restarted at ~430pm
local time. Projector remains off and diagnostic
  
  15034   Mon Nov 18 21:04:38 2019 gautamUpdateLSCLocking - some ideasSome ideas Koji suggested:


Try approaching the CARM
offset zero point "from the other side"
  
  15035   Tue Nov 19 15:08:48 2019 gautamUpdateCDSVertex models rebootedJon and I were surveying the CDS situation
so that he can prepare a report for discussion
with Rolf/Rich about our upcoming BHD upgrade.
 armSat.png 
  15036   Tue Nov 19 21:53:57 2019 gautamUpdatePEMFollow-up on seismometer discussionThe shaking started earlier today than
yesterday, at ~9pm local time.

While the IFO is shaking, I thought
 seisxSpec.pdf 
  15037   Wed Nov 20 01:07:18 2019 gautamUpdateLSCLocking - progressSummary:


CARM offset was reduced
to 0 with the PRMI locked.
TRY
 PRFPMI.png 
  15038   Wed Nov 20 12:14:17 2019 gautamUpdateLSCLocking - progressI took a look at the TRX/TRY RIN reported
in the single arm POX/POY lock, and compared
the performance of the two available PDs
 TRX_TRY_comparison.pdf 
  15039   Wed Nov 20 17:20:24 2019 YehonathanUpdateLSCQPD Investigation{Gautam, Yehonathan}

In search of the source of discrepancy
between the QPD readings in the X and Y arms,
  
  15040   Wed Nov 20 17:52:00 2019 gautamUpdateLSCQPD MEDM screen updateKoji and I had noticed that there was some
discrepancy between the switchable gain stages
of the EX and EY QPDs. Sadly, there was no
 newLookQPD.pngTRX_TRY_comparison.pdfIMG_8186.JPG 
  15041   Wed Nov 20 21:29:28 2019 gautamUpdateLSCPRG ~13After the QPD fix, both arms report consistent
buildup - see Attachment #1. The peak values
touch ~250, corresponding to a PRG of ~13.
 PRG13.pdf 
  15042   Thu Nov 21 12:46:22 2019 gautamUpdateLSCCM board studyIn preparation for trying out some high-bandwidth
Y arm cavity locking using the CM board,
I hooked up the POY11_Q_Mon channel of the
 YARM_CMslow.pdf 
  15043   Thu Nov 21 13:14:33 2019 KojiUpdateLSCCM board studyOne of the differences between the direct
POY and the CM_SLOW POY is the presence of
the CM Servo gain stages. So this might mean
  
  15044   Thu Nov 21 19:08:58 2019 gautamUpdateLSCHigh BW lock of Y arm length to PSL frequencySummary:

The Y arm cavity length was locked
to the PSL frequency with ~26kHz
 highBW_POY.pdfCM_UGF.pdfIN2_ACcoupling.pdf 
  15045   Fri Nov 22 00:54:14 2019 gautamUpdateLSClocking notes[KA, GV]

There was no shaking (that disturbed
the locking) tonight!
 ALSnoiseIncrease.pdf 
  15046   Mon Nov 25 19:11:22 2019 gautamUpdateLSCALS noise re-lookI re-checked the ALS noise in the following
configurations:


PRM is misaligned.
Michelson
 ALSnoise.pdf 
  15047   Mon Nov 25 22:10:26 2019 shrutiUpdateNoiseBudgetDiagnostics This is to help troubleshoot the excess
noise measured earlier.

The following channels were measured
 LSC.pdfITMY.pdfITMX_L.pdf 
  15048   Tue Nov 26 13:33:33 2019 YehonathanUpdateCamerasMC2 Camera rotated by 90 degreesMC2 analog camera was rotated by 90 degrees.
Orientation correctness was verified by exciting
the MC2 Yaw degree of freedom.
 MC2AnalogCameraAfter.jpgMC2AnalogCameraBefore.jpg 
  15049   Tue Nov 26 17:07:41 2019 gautamUpdateLSCPOX / POY calibrationSummary:

Since we are using the POX and
POY photodiodes as out-of-loop sensors for
 POX_POY_sensorNoise.pdfALSnoise_20191125.pdf 
  15050   Tue Nov 26 18:16:08 2019 ranaUpdateLSCPOX / POY calibration...maybe the opto-mechanical
CARM plant
  
  15051   Wed Nov 27 12:16:52 2019 gautamUpdateLSCITMX and ITMY OSEMs with low and high circulating powerSummary:

The ITMX OSEMs report elevated
noise in the 10-100 Hz band when we have
 ITMXshadowSensors.pdfITMYshadowSensors.pdf 
  15052   Wed Nov 27 13:14:02 2019 ranaUpdateLSCITMX and ITMY OSEMs with low and high circulating powerif the RP don't fit

u must acquit

sweep the laser amplitude
  
  15053   Wed Nov 27 16:10:29 2019 gautamUpdateLSCAOM reconnectedi reconnected the AOM driver to the AOM
in the main beam path (it was hijacked for
the AOM in the AUX laser path for Anjali's
  
  15054   Wed Nov 27 17:51:52 2019 gautamUpdateWienerMCL FF statusThe old MCL filters are not completely
useless - I find a factor of ~2 reduction
in the MCL RMS when I turn the FF on. It'd
 MCL_FF.pdfPRC_FF.pdf 
  15055   Wed Nov 27 18:51:22 2019 Gavin WallaceUpdateIMCQ Measurement of Test Masses[Yehonathan, Gavin]

As the resonant modes of the 40m
TMs are at high frequencies (starting at
  
  15056   Wed Nov 27 23:24:01 2019 gautamUpdateLSCNo shaking but no inspiration eitherSummary:

I tried the following minor changes
to the locking procedure to see if there
  
  15057   Sun Dec 1 13:38:48 2019 ranaUpdateLSCNo shaking but no inspiration eitheryes, reasonable   
  15058   Mon Dec 2 00:27:20 2019 gautamUpdateALSGreen ALS resurrectionAttachment
#1 -
 ALSnoiseComparison.pdfALS_TR_RIN.pdfGreemAM.pdf 
  15059   Mon Dec 2 18:20:29 2019 gautamUpdateALSEY uPDH post mixer LPFAs part of characterization, I wanted to
calibrate the EY uPDH error point monitor
into units of Hz. So I thought I'd measure
 EY_uPDH_LPF.pdfEY_uPDH_OLTF.pdf 
  15060   Mon Dec 2 20:18:18 2019 ranaUpdateALSEY uPDH post mixer LPF         
         filter
Q seems too high, 
  
  15061   Mon Dec 2 23:01:47 2019 gautamUpdateCDSFrequent DTT crashes on pianosaI have been experiencing frequent crashes of  DTTerrorLog.tgz 
  15062   Tue Dec 3 00:03:57 2019 gautamUpdateLSCGreen ALS also shows elevated noise with high arm buildupSummary:  ALSnoiseIncrease_greenBeat.pdf 
  15063   Tue Dec 3 00:10:15 2019 KojiUpdateALSEY uPDH post mixer LPFI got confused. Why don't we see that
too-high-Q pole in the OLTF? 
  
  15064   Tue Dec 3 00:51:25 2019 gautamUpdateALSEY uPDH post mixer LPFI'm not sure - maybe it was measurement
error on my part, I will double check. Moreover,
the EX
  
  15065   Tue Dec 3 14:52:13 2019 ranaUpdateIMCQ Measurement of Test Masses

  
  15066   Tue Dec 3 18:15:42 2019 gautamUpdateALSEY uPDH post mixer LPFRana and I discussed this alogrythym a
bit today - here are some bullet points,
I'll work on preparing a notebook. We
  
  15067   Tue Dec 3 20:32:37 2019 ranaOmnistructureDAQNDS2 situationRecently,
accordian to Gautam, the NDS2 server has
 getData.pychanlist.txt 
  15068   Tue Dec 3 21:28:24 2019 gautamUpdateALSEY uPDH post mixer LPFHere are some loop transfer functions.
I basically followed the decomposition of
the end PDH loop as was done in the multi-color
 uPDH.pdf 
  15069   Tue Dec 3 22:41:17 2019 shrutiUpdateGeneralPLL for PM measurement I worked on the setup up for the phase
modulation measurement of the X end NPRO
PZT. A previous similar measurement can be
 PM_measurement.jpeg 
  15070   Wed Dec 4 08:54:07 2019 YehonathanUpdateIMCMirror analog shaking{Yehonathan, Gavin}

Yesterday we tried to shake ITMX
with a function generator in order to observe
  
  15071   Wed Dec 4 09:11:42 2019 YehonathanUpdateCDSReboot scriptAfter the CDSs crashed we run the rebootC1LSC.sh script.

The script is a bit annoying in
that it requires entering the CDSs' passwords
 medmScreen11.ps 
  15072   Wed Dec 4 12:13:10 2019 gautamUpdateCDSReboot scriptIt was way more annoying without a script
and took longer than the 4 minutes it does
now.
  
  15073   Wed Dec 4 19:54:27 2019 gautamUpdateLSCA look to the pastTrawling
through some past elogs, I saw that the ALS
noise increase as a function of CARM offset
 DRFPMI_2016March.pdf 
  15074   Wed Dec 4 20:32:43 2019 gautamUpdateGeneralPLL for PM measurement Were
some cables from the ALS beat setup modified?
I can't see the beat on the scope, and
  
ELOG V3.1.3-