40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 272 of 344  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  2831   Thu Apr 22 09:03:54 2010 steveOmnistructurePEMaircondition can not be turned offKoji and I wanted to turn off the IFO-room
AC so the wind would not blow on MC1-3. We
could not. The switches were probably bypassed
  
  3623   Wed Sep 29 18:28:32 2010 yutaUpdateComputersaldabella connects to the wireless networkBackground:
 We need laptops that connect
to the wireless network to use them in the
  
  3541   Tue Sep 7 23:49:08 2010 sanjitConfigurationComputersaldabella network configuration 
added name server 192.169.113.20
as the first entry in /etc/resolv.conf
  
  106   Thu Nov 15 18:06:06 2007 tobinUpdateComputersalex: linux1 root file system hard disk's dyingI just noticed that Alex made [url=http://www.ldas-sw.ligo.caltech.edu/ilog/pub/ilog.cgi?group=40m&date_to_view=11/14/2007&anchor_to_scroll_to=2007:11:14:20:00:29-aivanov]an
entry in the old ilog[/url] yesterday, saying:
"[color=red][b]Looks like linux1 root filesystem
  
  9080   Wed Aug 28 06:17:15 2013 manasaUpdateComputer Scripts / Programsalias for MATLAB2010Although Matlab 2013 has not been causing
any visible trouble so far, it takes a while
to startup.
  
  3929   Tue Nov 16 03:33:22 2010 yutaUpdateIOOaligned Faraday, beam reached SM just before PRM(Koji, Yuta)

 MCalignNov16.png 
  6713   Wed May 30 01:35:15 2012 yutaUpdateGreen Lockingaligned Y arm green beam[Jenne, Yuta]
We aligned the Y arm for IR (C1:LSC-TRY_OUT
is now ~ 0.9), and aligned the green beam
  
  6798   Tue Jun 12 01:58:33 2012 yutaUpdateGreen Lockingaligned Y arm to Y end green[Jenne, Yuta]

We aligned Y arm to the Y end green
  
  1327   Thu Feb 19 23:50:31 2009 peteUpdateLockingaligned pd's on AP tableYoichi, Peter
While continuing our efforts to lock,
we noticed the procedure failed at a point
  
  4016   Mon Dec 6 22:18:39 2010 kiwamuUpdateGreen Lockingaligned the beam axis [Suresh and Kiwamu]
We
  
  7658   Thu Nov 1 19:28:48 2012 JenneUpdateAlignmentaligned, AS beam on cameraAfter everyone else did the hard work,
I moved the AS first-on-the-table steering
mirror sideways a bit so the AS beam is on
  
  7657   Thu Nov 1 19:26:09 2012 jamieUpdateAlignmentaligned, this time without the cryingJamie, Jenne, Nic, Manasa, Raji, Ayaka,
Den
We basically walked through the entire
  
  6789   Fri Jun 8 15:08:27 2012 yutaUpdateGreen Lockingaligned/mode-matched Y green beat setupLaser temperature settings for Y arm green
work today are;
  
  1764   Mon Jul 20 12:35:21 2009 robConfigurationLockingalignment biases funnyI found the alignment biases for the PRM
and the SRM in a funny state.  It seemed
like they had been "saved" in badly
  
  7408   Wed Sep 19 09:32:24 2012 SteveUpdateSUSalignment centering jigSOS alignment tool with ID 9.5 and 6.3
mm
 IMG_1639.JPGIMG_1651.JPG 
  4044   Sat Dec 11 00:41:55 2010 kiwamuUpdateIOOalignment of IP_ANG is done  [Jenne, Koji and Kiwamu]
 
  
  4050   Tue Dec 14 01:04:23 2010 kiwamuUpdateSUSalignment of ITMs and PRM done   The alignment of the ITMs   
  5244   Tue Aug 16 04:25:34 2011 Suresh, KiwamuUpdateSUSalignment of MC output to Y-arm using PZTsWe did several things today+night. 
The final goal was to lock the PRC so that
we could obtain the POX, POY and POP beams. 
  
  7919   Fri Jan 18 15:08:13 2013 jamieUpdateAlignmentalignment of temporary half PRC[jenne, jamie]
Jenne and I got the half PRC flashing. 
We could see flashes in the PRM and PR2 face
  
  7736   Wed Nov 21 01:31:37 2012 Koji, AyakaUpdateLockingalignment on ETMX tableSince the transmission beam on ETMXT camera
seemed to be clipped, we checked the optics
on ETMX table.
 output.nv12.bmp 
  7635   Sat Oct 27 23:13:12 2012 ranaUpdateAlignmentalignment strategy Maybe we have already discarded this
idea, but why not 
  
  14603   Fri May 10 18:24:29 2019 gautamUpdateNoiseBudgetaligoNBI pulled the aligoNB git repo to /ligo/GIT/aligoNB/aligoNB.   
  7529   Thu Oct 11 11:57:40 2012 jamieUpdateCDSall IOP models rebuild, install, restarted to reflect fixed ADC/DAC layouts

    

       
            
  
  11426   Sat Jul 18 14:55:33 2015 jamieUpdateGeneralall front ends back up and runningAfter some surgery yesterday the front
ends are all back up and running:


Eric found that one of
 cds-good.png 
  5325   Tue Aug 30 14:33:52 2011 jamieUpdateCDSall front-ends back up and runningAll the front-ends are now running. 
Many of them came back on their own after
the testpoint.par
  
  8129   Thu Feb 21 15:21:07 2013 yutaUpdateVACall heavy doors on, started pumping down annulus[Steve, Manasa, Jenne, Sendhil, Evan,
Yuta]
  
  1197   Fri Dec 19 16:38:09 2008 steveUpdateLSCall optlevs centeredAll optlevs were centered after full alignment.

Qpd sums are:
  
  10132   Mon Jul 7 09:46:00 2014 SteveConfigurationSUSall sus damping restoredAll suspension damping restored. There
had to be an earth quake.
 6.9MagMexico.png 
  2036   Thu Oct 1 14:22:28 2009 robUpdateSUSall suspensions undamped

    
        
  
  2039   Thu Oct 1 19:18:24 2009 KojiUpdateSUSall suspensions undampedOps. I restored the damping of the suspensions
at around 16:30.

  
  13279   Thu Aug 31 00:46:57 2017 ranaSummaryCDSallegra -> Scientific Linux 7.3I made a
'LiveCD' on a 16 GB USB stick using
this command after the GUIs didn't work
  
  6685   Fri May 25 17:52:08 2012 JamieUpdateComputersallegra now running Ubuntu 10.04The last of the control room machines is
now upgraded.
  
  1467   Fri Apr 10 01:24:08 2009 ranaUpdateComputersallegra update (sort of)I
tried to play an .avi file on allegra. In
a normal universe this would be easy, but
  
  1007   Mon Sep 29 15:09:36 2008 steveUpdatePSLalmost 4 yrs plot of power & tempsThe water chiller is normally running 1.5
C warmer than the laser head temp.
When control room temp is stable and PEM-count_temp
 3.5y.jpg 
  2048   Mon Oct 5 02:51:08 2009 robUpdateLockingalmost thereWorking well tonight: the handoff of CARM
to RF (REFL2I), successful reduction of CARM
offset to zero, and transition control of
  
  11177   Fri Mar 27 04:36:46 2015 denUpdateLSCals->pdh transition, prcl on 1f, alignmentTonight I have modified transition steps
from als to pdh signals. I have added 1:20
filters to CARM_A and DARM_A filter banks
  
  11179   Fri Mar 27 14:47:57 2015 KojiUpdateLSCals->pdh transition, prcl on 1f, alignmentJenne and I interviewd Den this afternoon
to make the things clear

- His "duty cycle" is
 CARM_transition.pdf 
  193   Mon Dec 17 11:47:13 2007 albertoUpdateElectronicsan alternative design for the RFAM monitor's filter at 33MhzSince the Butterworth turned out o be rather
wide-band, I tried an other configuration
for the 33 MHz filter. Attached are the simulated
 RFSim99-33MHz.pngRF99-SimmButterworthPrototype.pngRFSim99-33MHz-TFplot.png 
  6828   Mon Jun 18 02:31:43 2012 yutaSummaryGreen Lockinganalysis of mode scan dataI analyzed mode scan data from last week.
Mode matching ratio for Y arm is 86.7
 coarse5FSRscan.pngfine1FSRscan.pngHOMRFSB.pngcoarse5FSRscanHOMRFSB.png 
  5790   Wed Nov 2 21:15:06 2011 KatrinUpdateCDSand again c1scy.mdl compiledI changed an ADC channel for GCY_ERR and
thus recompiled the c1scy model.
  
  8442   Thu Apr 11 03:38:40 2013 DenUpdateLockingangular motionSpectra of BS, PRM, ITMX, ITMY are attached
with oplevs ON and OFF (in units of urad).
Loops reduce RMS from ~2urad to ~0.3urad
 oplevs.pdf 
  9653   Wed Feb 19 08:07:01 2014 steveUpdatesafetyannual laser safety glasses check  
 All 40m laser safety glasses
are cleaned and measured this morning. 
 AA2014checked.jpg2014check.jpg 
  2814   Tue Apr 20 09:15:15 2010 steveSummarySAFETYannual safety audit   safa.PDF 
  14088   Thu Jul 19 13:35:30 2018 SteveSummaryVACannuloses pumped Roughing down the annuloses required closing
V1 for 13 minutes

IFO is 2.2e-5 Torr
 AnsPumped.png 
  13459   Thu Nov 30 10:38:39 2017 SteveUpdateVACannuloses are not pumpedAnnuloses are not pumped for 30 days, since
TP2 failed.  IFO pressure 7e-6 Torr
it,  Rga 2.6e-6 Torr
 AnnulosesNotPumped.png 
  2717   Sat Mar 27 16:23:10 2010 KojiUpdateSUSanother SRM sidemagnet gluedKiwamu and Koji
Last night we have released PRM from
the gluing fixture. All of the six magnets
  
  5058   Thu Jul 28 21:52:40 2011 ranaUpdateComputersanother attempt to use pianosa
    Pianosa doesn't cache the SVN
pwds so you need to re-enter at each SVN
up or commit. This is different from the
  
  5053   Thu Jul 28 16:00:28 2011 kiwamuUpdateComputer Scripts / Programsanother offset script : offset2A new offset-zeroing
script has been developed and it is ready
  
  14990   Wed Oct 23 18:40:58 2019 gautamUpdateCDSanother round of vertex FE rebootsI wanted to restart the c1oaf model. As
usual, the first time the model was restarted,
it came back online with a 0x2bad error.
  
  6136   Mon Dec 19 01:54:35 2011 kiwamuUpdateSUSanother trial of hystersis testAnother hysteresis test has begun at 1:50
PT, Dec/19.
It will finish after 3 or 4 hours.
  
ELOG V3.1.3-