40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 283 of 344  Not logged in ELOG logo
    Reply  Tue Aug 23 22:30:24 2022, Tega, Update, Computers, c1teststand OS upgrade - I 
Entry  Wed Sep 29 17:10:09 2021, Anchal, Summary, CDS, c1teststand problems summary c1teststand_issues_summary.pdf
    Reply  Mon Oct 4 11:05:44 2021, Anchal, Summary, CDS, c1teststand problems summary 
    Reply  Mon Oct 4 18:00:16 2021, Koji, Summary, CDS, c1teststand problems summary 
    Reply  Tue Oct 5 17:58:52 2021, Anchal, Summary, CDS, c1teststand problems summary 
    Reply  Tue Aug 16 18:22:59 2022, Tega, Update, Computers, c1teststand rack mounting for CDS upgrade IMG_20220816_180157132.jpgIMG_20220816_175125874.jpg
    Reply  Wed Aug 17 11:10:51 2022, rana, Update, Computers, c1teststand rack mounting for CDS upgrade 
    Reply  Mon Aug 22 19:02:15 2022, Tega, Update, Computers, c1teststand rack mounting for CDS upgrade II IMG_20220822_185437763.jpgIMG_20220822_131340214.jpgc1bhd.jpegc1lsc.jpeg
    Reply  Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured 
Entry  Fri Aug 6 13:13:28 2021, Anchal, Update, BHD, c1teststand subnetwork now accessible remotely 
    Reply  Mon Aug 9 10:38:48 2021, Anchal, Update, BHD, c1teststand subnetwork now accessible remotely 
    Reply  Tue Oct 5 18:00:53 2021, Anchal, Summary, CDS, c1teststand time synchronization working now 
    Reply  Tue Oct 9 16:05:29 2018, gautam, Configuration, ASC, c1tst deleted, c1asy deployed. CDSoverview_ASY.png
Entry  Tue Apr 2 14:53:57 2019, gautam, Update, CDS, c1vac added to burt 
    Reply  Tue May 28 09:51:33 2019, gautam, Update, VAC, c1vac hard-rebooted Screen_Shot_2019-05-31_at_12.44.54_PM.png
    Reply  Mon May 27 11:37:13 2019, gautam, Update, VAC, c1vac is unresponsive 
    Reply  Mon Aug 15 18:06:07 2022, Anchal, Update, General, c1vac issues, 1 pressure gauge died 
    Reply  Mon Aug 15 20:09:18 2022, Koji, Update, General, c1vac issues, 1 pressure gauge died 
    Reply  Wed Aug 17 10:23:05 2022, Tega, Update, General, c1vac issues, pressure gauge replacement 
Entry  Tue Nov 6 23:19:06 2018, gautam, Update, VAC, c1vac1 FAIL lights on (briefly) Screenshot_from_2018-11-06_23-18-23.pngScreenshot_from_2018-11-06_23-19-26.png
    Reply  Wed Nov 7 08:32:32 2018, Steve, Update, VAC, c1vac1 FAIL lights on (briefly)...checked Vac_MC_OK.png
Entry  Fri Sep 21 16:51:43 2018, gautam, Update, VAC, c1vac1 is unresponsive 
    Reply  Mon Sep 24 15:06:10 2018, gautam, Update, VAC, c1vac1 reboot + TP1 controller replacement beforeReboot.pngafterReboot.pngCC1.png
Entry  Tue Nov 6 19:41:46 2018, Jon, Omnistructure, , c1vac1/2 replacement 
Entry  Mon Apr 20 23:27:59 2009, rana, Summary, VAC, c1vac2 rebooted: non-functional for several months 
Entry  Wed Nov 23 16:48:39 2011, Suresh, Update, General, cable cleanup 
Entry  Mon Aug 25 10:23:53 2008, steve, HowTo, General, cable killer cablkill.pngcablkll2.png
Entry  Thu Jan 3 19:19:59 2013, rana, HowTo, Electronics, cable racks 
    Reply  Wed Mar 9 16:07:42 2011, kiwamu, Update, VIDEO, cable session 
Entry  Fri Oct 2 15:11:08 2015, Steve, Update, PEM, cable squashed 
Entry  Tue Dec 11 08:53:52 2012, Steve, HowTo, PEM, cables needs care IMG_1839.JPG
    Reply  Tue Dec 11 10:09:04 2012, Ayaka, HowTo, PEM, cables needs care 
    Reply  Tue Nov 30 12:33:27 2010, kiwamu, Summary, IOO, cabling of in-vac PZT mirrors  
    Reply  Wed Jun 18 22:34:44 2014, ericq, Update, IOO, caget frusrtation 
    Reply  Thu Jun 19 22:04:23 2014, ericq, Update, Computer Scripts / Programs, caget/caput now return in reasonable time 
    Reply  Fri Jul 6 14:10:31 2012, yuta, Summary, LSC, calculation of FPMI using ALS 
Entry  Thu Mar 10 17:03:48 2011, Larisa Thorne, Configuration, Electronics, calculations for passive low pass filter on X arm 
    Reply  Tue Sep 27 10:50:11 2022, Paco, Update, BHD, calibrated LO phase noise lo_phase_asd.pdf
    Reply  Wed Sep 28 16:37:26 2022, Paco, Update, BHD, calibrated LO phase noise; update lo_phase_asd.pdf
    Reply  Wed Sep 28 21:54:08 2022, Paco, Update, BHD, calibrated LO phase noise; update dcpd_phase_asd.pdflo_phase_asd.pdf
    Reply  Thu Mar 7 01:43:35 2013, yuta, Update, LSC, calibrated MI differential length spectra LSCMICHOLTF_MI.pngMImotion.png
    Reply  Wed Jun 20 18:43:57 2012, yuta, Update, LSC, calibrated POX error signal LSCxarmTF_usingITMX.pngLSCxarm_HAover1plusG.pngPOXerrorcalibration.png
Entry  Tue Jun 19 23:36:19 2012, yuta, Update, LSC, calibrated POY error signal LSCyarmTF_usingITMY.pngLSCyarm_HAover1plusG.pngPOYerrorcalibration.png
    Reply  Wed Jun 20 00:01:04 2012, Jenne, Update, LSC, calibrated POY error signal LSC_POY_11_I_ERR_calib_19June2012.pdfPOY_calib_19June2012_FiltBankSettings.png
    Reply  Fri Mar 8 03:07:19 2013, yuta, Update, LSC, calibrated PRM-ITMY length spectra LSCPRCLOLTF_PRITMY.pngPRITMYmotion.png
Entry  Wed Feb 5 20:41:57 2014, Den, Update, LSC, calibrated spetra from OAF test oaf_cal.pdf
    Reply  Sun Jul 8 00:27:54 2012, yuta, Summary, Locking, calibrating phase tracking mode scan data 
    Reply  Sun Jul 8 00:58:08 2012, Koji, Summary, Locking, calibrating phase tracking mode scan data 
Entry  Wed Jun 13 17:39:13 2012, yuta, Update, Green Locking, calibrating the beatbox ALS-BEATY_COARSE_I_IN1_DQ.pngALS-BEATY_COARSE_Q_IN1_DQ.pngALS-BEATY_FINE_I_IN1_DQ.pngALS-BEATY_FINE_Q_IN1_DQ.png
Entry  Mon Dec 8 00:10:42 2008, caryn, Summary, General, calibrating the jenne laser IvsDCmax.pngdata.tar.gzjcal_dip_2_norm_log.pngjcal_flat_3_norm_log.png
ELOG V3.1.3-