  3294   Mon Jul 26 20:12:18 2010 kiwamuUpdateSUSOSEMs on PRM [Alberto and Kiwamu]
We installed the OSEMs to the new PRM.
 DSC_2279.JPG 
  3293   Mon Jul 26 14:24:46 2010 josephb, kiwamuUpdateCDSRFM test take 1Kiwamu and I strung a temporary RFM fiber
from the c1iscex machine (in the new 1X9
rack) to the c1sus machine (in the new 1X4
  
  3292   Mon Jul 26 12:31:36 2010 kiwamuUpdateCDSfront end machine for the X endA brief
report about the new front end machine "C1ISCEX"
installed on the X end (old Y end).
  
  3291   Mon Jul 26 11:15:23 2010 GopalHowToCOMSOL TipsPictures from Transfer Function Tutorial on the WikiThe attached pictures give a brief overview
of my transfer function measurement procedure
in COMSOL. For more details, please see the
 7x 
  3290   Mon Jul 26 10:04:24 2010 steveUpdateGeneralInitial Crane Inspection reveals flaws: wiring, oil and imbalance


   
        
            
 2500.JPGsedrum.JPG 
  3289   Mon Jul 26 10:02:42 2010 josephbUpdateCDSRerouted RFM around c1lsc, took RFM card out of c1lscIf you're refering to just the medm screen, 
those can be restored from the SVN. 
As we're moving to a new directory structure,
  
  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

    
        
 htempRTemp.jpg 
  3287   Sun Jul 25 18:47:23 2010 AlbertoUpdateSVNOptickle 40mUpgrade model updated to include short cavity length correctionsI uploaded an updated optickle model of
the upgrade to the SVN directory with the
optickle models (here).
  
  3286   Sat Jul 24 14:27:36 2010 ranaUpdateElectronicsFSS Oscilaltor Phase Noise MeasurementI reconnected the RF signal to the FSS
and to the FSS' EOM so that we could lock
the refcav again.
  
  3285   Sat Jul 24 14:03:19 2010 AlbertoUpdateElectronicsFSS Oscilaltor Phase Noise Measurement[Rana, Alberto]
Today we measured the phase noise
of the oscillator used for the FSS.
 FSScrystalPhaseNoiseHigherGain.pdf 
  3284   Sat Jul 24 13:13:41 2010 rana, steve, albertoUpdateGeneralInitial Crane Inspection reveals flaws: wiring and oilThe guy from KroneCrane (sp?) came today
and started the crane inspection on the X
End Crane. There were issues with our crane
  
  3283   Fri Jul 23 21:35:48 2010 ranaUpdateCDSRerouted RFM around c1lsc, took RFM card out of c1lsc I just realized that an unfortunate
casualty of this LSC work was the deletion
of the slow controls for the LSC which we
  
  3282   Fri Jul 23 21:14:29 2010 RanaUpdatePSLReference Cavity InsulationI wrapped another ~3 layers onto there.
It occurs to me now that we could just get
some 2mm thick copper plates made to fit
  
  3281   Fri Jul 23 18:55:25 2010 kiwamuUpdateSUSPRM and TT installedI updated    
  3280   Fri Jul 23 16:02:16 2010 RanaUpdatePSLReference Cavity InsulationThis is the trend so far with the copper
foil wrapping. According to Megan's calculation,
we need ~1 mm of foil and the thickness of
 Untitled.png 
  3279   Fri Jul 23 16:00:35 2010 steveUpdateSAFETYcrane load test tomorrowAll 3 cranes will be load tested at 1 ton
tomorrow morning between 9am and 2pm
Do not come to the 40m lab during
  
  3278   Fri Jul 23 15:54:38 2010 kiwamuUpdateSUSPRM and TT installed[ Jenne, Koji and Kiwamu]
 
 DSC_2275.JPG 
  3277   Fri Jul 23 15:32:02 2010 steveUpdatePEMcontrol room AC set point changedThe control room temp is warmer than usual.
The heat exchanger Office Pro 18 set point
was lowered from 70 to 68F yesterday.
  
  3276   Fri Jul 23 14:26:01 2010 GopalUpdateOptic StacksSimple Frequency Response Measurements in COMSOLOver the past couple days, I discovered
a simple, direct method for calculating
frequency responses with a combination
  
  3275   Fri Jul 23 12:33:51 2010 josephbUpdateCDSmegatron, c1iscex, c1sus firewalledKiwamu and I strung an ethernet cable from
the new 1X7 rack to the 1X3 rack. The cable
is labeled c1iscex-daq on both ends. 
  
  3274   Fri Jul 23 10:16:44 2010 josephbUpdateCDSRerouted RFM around c1lsc, took RFM card out of c1lsc I re-routed around the c1lsc machine
this morning.  I turned the crate off,
and disconnected the transmission fiber from
  
  3273   Fri Jul 23 08:18:03 2010 josephbUpdateCDSNot enough room in IO chassis for RFM card - need to swap PMC to PCIe adaptersThe End IO chassis have small trenton boards,
which apparently only have 5 usuable PCI
slots, even though there are 6 on the board.
  
  3272   Fri Jul 23 08:15:59 2010 steveUpdatePSLref cavity ion pumpThe ref cavity ion pump was running at
7.7kV instead of 5kV
This Digitel SPC-1 20 l/s ion pump
  
  3271   Fri Jul 23 00:13:11 2010 ranaUpdatePSLProblem NOT REALLY SolvedSo...who was working around the PSL rack
this morning and afternoon? Looks like there was
  
  3270   Thu Jul 22 18:18:54 2010 AlbertoUpdatePSLProblem Solved


   
        
            
  
  3269   Thu Jul 22 15:59:29 2010 AlbertoUpdatePSLPSL front end machine


   
        
            
  
  3268   Thu Jul 22 14:07:20 2010 kiwamuUpdatePSLPSL front end machineIt
looks like something wrong happened around
the PSL front end.  One
 PSL-PMC2010-07-22.png 
  3267   Thu Jul 22 13:44:47 2010 JennaUpdatePEMGuralp seismometerOne of the Guralps [Gur2] has been taken
to the atf gyro lab, along with the breakout
box.
  
  3266   Thu Jul 22 08:07:27 2010 steveUpdateVACvent finished

    
        
 30hvent.jpg 
  3265   Thu Jul 22 07:19:56 2010 AlbertoUpdateTreasureMonsters, LNVR, and Phase noise


   
        
            
  
  3264   Thu Jul 22 03:08:27 2010 KojiUpdateIOOVent and MC lockSummary

- The vacuum chambers have been vented.
  
  3263   Thu Jul 22 01:02:08 2010 ranaUpdateTreasureMonsters, LNVR, and Phase noiseOn
Picasa
  
  3262   Wed Jul 21 19:11:18 2010 DmassUpdateGreen LockinglockedWhat did you use to filter the 2f components
from your error signal? A homemade low pass
or what?
  
  3261   Wed Jul 21 17:41:17 2010 GopalConfigurationOptic StacksPictures of StacksNow that venting is complete, this is a
request for anyone who opens any chamber:
1) Please notify me immediately
  
  3260   Wed Jul 21 15:43:38 2010 MeganSummaryPSLCopper Layer Thickness on the Reference CavityUsing the equation for thermal resistance
Rthermal = L/(k*A)
where k is the thermal conductivity
  
  3259   Wed Jul 21 12:41:31 2010 kiwamuUpdateVACvent finishedThe vent
has been finished successfully in this morning.
  
  3258   Wed Jul 21 12:20:58 2010 RazibUpdatePhase CameraWeekly updateThis past week I have worked on the following:
1. Setting up the infrastructure
to do noise analysis: We added a temporary
 phase_cam_setup_21_07_2010.jpg 
  3257   Wed Jul 21 12:20:29 2010 josephb, kiwamuUpdateComputersMegatron temporarily disconnected, c1iscex firewalled, green FE testWe are moving towards a first test of getting
Kiwamu's green locking signals into the new
front end at the new X end, as well as sending
  
  3256   Wed Jul 21 12:03:14 2010 Katharine, SharmilaUpdateWIKI-40M Updateweekly updateThis past week, we levitated our small
cylindrical magnet (with the flag made from
heat shrink).  Though the levitated
  
  3255   Wed Jul 21 11:57:59 2010 GopalUpdateWIKI-40M Update7.14.10-7.21.10 Weekly UpdateSummary of this week's activities:
7/14: Analytical calculation of Viton
spring constant; updated Viton values in
  
  3254   Tue Jul 20 23:52:36 2010 kiwamuUpdateVACupdate: slow vent has startedThe
vent is still going on. At this moment the
pressure inside of the chambers is about
 untitled.png 
  3253   Tue Jul 20 18:29:43 2010 nancyUpdateIOOQPD installed behind the MC2 
Yesterday I installed teh QPD on
the table behind MC2, and observed teh signal
  
  3252   Tue Jul 20 17:38:16 2010 GopalConfigurationOptic StacksStack Type ClarificationsSome clarification is warranted regarding
the different shapes of stacks. Corrections
  
  3251   Tue Jul 20 15:06:48 2010 josephb, bobOmnistructureGeneralNew speakers in ceiling in control roomAfter the crane training, Bob attached
speakers to the ceiling right next to the
projector, for use with presentations.
  
  3250   Tue Jul 20 11:55:15 2010 Sharmila,KatharineUpdateelogMaglevWe plotted the transfer functions for the
maglev control circuit and compared them
with the plots from the spectrum 
 tf.pngP7140292.JPG 
  3249   Tue Jul 20 11:49:31 2010 JenneUpdateSUSSome Suspensions not damping[Jenne, Koji]
I moseyed into the control room this
morning, to find ITMX and ITMY both with
  
  3248   Tue Jul 20 08:04:31 2010 steveConfigurationVACslow vent has startedThe PSL shutter was closed. The beam path 
blocked two places. High voltage power supplies
to IOO and OMC PZT were checked to be off.
  
  3247   Mon Jul 19 21:47:36 2010 ranaSummaryDAQDAQ timing testSince we now have a good measurement of
the phase noise of the Rb clock
Marconi locked to the Rb clock, I wanted
  
  3246   Mon Jul 19 16:11:17 2010 GopalUpdateOptic StacksEigenfrequency Analysis of Full StackExpanding on the single-layer model, I
added the second, third, and fourth layers
to the stack in COMSOL. Eigenfrequency
 Eigenfrequency_1_4Stacks.pngEigenfrequency_2_4Stacks.pngEigenfrequency_3_4Stacks.pngEigenfrequency_6_4Stacks.png 
  3245   Mon Jul 19 14:16:01 2010 nancy, kojiUpdateIOOQPD Response Transfer Function

    
        
 QPDTF2.png 