  14314   Wed Nov 21 16:48:11 2018 gautamUpdateCOCEY mini cleanroom setupWith Chub's help, I've setup a
mini cleanroom at EY - Attachment
#1. The HEPA unit is running on
 IMG_7174.JPG 
  14315   Sun Nov 25 17:41:43 2018 JonOmnistructure Vacuum Controls Upgrade - Status and PlansNew hardware has been installed in the
vacuum controls rack. It is shown in the
below post-install photo.
 rack_photo.jpg 
  14316   Mon Nov 26 10:22:16 2018 aaronUpdateGeneralprojector light bulb replacedI replaced the projector bulb. Previous
bulb was shattered.
  
  14317   Mon Nov 26 15:43:16 2018 aaronUpdateOMCOMC scanning/aligning scriptI've started testing the OMC channels
I'll use.

I needed to update the model, because
 c1omc.png 
  14318   Mon Nov 26 15:58:48 2018 SteveUpdateVACVent 81Gautam, Aaron, Chub & Steve,

ETMY heavy door replaced by light
one.
  
  14319   Mon Nov 26 17:16:27 2018 gautamUpdateSUSEY chamber work[steve,
rana, gautam]


PSL and EY 1064nm laser
 IMG_5251.JPG 
  14320   Mon Nov 26 21:58:08 2018 JonOmnistructure Serial Vacuum SignalsAll the serial vacuum signals are now interfaced
to the new digital controls system. A set
of persistent Python scripts will query each
 GP307_relays.jpeg 
  14321   Tue Nov 27 10:50:20 2018 SteveUpdatePEMearth quake MexicoNothing tripped.

 
 5.5M.Mexico.png 
  14322   Tue Nov 27 17:06:51 2018 SteveConfigurationVACAgilent 84FS turbo installed as TP2Chub & Steve,   
  14323   Thu Nov 29 08:13:33 2018 SteveUpdatePEMEQ 3.9m So CAEQ did not trip anything. atm1

Just
a REMINDER:
our vacuum system is at atm to help the vacuum
 3.9mSoCA.pngVac_as_today.pngas_is.png 
  14324   Thu Nov 29 17:46:43 2018 gautamUpdateGeneralSome to-dos[koji,
gautam, jon, steve]


We suspect analog voltage
  
  14325   Fri Nov 30 15:53:52 2018 JonOmnistructureGeneralN2 pressure gauge fixI've made a repair to the N2 pressure
monitor. I don't believe the polarity
of the analog signal into the controller
 N2_transducer_datasheet.pdf 
  14326   Fri Nov 30 19:37:47 2018 gautamUpdateLSCLSC feedforward block diagramI wanted to set up an RTCDS model to understand
this problem better. Attachment #1 is the
simulink diagram of the signal flow. The
 LSC_FF_tester.pngScreenshot_from_2018-11-30_19-41-07.pngScreenshot_from_2018-12-10_15-31-23.pngSimLSC.png 
  14327   Sun Dec 2 16:08:44 2018 JonOmnistructureUpgradeFeedthroughs for Vacuum Acromag ChassisBelow is an inventory of the signal
feedthroughs that need to be installed on
the vacuum Acromag crate this week.
  
  14328   Sun Dec 2 17:26:58 2018 gautamUpdateIMCIMC ringdown fittingRecently we wondered at the meeting what
the IMC round trip loss was. I had done several
ringdowns in the winter of 2017, but because
 tauTheoretical.pdfringdownFit.pdfringdownScatter.pdfcavPole.pdf 
  14329   Sun Dec 2 19:32:35 2018 ranaUpdateIOOfit timesneed to vary start/stop times in fit to
test for systematics
  
  14330   Tue Dec 4 10:38:12 2018 JonOmnistructureUpgradeUpdated Feedthrough List for Vacuum Acromag ChassisBased on new input from Chub, attached
is the revised list of signal cable
feedthroughs needed on the vacuum system
 acromag_chassis_feedthroughs.pdf 
  14331   Tue Dec 4 18:24:05 2018 gautamOmnistructureGeneralN2 line disconnected[jon, gautam]

In the latest installment in this
puzzler: turns out that maybe the trend of
 IMG_7195.JPG 
  14332   Thu Dec 6 11:16:28 2018 aaronUpdateOMCOMC channelsI need to hookup +/- 24 V supplies to the
OMC whitening/dewhitening boxes that have
been added to 1X2.
  
  14333   Thu Dec 6 17:33:33 2018 JonOmnistructureGeneralN2 line disconnectedI believe I finally have the N2 gauge working
correctly. The wiring is unchanged from its
original state and the controller has been
  
  14334   Fri Dec 7 12:51:06 2018 gautamUpdateIMCIMC ringdown fittingI started putting together some code to
implement some ideas we discussed at the
Tuesday meeting here. Pipeline isn't
 time_reflAndTrans.pdfcorner_transOnly.pdfcorner_reflAndTrans.pdf 
  14335   Fri Dec 7 17:04:18 2018 gautamUpdateIOOIMC transmission
Power just before PSL shutter on
PSL table = 97
  
  14336   Fri Dec 7 19:42:47 2018 ranaFrogselogcan't upgrade DokuWiki because of PHP / SL7All of our wikis (except the 40m one which
unfortunately got turned into ligo.org mess)
use DokuWiki. This now has an auto-upgrade
  
  14337   Mon Dec 10 12:11:28 2018 aaronUpdateOMCAligning the OMCI did some ray tracing and determined that
the aux beam will enter the OMC after losing
some power in reflection on OMPO (couldn't
 B9DCF55F-1355-410C-8A29-EE45D43A56A4.jpeg 
  14338   Mon Dec 10 12:29:05 2018 aaronUpdateOMCOMC channelsI kept having trouble keeping the power
LEDs on the dewhitening board 'on'.
I did the following:
 52DE723A-02A4-4C62-879B-7B0070AE8A00.jpeg545E5512-D003-408B-9F00-55F985966A16.jpegDFF34976-CC49-4E4F-BFD1-A197E2072A32.jpeg 
  14339   Mon Dec 10 15:53:16 2018 gautamUpdateLSCSwept-sine measurement with DTTDisclaimer:
This is almost certainly some user error
 SimTF.pdf 
  14340   Mon Dec 10 19:47:06 2018 aaronUpdateOMCOMC channelsTaking another look at the datasheet, I
don't think LM7812 is an appropriate
replacement and I think the LM2940CT-12
  
  14341   Tue Dec 11 13:42:44 2018 KojiUpdateOMCOMC channelsFYI:

D050368 Anti-Imaging Chassis
https://dcc.ligo.org/LIGO-D050368
  
  14342   Tue Dec 11 13:48:04 2018 aaronUpdateOMCOMC channelsKoji gave me some tips on testing this
board that I wanted to write down, notes
probably a bit intermingled with my thoughts.
  
  14343   Tue Dec 11 14:24:18 2018 aaronUpdateOMCAligning the OMCI set up a function generator to drive
OMC-L, and have the two DCPD mons and the
OMC REFL PD sent to an oscilloscope. I need
  
  14344   Tue Dec 11 14:33:29 2018 gautamUpdateCDSNDScopeNDscope is now running on pianosa. To be
really useful, we need the templates, so
I've made 
 ndscope.png 
  14345   Tue Dec 11 18:20:59 2018 gautamUpdateOptical LeversBS/PRM HeNe is deadI found that the BS/PRM OL SUM channels
were reading close to 0. So I went to the
optical table, and found that there was no
 BSOL_dead.png 
  14346   Tue Dec 11 22:50:07 2018 aaronUpdateOMCAligning the OMCI did the following:


Noticed that the OMC rack's
power has +-18V, but I had tested
 6x 
  14347   Wed Dec 12 11:53:29 2018 aaronUpdateGeneralPower OutageAt 11:13 am there was a ~2-3 second interruption
of all power at the 40m.

I checked that nobody was in any
 IMG_0033.HEICIMG_1027.HEICIMG_2605.HEIC 
  14348   Wed Dec 12 18:27:07 2018 JonOmnistructureUpgradeAnalog signals, A/D Acromag added to vacuum systemThere turned out to be a few analog signals
for the vacuum system after all. The TP2/3
foreline pressure gauges were never part
  
  14349   Thu Dec 13 01:26:34 2018 gautamUpdateGeneralPower Outage recovery[koji,
gautam]

After several combinations of soft/hard
  
  14350   Thu Dec 13 10:03:07 2018 ChubUpdateGeneralOMC chamberBob, Aaron, and I removed the door from
the OMC chamber this morning.  Everything
went well.
  
  14351   Thu Dec 13 12:06:35 2018 gautamUpdateGeneralPower Outage recoveryI did a walkaround and checked the status
of all the interlock switches I could find
based on the SOP
  
  14352   Thu Dec 13 18:12:47 2018 gautamUpdateIOOND filter on AS camera changedIn order to see the AS beam a bit more
clearly in our low-power config, I swapped
out the ND=1.0 filter on the AS camera for
  
  14353   Thu Dec 13 20:10:08 2018 KojiUpdateGeneralPower Outage recovery[Gautam, Aaron, Koji]

The PSL interlock system
was fixed and now the 40m lab is laser hazard
 OMRON_S82K-00712.JPGreset_button_repaired1.JPGreset_button_repaired2.JPGgray_box.JPGgray_box2.JPG 
  14354   Thu Dec 13 22:24:21 2018 aaronUpdateOMCOMC channelsI completed testing of the AI board mentioned
above. In addition to the blown fuse, there
were two problems:
  
  14355   Thu Dec 13 22:36:42 2018 aaronUpdateOMCAligning the OMCI turned on AUX, and aligned the aux beam
to be centered on the first optic the AS
beam sees on the AP table. I then turned
  
  14356   Thu Dec 13 22:56:28 2018 gautamUpdateCDSFrames[koji, gautam]

We looked into the /frames situation
a bit tonight. Here is a summary:
  
  14357   Fri Dec 14 13:02:24 2018 aaronUpdateOMCAligning the OMCI replaced the 2'' AUX-AS combining
BS with a 2'' HR mirror for 1064.
I aligned the AUX beam from the new HR mirror
  
  14358   Fri Dec 14 13:06:12 2018 aaronUpdateOMCAligning the OMCI replaced the 2'' AUX-AS combining
BS with a freshly mounted 2'' HR
mirror for 1064. The mirror is labelled 'Y1-2037-45-P',
  
  14359   Fri Dec 14 14:25:36 2018 KojiUpdateCDSchiara backupfsck of chiara backup disk (UUID="90a5c98a-22fb-4685-9c17-77ed07a5e000")
was done. But this required many files to
be fixed. So the backed-up files are not
 fsck_log.log 
  14360   Fri Dec 14 22:19:22 2018 KojiUpdateGeneralChiara new USB 4TB DIskEdit:
It was not 4TB
  
  14361   Sat Dec 15 18:29:53 2018 KojiUpdateGeneralChiara new USB 4TB DIskThe local backup was done at 18:18
after 11h18m of running.

  
  14362   Sat Dec 15 20:04:03 2018 gautamUpdateIOOTT1/TT2 steppingI'm running a script that moves TT1
and TT2 randomly in some restricted P/Y space
to try and find an alignment that gets some
  
  14363   Mon Dec 17 20:45:40 2018 aaronUpdateOMCAligning the OMC[gautam, aaron]

We did work in the OMC chamber
today to get the OMC aligned. Aaron was in
 IMG_5922.JPGIMG_5921.JPG 