40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 286 of 344  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  2905   Mon May 10 19:09:45 2010 ranaUpdateElectronicsUnexpected oscilaltionin the POY11 PD


   
        
            
  
  2913   Tue May 11 18:58:49 2010 ranaHowToElectronicsMarconi phase noise measurement setupJust a little while ago, at 2330 UTC on
5/11, I swapped the phase noise setup to
use another Marconi - this time its the 3rd
 Untitled.png 
  2914   Wed May 12 02:21:56 2010 ranaHowToElectronicsMarconi phase noise measurement setupFinally got the 3-cornered-hat measurement
of the IFRs done. The result is attached.
 pn.png 
  2926   Thu May 13 05:06:43 2010 ranaUpdate40m Upgrading216 MHz resonance in the POY11 PD killed 
 This idea was tried before
by Dale in the ~1998 generation of PDs. Its
  
  2973   Mon May 24 10:03:14 2010 ranaUpdateLSC40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue. 
 If you have a working 40m Optickle
model, put it in a common place in the SVN,
  
  2974   Mon May 24 11:32:05 2010 ranaUpdateLSC40mUpgrade Field Power and RF Power Spectrum at the ports. 38m/38.55m arm length issue.


   
        
            
 reflRFpowerVsArmLength.png 
  2999   Thu May 27 09:43:50 2010 ranaUpdateGreen Lockingmore details

    

       
            
  
  3002   Thu May 27 23:59:54 2010 ranaUpdatePEMNew Foam Box installedValera
and I put the 2 Guralps and the Ranger onto
the big granite slab and then put the new
 Untitled.png 
  3003   Fri May 28 00:40:53 2010 ranaUpdatePEMDAQ down Although trends are available, I
am unable to get any full data from in the
past (using DTT or DV). I started the FB's
  
  3018   Sun May 30 22:18:49 2010 ranaUpdatePEMGranite slab w/ lead balls is so far a flopThe seismometers showed an increased
noise in the Y-direction when put on top
of the granite slab. By tapping the slab,
  
  3022   Mon May 31 22:52:57 2010 ranaUpdatePEMGranite slab w/ lead balls is so far a flopThis plot shows the noise with the box
on, but no granite. We're still pretty far
off from the Guralp data sheet.
 Untitled.pnghuddlez.pnghuddlez.png 
  3047   Thu Jun 3 22:17:05 2010 ranaUpdatePEMseismometers off of linoleum floor At ~2350 UTC on June 2, the seismometers
were turned off. After the granite slab was
repositioned with the new lead, the Ranger
 Untitled.pnga.pngUntitled.png 
  3050   Fri Jun 4 23:52:57 2010 ranaUpdatePEMseismometers off of linoleum floor   Untitled.pnghuddlez.png 
  3051   Sun Jun 6 04:48:41 2010 ranaUpdateCOCITM01 HR Phase MapWhile trying to set up the SIS-FFT to use
our new ITM phase maps, I noticed that the
surface of our ITMs looks pretty good actually
 itm01hr.png 
  3056   Tue Jun 8 18:39:36 2010 ranaUpdatePEMDAQ down

    
  
  3061   Wed Jun 9 21:05:44 2010 ranaSummaryComputersop540m is not to be usedThis is a reminder (mainly for Steve, who somehow   
  3078   Tue Jun 15 19:24:25 2010 ranaUpdateIOOMode Profile after Mode Matching Telescope


   
        
            
  
  3090   Sat Jun 19 17:31:48 2010 ranaDAQCDSExcess Noise in C1:IOO-MC_DRUM1 fixed by rebootI was getting an excess noise in the C1:IOO-MC_DRUM1
channel - it was a flat spectrum of 10 cts/rHz
  
  3110   Wed Jun 23 23:08:30 2010 ranaConfigurationPSLFSS SLOWDC should be ~-4.0 
  
  3123   Sat Jun 26 05:02:04 2010 ranaHowToSVNSVN woes


   
        
            
  
  3125   Sat Jun 26 21:13:19 2010 ranaSummaryComputer Scripts / ProgramsCOMSOL 4.0 InstallationI've
installed COMSOL 4.0 for 32/64 bit Linux
in /cvs/cds/caltech/apps/linux64/COMSOL40/
It
  
  3129   Mon Jun 28 21:26:05 2010 ranaSummaryCDSCDS adapter board notesThose drawings are an OK start, but its
obvious that things have changed at the 40m
since 2002. We cannot rely on these drawings
  
  3132   Tue Jun 29 10:20:58 2010 ranaUpdateMOPAMOPA is NOT deadNot dead. It just had a HT fault. You can
tell by reading the front panel. Cycling
the power usually fixes this.
  
  3141   Wed Jun 30 00:45:26 2010 ranaUpdateVACslow pumpdown stopped for the nightAs per Steve's instructions, at 12:43 AM,
I used the following steps to stop the pumpdown
until the morning:
  
  3151   Wed Jun 30 23:03:46 2010 ranaConfigurationIOOPower into MC restored to maxKiwamu, Nancy, and I restored the power
into the MC today:

    Changed the 2" dia.
  
  3179   Thu Jul 8 15:43:58 2010 ranaUpdateComputersSome channels not being recorded!!!

    
        
 3-monkeys-ComicPosition.gif 
  3189   Fri Jul 9 20:16:19 2010 ranaSummaryPSLThings I did to the PSL today: Refcav, PMC, cameras, etc.I re-aligned the beam into the PMC. I got
basically no improvement. So I instead changed
the .LOW setting so that PMCTRANS would no
  
  3190   Sun Jul 11 20:11:48 2010 ranaSummaryPSLRC trend after the insulation removal   rc.png 
  3209   Tue Jul 13 19:26:47 2010 ranaUpdateIOOMC still brokenAfter whatever Joe/Alberto did this afternoon,
the MC was not locking. Koji and I removed
several of the cables in the side of the
 a.txt.gz 
  3231   Thu Jul 15 19:13:03 2010 ranaUpdateIOOMC_F checkSometimes I like to plot the spectrum of
MC_F. Its a good diagnosis of whether something
is wrong.
 a.png 
  3232   Thu Jul 15 19:27:04 2010 ranaSummaryPSLRC trend after the insulation removal   Untitled.pnga.pngb.png 
  3242   Sun Jul 18 20:50:03 2010 ranaConfigurationIOOMC TRANS optics changedTo make the beam on the MC trans camera
bigger, I removed the lens + ND filter that
was in that path.
  
  3247   Mon Jul 19 21:47:36 2010 ranaSummaryDAQDAQ timing testSince we now have a good measurement of
the phase noise of the Rb clock
Marconi locked to the Rb clock, I wanted
  
  3263   Thu Jul 22 01:02:08 2010 ranaUpdateTreasureMonsters, LNVR, and Phase noiseOn
Picasa
  
  3271   Fri Jul 23 00:13:11 2010 ranaUpdatePSLProblem NOT REALLY SolvedSo...who was working around the PSL rack
this morning and afternoon? Looks like there was
  
  3283   Fri Jul 23 21:35:48 2010 ranaUpdateCDSRerouted RFM around c1lsc, took RFM card out of c1lsc I just realized that an unfortunate
casualty of this LSC work was the deletion
of the slow controls for the LSC which we
  
  3286   Sat Jul 24 14:27:36 2010 ranaUpdateElectronicsFSS Oscilaltor Phase Noise MeasurementI reconnected the RF signal to the FSS
and to the FSS' EOM so that we could lock
the refcav again.
  
  3299   Tue Jul 27 16:03:36 2010 ranaSummaryDAQDAQ timing test

    
        
 Untitled.png 
  3304   Wed Jul 28 01:05:44 2010 ranaUpdateSEIBode Magnitude Plot and Concerns1) Gravity has to be included because the
inverted pendulum effect changes the resonant
frequencies. The deflection from gravity
  
  3345   Sun Aug 1 21:04:45 2010 ranaSummaryComputer Scripts / ProgramsMC Autolocker fixedSomeone had left a typo in the MC autolocker
script recently while trying to set the lock
threshold to 0.09. As a result, the autlocker
  
  3346   Sun Aug 1 21:40:27 2010 ranaSummaryPSLFSS: SLOWDC responseI bet you thought that the NPRO slow actuator
response could be well represented by a pole
at ~0.1 Hz? Well, that's just what they want
 Untitled.png 
  3361   Wed Aug 4 19:50:58 2010 ranaConfigurationElectronicsRubidium clocks too hot: hut removedAlastair found that the foam hut that he
and Jan put on top of the Rb clocks to temperature
stabilize them was too good of an insulator.
 beat.png 
  3377   Fri Aug 6 16:20:08 2010 ranaUpdateGeneralclocks still not locked fully - phase shifted I tried to get the clocks to be closer
to 90 deg for the relative phase by adding
some cable length to one of the lines, but
 Untitled.pdf 
  3385   Sat Aug 7 21:57:56 2010 ranaSummaryDMFseisBLRMS restartedThe green xterm on op540m which is running
the seisBLRMS DMF got stuck somehow ~3 days
ago and lost its NDS connection. I closed
 Untitled.png 
  3451   Fri Aug 20 17:46:30 2010 ranaUpdatePSL40m PSL Upgrade Layout v0.3http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL/LayoutUpgrade
P-pol = purple
S-pol = red
  
  3463   Tue Aug 24 12:03:57 2010 ranaUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCI used the free software called 'ABCD'
for Mac to construct this mode matching solution
for going from the PMC to the IMC.
 40mPSL.pngScreen_shot_2010-08-24_at_6.07.43_PM.png 
  3469   Wed Aug 25 15:32:52 2010 ranaUpdatePSLPSL Upgrade: Mode Matching from PMC to IMCIn a manner similar to the now classic
'Mode Matching from PMC to  IMC' entry, I
have calculated the lenses and positions
 40mPSL.pngScreen_shot_2010-08-25_at_6.26.23_PM.png 
  3481   Fri Aug 27 19:30:31 2010 ranaUpdateCDSSLOW controlsFor the future SLOW controls our current
plan is to keep using the VME based stuff
and associated processors (Baja, Motorola,
  
  3483   Sat Aug 28 01:02:31 2010 ranaUpdatePSLThe beginnings of the new PSLIn fact, many of the mounts need
to be adapted to 4": the beefy
steering mirrors going into the PMC, the
  
  3485   Sun Aug 29 21:18:00 2010 ranaUpdateComputerskallo -> rossaWe changed the name of the new control
room computer from kallo to rossa (since
its red).
  
ELOG V3.1.3-