    Reply  Thu Jan 25 16:39:09 2018, Kira, Update, PEM, Seismometer can insulation test HeaterTest.png
    Reply  Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay 
    Reply  Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay 
    Reply  Tue Jan 30 10:22:20 2018, Steve, Update, VAC, RGA scan at day 175 RGApd80-b-468-175d.pngRgaOn20hrs.png
Entry  Wed Jan 31 15:27:55 2018, gautam, Update, SUS, SUS MEDM master screens updated NewSUSmaster.png
Entry  Wed Jan 31 15:29:44 2018, johannes, Update, DAQ, PSL acromag server moved from megatron to c1auxex2 
    Reply  Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay IMG_6875.JPG
    Reply  Wed Jan 31 15:46:05 2018, Steve, Update, safety, crane inspection 
    Reply  Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths PMCmodDepth.pdfXPDH.pdf
    Reply  Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack 
    Reply  Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget FiberALS_PowerBudget.pdfpreampProposed.pdf
    Reply  Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway PSLinterlock.png
    Reply  Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget 
    Reply  Thu Feb 1 16:09:13 2018, Kira, Update, PEM, Seismometer can insulation test cooling_fit.png
    Reply  Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway 
    Reply  Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching ALS_whitening_switching.pdfALS_whitening_switching_works.pdf
Entry  Fri Feb 2 23:28:13 2018, Koji, Update, Computer Scripts / Programs, netgpib data missing / PROLOGIX yellow box (crocetta) not working 
    Reply  Sat Feb 3 13:03:45 2018, gautam, Update, Computer Scripts / Programs, netgpib data missing / PROLOGIX yellow box (crocetta) not working 
    Reply  Mon Feb 5 12:12:41 2018, Kira, Update, PEM, Seismometer can insulation test temp_data.py
    Reply  Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels ALSpowerlineHarmonics.pdf2A1B3AC4-4059-416A-AD88-8AB0431D7A55.jpeg
    Reply  Mon Feb 5 18:04:35 2018, Koji, Update, Computer Scripts / Programs, netgpib data missing / PROLOGIX yellow box (crocetta) not working 
    Reply  Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
    Reply  Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified A68AF89C-E8A9-416D-BBD2-A1AD0A51E0B5.jpeg
Entry  Tue Feb 6 16:58:19 2018, Kira, Update, PEM, temperature measurements temps.png
    Reply  Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified 
    Reply  Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget 
    Reply  Wed Feb 7 12:35:56 2018, Kira, Update, PEM, Seismometer can insulation test fit_1.png
    Reply  Wed Feb 7 15:50:42 2018, Steve, Update, VAC, IFO pressure monitoring CC_analog.png
    Reply  Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete 6613CD37-5014-44AE-B1FE-6F6A8137DF62.jpeg
Entry  Wed Feb 7 16:09:06 2018, Steve, Update, SUS, ETMX -15V dc corrected 
    Reply  Wed Feb 7 17:01:25 2018, gautam, Update, PEM, PID test plan ADC_EX.pngDAC_EX.pngIMG_20180207_170628.jpgdac_adc.jpgIMG_20180207_165833.jpg
    Reply  Wed Feb 7 19:14:19 2018, rana, Update, PEM, PID test plan 
Entry  Thu Feb 8 00:01:08 2018, gautam, Update, CDS, Vertex FEs all crashed CDSrecovery_20180207.png
    Reply  Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan D990694THD_trial.pdf
    Reply  Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan 
    Reply  Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving 
    Reply  Thu Feb 8 12:24:37 2018, Kira, Update, PEM, PID test plan 
    Reply  Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out IMG_5131.JPGIMG_5133.JPGD990694-B_cuttingPlan.pdf
    Reply  Thu Feb 8 17:32:44 2018, Kira, Update, PEM, PID test plan IMG_20180208_171423.jpgIMG_20180208_172107.jpgIMG_20180208_171853.jpgIMG_20180208_171932.jpg
    Reply  Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out 
    Reply  Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial THD_trial.pdf
    Reply  Fri Feb 9 15:29:32 2018, Kira, Update, PEM, PID test plan IMG_20180209_152158.jpg
    Reply  Mon Feb 12 14:56:00 2018, Steve, Update, safety, crane inspection 2018 ETMY.jpgVetex.jpgETMX.jpg
Entry  Tue Feb 13 21:22:44 2018, Steve, Update, SEI, one load cells tested as_measured_102kg.jpgsensor.jpg1500lbs_load__cell.jpg
Entry  Tue Feb 13 22:35:21 2018, gautam, Update, Electronics, PSL table power supply cleanup 
    Reply  Wed Feb 14 17:49:22 2018, gautam, Update, Electronics, PSL table power supply cleanup IMG_5135.JPGSorensens_1X1_before.JPGSorensens_1X1_after.JPG
    Reply  Thu Feb 15 16:03:57 2018, Kira, Update, PEM, PID test plan 
Entry  Fri Feb 16 01:09:55 2018, gautam, Update, ALS, EX green locking duty cycle GreenLock8hrs.png
    Reply  Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing BeatMouthX_20180216.pdfIMG_5134.JPG
    Reply  Fri Feb 16 15:57:58 2018, Steve, Update, VAC, TP3 drypump replaced 